RonEtt F. SAunotns innsbwk RchnkalOnter

  • VicePresident-NuckarOperations 5000 mintnbn Boutnurd

?ag"Ma=

January 24, 1996 vmomIArowan Mr. R. W. Crisp Serial No. F96-003 Regional Director Federal Energy Regulatory Commission 3125 Presidential Parkway, Suite 300 Atlanta, Georgia 30340

Dear Mr. Crisp:

PROJECT NO. 6335-VA NORTH ANNA HYDROELECTRIC PROJECT STATEMENT _ OF DAM OPERABILITY TESTS Pursuant to the provisions of 18 CFR 12.44(b)(2), the annual statement is j

hereby submitted ve-ifying that each spillway gate has been operated at least once during the twelve months preceding the annual inspection by the FERC Regional Engineer.

The last annual inspection was conducted by Mr. J. C. Lyon, Jr. on August 24,1995. As required by 18 CFR 12.44(c)(1), the annual statement describing the intervals at which the standby emergency power was load tested during the year preceding the inspection is also provided. During 1995, the main dam spillway emergency diesel generator was load tested on a monthly basis in accordance with approved station procedures. Verification of this information is provided on the attached form in accordance with 18 CFR 12.13.

The main dam's five spillway gates (three radial gates and two skimmer gates) were satisfactorily tested from their full open to full close positions between June 21,1995, and July 12,1995, as specified on the attached form. The gates' stop legs were in place during the performance of these tests.

Satisfactory operation of one spillway gate using power supplied by the spillway's emergency diesel generator was observed by Mr. Lyon during the August 24,1995 inspection.

If you have any questions, please contact us.

Very truly yours, I

/

R. F. Saunders Attachments 960129o214 960124 ADOCK0500gG ji DR g

cc:

United States Nuclear Regulatory Commission

Attention: Document Control Desk Washington, D.C. 20555 Docket Nos.

50-338 and 50-339 License Nos. NPF-4 and NPF-7 United States Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station

State of Virginia, i

County of Henrico, ss:

)

The undersigned, being first duly sworn, states that he has read the above document and knows the contents of it, and that all of the statements contained in that document are true and correct, to the best of his knowledge and belief.

R. F. Saunders, Vice President - Nuclear Operations Swom to and subscribed bgme thisaday of 199/(

28

~ N1 dl, Notary Pu6lic' ~

~

)

ATTACHMENT 1

~

FERC PROJECT NO.

6335-VA NAME North Anna Hydroelectric Project DEVELOPMENT NAyr LICENSE /EXEMPTEE/ APPLICANT Exemptee ANNUAL SPILLWAT GATE OPERATION CERTIFICATION FULL DATE OF GATE OPENING DATE OF OPENING LAST FULL 1/ HEIGHT fFT.1 OPERATION PURPOSE 1/,

(FEET) OPENING M

-A 32 06/21/95 Penodic Testino 32 07/01/94 RG-1 B 32 06/27/95 Periodic Testino 32 07/07/94 RG-1C 32 07/05/95 Periodic Testino 32 07/13/94 SG-1 7

07/11/95 Periodic Testina 7

07/01/94 SG-2 7

07/12/95 Periodic Testino 7

07/05/94 PROBLEMS NOTED/ MAINTENANCE REQUIRED:

1 The above gate (s) was (were) operated s in ated by:

e/A

( Signature / of operator)

TYPE OF EMERGENCY OPERATION MANUAL Y

STANDBY POWER SOURCE DESCRIBF Emeroency DieselGenerator (Mark No.1-EE EG-4)

DATE OF LAST TEST:

08/24/95 GATE OPERATED:

RG-1 B PROBLEMS NOTED/ MAINTENANCE REQUIRED:

None.

The standby power source was oad-t.s d as indicated by:

Signatune ' of operator)

The undersigned, being first dul

sworn, states that he has read the above document and knows the contents of it, and that all l

of the statements contained in that document are true and correct, to the best of his knowledge and belief.

'^

(Appropriate company official)

Sworn to me and subscribed before me this 2 Y of 19 $

o,_

Day Month /

[ SEAL)

/

(N6tary) 1/ Attach additional sheets if more space is required.

1/ Flood passage, test, maintenance, etc.

1/ Full gate operation must be performed at least once every 5

/ ears.

l I

St: tam:nt of Dam Operability Tests Strial No. F96-003 Page 1 of 1

1 SEDG Load Test Intervals Test Procedure Revision Comoletion Date Results 1.

0-PT-1 2

08/16/94 Satisfactory 2.

0-PT-1 2

09/15/94 Satisfactory 3.

0-PT-1 2

10/11/94 Satisfactory 4.

0-PT-1 2

11/08/94 Satisfactory 5.

0-PT-1 2

12/06/94 Satisfactory 6.

0-PT-1 2

01/04/95 Satisfactory 7.

0-PT-1 2

02/01/95 Satisfactory 8.

0-PT-1 2

03/11/95 Satisfactory 9.

0-PT-1 2

03/28/95 Satisfactory

10. 0-PT-1 2

04/25/95 Satisfactory

11. 0 PT-1 2

05/23/95 Satisfactory

12. 0 PT-1 2

06/20/95 Satisfactory

13. 0-PT-1 2-P1 07/10/95 Satisfactory
14. 0-PT-1 2-P1 08/15/95 Satisfactory l