Monthly Operating Repts for Sept 1995 for Ei Hatch Plant
ML20093E524
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/30/1995
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20093E523 List:
References
NUDOCS 9510160267
Download: ML20093E524 (10)


Text

.

t Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report September 1995 Table of Contents i

i bS l Narrative Report El-1 Operating Data Report El-2 1

j Average Daily Power Level El-3 1 Unit Shutdowns and Power Reductions El-4 i

1 i

l f

I e

e i

1 I

111,5044 W10160267 951009

';i: ADOCK 05000321 r DR . ._

pg7]

DOCKET NO.: 50-321 PLANT E. I. HATCH - UNIT ONE DATE: 1995 NARRATIVE REPORT OCTOBER COMPLETED BY: S 2' B. ROGERS TELEPHONE: (912) 367-7781 x2878 l SEPTEMBER 1 0000 Shift continued to maintain rated thermal power.

SEPTEMBER 1 2315 Shift began reducing load to approximately 690 GMWe to perform Control Rod Drive Exercises on selected control rod drives.

SEPTEMBER 2 0212 The unit attained rated thermal power.

SEPTEMBER 8 2315 Shift began reducing load to approximately 720 GMWe to perform l Control Rod Drive Exercises on selected control rod drives.

SEPTEMBER 9 0252 The t.11t attained rated thermal power.

SEPTEMBER 16 0825 Shift began reducing load to approximately 450 GMWe to perform a Co 'rol Rod Sequence Exchange, Control Rod Drive Exercises on selected control rod drives, and Control Rod Scram Time Testing.

SEPTEMBER 16 1529 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power. i l

SEPTEMBER 18 0830 The unit attained rated thermal power.

SEPTEMBER 23 2140 Shift be an reducing load to approximately 675 GMWe to perform Control !cd Drive Exercises on selected control rod drives and a Rod Pattern Adjustment.

SEPTEMBER 23 2350 Shift began ascension to rated thermal power. Fuei preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.

SEPTl w i 24 1352 The unit attained rated thermal power.

l SEPTEMBER 29 2300 Shift beked Drive Exercises on selected control rod drives.an reducing lo; Control SEPTEMBER 30 0141 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.

SEPTEMBER 30 0513 The unit attained rated thermal power.

SEPTEMBER 30 2400 Shift continued to maintain rated thermal power.

El-1

OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: OCTOBER 2, 1995 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS 1

1. UNIT NAME: E. I. HATCH - UNIT ONE
2. REPORT PERIOD: SEPTEMBER 1995
3. LICENSED THERMAL POWER (MWt : 2436
4. NAMEPLATE RATING (GROSS MWe : 850
5. DESIGN ELECTRICAL RATING fN T MWe): 776.3
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe 774
7. MAXIMUM DEPENDABLE CAPACITY 741 8.(ITEM IF 3CHANGES OCCUR IN CAPACITY (NET MWe):):

RATINGS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES

9. M ER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 720.0 6551 173110 l 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 6551.0 132192.6 ,
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR DN LINE
720.0 6551.0 127051.1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1728514 15515028 286567367

" 17. GROSS ELECTRICA'. ENERGY GENERATED (WHe): 560143 5049419 92161735

18. NET ELECTRICAL (NERGY GENERATED (WHe): 535558 4830931 87728637
19. UNIT SERVICE FACTOR: 100.0% 100.0% 73.4%
20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 73.4%
21. UNIT CAPACITY FACTOR USING MDC NET): 100.4% 99.5% 67.7% l l' 22. UNIT CAPACITY FACTOR USING DER NET): 95.8% 95.0% 65.0%
23. UNIT FORCED OUTAGE RA E: 0.0% 0.0% 10.8%

i i

24. SHUTDOWNS SCHEDULED 42 Day Refueling Outage OVER THE NEXT tentatively schedule 6 MONTHS (TYPE,d for MarchDATE, AND DURAT 23, 1996.
25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: N/A 26.UNITSINTESTSTATUS(PRIORTOCOMM$RCIALOPERATION): N/A i

i i

l

l 3

El-2 a

j t v

l

. \

l PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: OCTOBER 2, 1995 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 SEPTEMBER 1995 l

I DAY Net MWe

' 748 1 ..............

2 .............. 753 3 .............. 756 4 .............. 756 755 t 5 ..............

6 .............. 758 7 .............. 755 8............... 748 9 .............. 749 10 .............. 751 11 .............. 752 12 .............. 750 13 .............. 749 l

4 14 .............. 750 15 .............. 751 16 .............. 590 17 .............. 658 18 .............. 749

19 .............. 758 20 .............. 755
21 .............. 754 22 .............. 750
23 .............. 742 24 .............. 745 25 .............. 761

! 26 .............. 756 l 27 .............. 755 28 .............. 756 29 .............. 753 1 30 .............. 753 l

s e

N t El-3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: OCTOBER 2, 1995 UNIT NAME: E. I. HATCH - UNIT ONE COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: SEPTEMBER 1995 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 95-006 950916 S 0.0 F 5 N/A RC FUELXX Shift reduced load to RB CONR00 approximately 450 GMWe to perform a Control Rod Sequence Exchange and Control Rod Scram Time Testing. While at reduced power Shift performedControlRodDrive Exercises on selected control rod drives.

4 TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

4 F-FORCED 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED A-EQUIPMENT B-MAINTENANCE OR TEST FAILURE (EXPLAIN) 2-MANUAL DAILY SCRAM POWER LEVEL FOR C-REFUELING 3-AUTOMATIC 3 CRAM THE PRECEDING 24 HOURS.

4 D-REGULATORY RESTRICTION 4-CONTINVAT'.ONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION

F-ADMINISTRATIVE 9-0THER (EXPLAIN)

G-OPERATIONAL ERROR (uPLAIN)

H-0THER (EXPLAIN)

El-4

Enclosure 2 Plant Hatch Unit 2 Monthly Operating Report September 1995 Table of Contents i

1 Page 4

i Narrative Report E2-1 Operating Data Report E2-2 j

l.  !

l Average Daily Power Level E2-3

! Unit Shutdowns and Power Reductions E2-4 1

l l

t A

l l

3 i

j i 1 I

d s

1

(

t 1

I i

III,5044 2'

I PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: 1995 OCTOBER COMPLETED BY: S. 2, B. R0GERS NARRATIVE REPORT TELEPHONE: (912) 367-7781 x2878 Shift continued to maintain maximum achievable thermal power l SEPTEMBER 1 0000 with End-of-Cycle Coastdown in progress.

SEPTEMBER 1 2013 Shift began reducing load to approximately 440 GMWe to determine

' the cause of a rapid decrease in Circulating Water Flume level.

, Shift personnel discovered that the fill material in Cell 10 of Cooling Tower No. 5 had collapsed and clogged the screens at the tower.

4 SEPTEMBER 1 2140 Shift isolated and bypassed Cooling Tower No. 5 for inspection of the damaged cell.

SEPTEMBER 2 1514 Shift manually scrammed the reactor due to decreasing vacuum on the "A" Main Condenser as a result of "D" Waterbox becoming airbound.

SEPTEMBER 4 0033 Shift began withdrawing control rods for unit startup.

SEPTEMBER 4 0837 Shift brought the reactor critical. ,

1 SEPTEMBER 5 0017 Shift tied the unit to the grid and began ascension to maximum achievable thermal power. Fuel preconditioning measures were implemented to revent fuel degradation during ascension to  ;

maximum achievagle thermal power.

SEPTEMBER 5 2325 The unit attained maximum achievable thermal power.

SEPTEMBER 14 0855 Control Rod 42-19 drifted full-in when a half scram occurred during performance of Channel "B" Response Time Testing. The unit stabilized at approximately 615 GMWe, Maintenance personnel determined the control rod drive's Scram Solenoid Valves were leaking. Both valves were replaced.

SEPTEMBER 14 2345 Shift began reducing load to a I withdrawing Control Rod 42-19.pproximately 550 GMWe prior to SEPTEMBER 15 0108 Shift withdrew Control Rod 42-19 to Position 48.

SEPTEMBER 15 0200 The unit attained maximum achievable thermal power.

SEPTEMBER 22 0800 Shift began reducing load in preparation for a unit shutdown.

SEPTEMBER 23 0101 The unit entered the 12th Refueling Outage when Shift inserted a manual scram and a turbine trip.

SEPTEMBER 26 2320 Shift began core unload.

SEPTEMBER 30 2400 Personnel continued activities associated with the 12th Refueling Outage.

E2-1 l

l

1 OPERATING DATA REPORT DOCKET NO: 50-366 DATE: OCTOBER 2, 1995 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS:

1. UNIT NAME: E. I. HATCH - UNIT TWO
2. REPORTING PERIOD: SEPTEMBER 1995
3. LICENSED THERMAL POWER (MWt : 2436
4. NAMEPLATE RATING (GROSS MWe : 850
5. DESIGN ELECTRICAL RATING (N T MWe): 784
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 798
7. MAXIMUM DEPENDABLE CAPACITY 765
8. IF CHANGES OCCUR IN CAPACITY (NET MWe):

RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES

9. NWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 720.0 6551 140736
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 487.6 6082.5 109442.4
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 472.0 5912.7 105674.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
951897 13848602 234I09526
16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
17. GROSS ELECTRICAL ENERGY GENERATED (W 305060 4544230 4339657 76682280 73045472
18. NET ELECTRICAL ENERGY GENERATED (WHe): 286974
19. UNIT SERVICE FACTOR: 65.4% 90.2% 75.1%
20. UNIT AVAILABILITY FACTOR: 65.4% 90.2% 75.1% i
21. UNIT CAPACITY FACTOR USING MDC NET): 52.1% 86.6% 67.9% i
22. UNIT CAPACITY FACTOR USING DER NET): 50.8% 84.5% 66.2%
23. UNIT FORCED OUTAGE RA E: 10.8% 7.0% 7.0% i i
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH): N/A ESTIMATEDDATEOF,STARTUP: I
25. IF SHUTDOWN Generator AT on END OF REPORT line tentatively sc PERIOD, heduled for November 4,1995
26. UNITS IN TEST STATUS (PRIOR TO C M ERCIAL OPERATION): N/A 4

E2-2 1

e

J PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 l DATE: OCTOBER 2, 1995 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. R0GERS SEPTEMBER 1995 DAY Net MWe 1 .............. 621 2 .............. 242 3 .............. 0 4 .............. 0 5 .............. 486 6 .............. 681 7 .............. 662 8 .............. 665 9 .............. 662 10 .............. 658 11 .............. 657 12 .............. 651 13 .............. 648 14 .............. 626 15 .............. 643 16 .............. 639 17 .............. 632 18 .............. 633 19 .............. 634 20 .............. 630 21 .............. 625 22 .............. 362 23 .............. 0 24 .............. 0 25 .............. 0 26 .............. 0 27 .............. 0

28 .............. 0 l 29 .............. 0

. 30 .............. 0 e

i E2-3 9