Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
ML20216E032
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/28/1998
From: Shannon Rogers, Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5585, NUDOCS 9803170402
Download: ML20216E032 (7)


Text

, Lewis Summer Southern Nuclear Vee President Operating Company,Inc.

,,[ " Hatch Project Support 40 invemess Parkway i

. Post Office Box 1295 l Birminginm. Alabama 35201 i Tel 20599D279 Fax 205.992.0341 SOUTHERN h  !

COMPANY March 10, 1998 #"' # #

  • I""' #"

Docket Nos. 50-321 50-366 HL-5585 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Monthly Operatine Reports Gentlemen:

Enclosed are the February 1998 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications requirements.

Sincerely, WA .

H. L. Sumner, Jr.

IFUeb

Enclosures:

1. February Monthly Operating Report for Plant Hatch Unit 1
2. February Monthly Operating Report for Plant Hatch Unit 2 cc: Southern Nuclear Operatine Company Mr. P. H. Wells, Nuclear Plant General Manager NORMS U. S. Nuclear Remdatorv Commission. Washington D. C.

Mr. L. N. Olshan, Project Manager - Hatch -

y )

.(' S. Nuclear Rerulatorv Commission. Reeion 11 Mr. L. A. Reyes, Regional Administrator

, . t. v e Mr. B. L. Holbrook, Senior Resident Inspector - Hatch Utilitv Data institute. Inc.

Ms. Barbara Lewis - McGraw-Hill Companies pgy .......

9803170402 980228 PDR ADOCK 05000321 R PDR L

4

. Enclosure i Plant Hatch Unit 1 Monthly Operating Report February 1998 Table of Contents EARC Operating Data Report El-1 Unit Shutdowns and Power Reductions El-2 l

OPERATING DATA REPORT l

Docket No.: 50-321 Unit Name: E. l. Hatch Unit 1 j Date: March 2,1998 '

Completed By: S. B. Rogers Telephone: (912) 367-7781 x2878 OperatingEtatus

1. Reporting Period: FEBRUARY 1998
2. Deslyn Electrical Rating (Not MWe): 822.1 3
3. Maximum Dependable Capacity (Net MWe): 800 IhtsjAonth Year To Date Cumulative
4. Number of Hours Reactor Was Critical: 672.0 1,416.0_ 151,396.2
5. Hours Generator On Line: 672.0 1,416.0 145,981.8
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated: 534,267 1,133,090 102,225,504 CHALLENGES TO MAIN STEAM RELIEF / SAFETY VALVES DEte Tag No. Event Description No challenges this month.

E1-1

i UNIT SHUTDOWNS

. Docket No.: 50-321 Unit Name: E.1. Hatch Unit 1 Date: March 2,1998 Completed By: S. B. Roge_rs Telephone: (912) 367 7781 x2878 Reporting Period: FEBRUARY 1998 Type Method of '

r: ree.e Duration Shutting Cause/ Corrective Actions No. Date e ace.u.e (Hours) Reason (1) Down (2) Comments No unit shutdowns occurred this month.

J (1) Reason: (2) METHOD A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restricton 4-Continuation E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

'l NARRATIVE REPORT Unit 1 operated at rated thermal power for most of the month of February. Shift reduced load to approximately 620 GMWe on 2/21/98 to perform a control rod sequence exchange, scram time testing, and control rod drive cxercises on selected control rod drives. Inspection and maintenance were also performed in the condenser bay.

Shift further reduced load to approximately 510 GMWe on 2/21/98 to remove "B" Reactor Feedwater Pump from service to replace a bushing on the Torque Arm Assembly. "B" Reactor Feedwater Pump was returned to service tnd the unit was returned to rated thermal power on 2/22/98. Shift reduced power to approximately 97% of rated thermal on 2/23/98 to perform a rod pattern adjustment. The unit was returned to rated thermal power on 2/23/98.

E1-2

t .- -

. Enclosure 2 Plant Hatch Unit 2 Monthly Operating Report February 1998 Table of Contents EASC Operating Data Report E2-1 Unit Shutdowns and Power Reductions E2-2 l

I l

I

, OPERATING DATA REPORT Docket No.: 50-366 Unit Name: E.1. Hatch Unit 2 Date: March 2,1998 Completed By: S. B. Rogers Telephone: (912) 367-7781 i.378 OperatingDtatus

1. Reporting Period: FEBRUARY 1998
2. Design Electrical Rating (Net MWe): 829.7
3. Maximum Dependable Capacity (Net MWe): 818 IbittMonth Year To Date Cumulative
4. Number of Hours Reactor Was Critical: 672.0 1,416.0 128,260.1
5. Hours Generator on Line: 672.0 1,416.0 124,267.7
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated: 549,341 1,153,617- 87,966,363 CHALLENGES TO MAIN STEAM RELIEFI SAFETY VALVES Date Tag No. Event Descriphon No challenges this month.

E2-1

...~

UNIT SHUTDOWNS

. Docket No.: 50-366 Unit Name: ~B.1. Hatch Unit 2 Date: March 2,1998 Completed By: S. B. Rogers Telephone: (912) 367TN81 x2879 Reporting Period: FEBRUARY 1998 Type Method of F Fwees Duratio9 Shutbng Cause/ Corrective Actions No. Date a sen.a.m.e (Hours) Reason (1) Down (2) Comments No unit shutdowns occurred this month.

(1) Reason: (2) METHOD A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

CAUSE/CORRECTNE ACTIONICOMMENTS:

NARRATIVE REPORT Unit 2 operated at rated thermal power for the entire month of February.

E2-2