4 Revised Page El-2 for Plant Hatch Unit 1 Monthly Operating Report Anril 1996 l
]
NOTE: The attached page is being revised as a result of an error in calculation of several parameters due to the use of Central Standard Time (CST) rather than Eastern Standard Time (EST).
i 4
t 4
a i
e f
t 9608130177 960809 PDR ADOCK 05000321 R
pop HL-5218
l 1
6 OPERATING DATA REPORT DOCKET NO.:
50-321 l
DATE: MAY 3,1996 COMPLETED BY:
S. 8. ROGERS l
OPERATING STATUS
- 1. UNIT NAME:
E. I. HATCH - UNIT ONE
- 2. REPORT PERIOD:
APRIL 1996
- 3. LICENSED THERMAL POWER (MWt :
2436
- 4. NAMEPLATE RATING (GROSS MWe :
850
- 5. DESIGN ELECTRICAL RATING IN MWe :
776.3 j
- 6. MAXIMUM DEPENDABLE CAPACI'IY GROS We):
789
- 7. MAXIMUM DEPENDABLE CAPACITY NET We 756 i
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS):
1 ITEMS 3 THROUGH 7 SINCE LAST REPORT, GIVE REASONS: NO CHANGES 9.
ER LEVEL TO WHI H RESTRICTED, IF ANY (NET We):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A
~
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2903 178222
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
55.6 1979.0 136380.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE:
0.0 1882.3 131142.4 2
- 15. UNIT P.ESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 3
- 16. GROSS MERMAL ENERGY GENERATED (MWHt):
9201 3913084 295721850
- 17. GROSS Ell:CTRICAL ENERGY GENERATED (MWHe):
0 1236382 95108714 i
- 18. NET FLECTRICAL ENERGY GENERATED (MWHe):
-6788 1162899 90526439
- 19. UNIT SERVICE FACTOR:
0.0%
G4.8%
73.6%
- 20. UNIT AVAILABILITY FACTOR:
0.0%
64.8%
73.6%
21.UNITCAPACITYFACTOR(USINGMDCNET:
0.0%
53.0%
67.8%
- 22. UNIT CAPACITY FACTOR i USING DER NET :
0.0%
51.6%
65.2%
- 23. UNIT FORCED OUTAGE RA'IE:
100.0%
5.2%
10.6%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH):
N/A 25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOF,STARTUP:
Generator was tied to line May 2, 1996.
- 26. UNITS IN TEST STATUS (PRIOR TO COMERCIAL OPERATION):
N/A i
l El-2