Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant
ML20101R081
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/31/1996
From: Beckham J, Shannon Rogers
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5144, NUDOCS 9604160047
Download: ML20101R081 (13)


Text

, Georgb Power Company

, 40 invemess Center Parkwry l Post Office Box 1295 )

Barrt'ngham, Alabama 35201 j Telephone 205 877 7279 - .

l}

\- J. T. s.ckham, Jr. Georgia Power  !

Vice President - Nuclear Hatc.h Project the southern elec!rc system Apr11-9, 1996 Docket Nos. 50-321 HL-5144

.50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Monthly Operatine Reports Gentlemen:

Enclosed are the March 1996 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications requirements.

Sincerely, f h&-

J. T. Beckham, Jr.

SRP/sp

Enclosures:

1. March Monthly Operating Report for Plant Hatch Unit 1
2. March Monthly Operating Report for Plant Hatch Unit 2 cc: (See next page.)

1 ~, A 1 1 W 9604160047 960331 PDR ADOCK 05000321 R PDR 2 /

g

' GeorgiaPower d U. S. Nuclear Regulatory Commission Page 2 April 9, 1996 cc: Georzia Power Company Mr. H. L. Sumner, Nuclear Plant General Manager NORMS U. S. Nuclear Regulatorv Commission. Washington D. C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region H Mr. S. D. Ebneter, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch Utility Data Institute. Inc.

Mr. Fred Yost, Director - Research Services t

l l

!!L 5144

Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report March 1996 Table of Contents -

Page Narrative Report El-la Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4 9

In 5144 i

T PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 i

DATE: 1996

, NARRATIVE REPORT APRIL COMPLETED BY: 3,S. B. ROGERS

TELEPHONE
(912) 367-7781 x2878 l

3 MARCH 1 0000 Shift continued to maintain maximum achievable thermal power.

MARCH 1 1035 Shift began reducing load to approximately 535 GMWe to perform

Control Rod Drive Exercises on selected control rod drives. The i servo strainers on Main Turbine Control Valves Nos.1, 2, and 4 were replaced to inspect for ci(TCVs)ogging.

MARCH 1 1950 Shift began ascension to maximum achievable thermal power.

j MARCH 2 0305 The unit attained maximum achievable thermal power.

MARCH 8 2004 Shift began reducing load to approximately 545 GMWe to perform

Control Rod Drive Exercises on selected control rod drives.

] MARCH 8 2125 Shift began ascension to maximum achievable thermal power.

l MARCH 9 0517 The unit attained maximum achievable thermal power.

i MARCH 9 1554 Shift Groupbegan reducing 2 Primary load after Containment receiving Isolation a partial signal. (outboard)

A faulty relay co il

resulted in a blown Group 2 logic power fuse. The outboard Group 2 isolation valves closed per design, u The fuse and relay coil,were replaced,pon loss of logic power.and the Gro
signal was reset.

MARCH 9 1702 Shift began ascension to maximum achievable thermal power. Fuel

preconditioning measures were implemented to prevent fuel degradation during ascension.

l j MARCH 9 2140 The unit attained maximum achievable thermal power.

! MARCH 16 0145 Shift began reducing load to approximately 400 GMWe to remove ,

l Circulating Water Pump "B" from service for pre-outage l maintenance on the pump motor.

Shift began reducing load in preparation for a unit shutdown.

MARCH 22 1938 1

El-la I

i 4

?LANT E. I. RATCH - UNIT ONE DOCKET NO.: 50-321 DATE: APRIL 3, 1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 i MARCH 23 0135 The unit entered the 16th Refueling Outage when Shift manually tripped the Main Turbine. Reactor power was reduced in preparation for shut down. When the turbine was shut down, l reactor pressure increased and exceeded the high pressure scram setpoint, causing an automatic reactor shutdown, per design.

The Main Turbine operating procedure did not require reactor i pressure to be decreased to provide a sufficient margin between actual pressure and the high pressure scram setpoint prior to tripping the Main Turbine.

MARCH 26 2210 Shift began core unload.

I MARCH 30 1811 Shift completed core unload.

MARCH 31 2400 Personnel continued activities associated with the 16th Refueling Outage.

1 l

i i

l El-lb 1

4

I i .

+ . . l l

OPERATING DATA REPORT DOCKET NO.: 50-321 '

DATE: APRIL 3, 1996 COMPLETED BY: S. B. ROGERS  :

OPERATING STATUS l

1. UNIT NAME: E. I. HATCH - UNIT ONE l
2. REPORT PERIOD: MARCH 1996  ;
3. LICENSED THERMAL POWER (  : 2436 )
4. NAMEPLATE RATING (GROSS  : 850 '

i 5. DESIGN ELECTRICAL RATING N T MWe : 776.3

6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 789
7. KAXIMUM DEPENDABLE CAPACITY NET MWe 756 i;
8. IF CHANGES OCCUR IN CAPACITY RATINGS):

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 2184 177503 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 529.6 1923.4 136324.9

, 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0

14. HOURS GENERATOR ON LINE: 529.6 1882.3 131142.4 1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 !
16. GROSS THERMAL ENERGY GENERATED MWHt): 945074 3903882 295712649
17. GROSS ELECTRICAL ENERGY GENERAT D (MWHe): 294930 1236382 95108714 )
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 276591 1169687 90533227 l
19. UNIT SERVICE FACTOR: 71.0% 86.1% 73.9%  !

l 20. UNIT AVAILABILITY FACTOR: 71.0% 86.1% 73.9% i

21. UNIT CAPACITY FACTOR USING MDC NET : 49.2% 70.8% 68.1%
22. UNIT CAPACITY FACTOR USING DER NET : 47.9% 69.0% 65.4% i
23. UNIT FORCED OUTAGE RA E: 0.0% 4.4% 10.6% 1

, 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH): N/A l 25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDkTEOFSTARTUP:

Generator on line tentatively scheduled for April 24, 1996.

4

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A i

i i

a El-2 l

l 1

PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: APRIL 3, 1996 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 DAY Net MWe 1 .............. 561 2 .............. 610 4

3 .............. 602 598 4 ..............

5 .............. 593 6 .............. 587 7 .............. 585 8 .............. 578 9 .............. 582 10 .............. 589 11 .............. 583 12 .............. 582 13 .............. 577 14 .............. 573

- 15 .............. 555 16 .............. 396 17 .............. 402 18 .............. 408 i

19 .............. 409 20 .............. 425 21 .............. 426 22 .............. 378

! 23 .............. O

24 .............. 0 25 .............. 0 26 .............. 0 27 .............. O i 28 .............. 0 29 .............. 0 30 .............. 0 31 .............. O i

e i

T i

El-3 i

i

! UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: 1996 UNIT NAME: E. I. HATCH - UNIT ONE APRIL COMPLETED BY: 3,S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: MARCH 1996 i

R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE

)96-002 960316 S 0.0 B 5 N/A HF MOTORX Shift reduced load to

~j approximately 400 GMWe to remove Circulating Water Pump "B" from service for pre-outage maintenance on j the pump motor.

i 96-003 960323 S 214.4 C 3 96-004 RC FUELX The unit entered the 16th Refueling Outage when Shift manually tripped the Main f Turbine. An automatic reactor .

' scram occurred on high i reactor pressure following the turbine trip. The Main Turbine operating procedure

, is being revised to provide a sufficient margin to the high pressure scram j setpoint.

t TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

, F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) l El-4

)

t .

Enclosure 2 ,

Plant Hatch Unit 2 Monthly Operating Report March 1996 Table of Contents P_ age j Narrative Report E2-1 Operating Data Report E2-2 Average Daily Power Level E2-3

! Unit Shutdowns and Power Reductions E2-4 1

9 J

111-5144

i i PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 i DATE: APRIL 3, 1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS

TELEPHONE
(912) 367-7781 x2878

. MARCH 1 0000 Shift continued to maintain rated thermal power.

MARCH 12 0923 reparation for a unit shutdown to Shift replace began Main reducing load Steam Line in p/ Relief Valves (SRVs)"D" and "H".

Safety MARCH 12 1702 Shift manually scrammed the reactor in preparation for replacing Main Steam Line SRVs "D" and "H".

MARCH 14 2135 Shift began withdrawing control rods for unit startup.

MARCH 15 0308 Shift brought the reactor critical.

l MARCH 16 0345 ShifttiedtheMainGeneratortothe!ridandbeganascensionto rated thermal power. Fuel preconditio ing measures were implemented to prevent fuel degradation during ascension.

I MARCH 17 1556 The unit attained rated thermal power.

MARCH 18 0815 Shift began reducing load to approximately 685 GMWe to perform a Rod Pattern Adjustment.

I MARCH 18 1208 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension.

MARCH 18 2027 The unit attained rated thermal power.

MARCH 23 1005 Shift began reducing load to approximately 660 GMWe to perform i a Rod Pattern Adjustment.

MARCH 23 1305 Shift began ascension to rated thermal power. Fuel preconditioning l measures were implemented to prevent fuel degradation during l ascension.

t

! MARCH 23 2340 The unit attained rated thermal power.

i MARCH 31 2400 Shift continued to maintain rated thermal power.

i

  • j i l
E2-1 l

i__

l i )

i OPERATING DATA REPORT DOCKET NO: 50-366 DATE: 1996 l COMPLETED APRIL BY: 3,S. B. ROGERS l TELEPHONE: (912) 367-7781 x2878 1

OPERATING STATUS
l
1. UNIT NAME: E. I. HATCH - UNIT TWO
2. REPORTING PERIOO: MARCH 1996 1

' 3. LICENSED THERMAL POWER (MWt : 2558 i

4. NAMEPLATE RATING (GROSS MWe : 850
5. DESIGN ELECTRICAL RATING (N T MWe): 784
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe 844 l i
7. MAXIMUM DEPENDA8LE CAPACITY 809 4

8.(ITEMS IF CHANGES OCCUR IN CAPACITY (NET MWe):):

RATINGS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS i 10. REASONS FOR RESTRICTION, IF ANY: N/A

] THIS MONTH YEAR-TO-DATE CUMULATIVE j 11. HOURS IN REPORTING PERIOD: 744.0 2184 145129

, 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 685.9 2125.9 112607.5

13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 661.3 2101.3 108752.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 i 16. GROSS THERMAL ENERGY GENERATED (NWHt): 1629554 5219207 241585008 j 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 548839 1757507 79191766
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 525637 1687227 75444688 )
19. UNIT SERVICE FACTOR: 88.9% 96.2% 74.9%
20. UNIT AVAILABILITY FACTOR: 88.9% 96.2% 74.9%
21. UNIT CAPACITY FACTOR USING MDC NET): 87.3% 95.5% 68.0%

i 22. UNIT CAPACITY FACTOR USING DER NET): 90.1% 98.5% 66.3%

. 23. UNIT FORCED OUTAGE RA E: 0.0% 0.0% 6.9%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH): N/A
25. IF SHUTDOWN AT.END OF REPORT PERIOD ESTIMATEDDdTEOFSTARTUP: N/A 26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION): N/A i

i 9

4 E2-2 l

1 1

PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: 1996 AVERAGE DAILY POWER LEVEL APRIL COMPLETED BY: 3,S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 1

DAY Net MWe 1 .............. 827 2 .............. 828 3 .............. 827 4 .............. 828 5 .............. 826 6 .............. 824 7 .............. 824 8 .............. 830 9 .............. 830 10 .............. 830 11 .............. 828 12 .............. 408 13 .............. 0 14 .............. 0 15 .............. 0 16 .............. 234 17 .............. 725 18 .............. 771 19 .............. 827 20 .............. 830 21 .............. 830 22 .............. 829 23 .............. 779 24 .............. 828 25 .............. 826 26 .............. 824 27 .............. 823 28 .............. 825 20 .............. 827 4

30 .............. 826 31 .............. 826 1

E2-3 l

= .

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-366 DATE: APRIL 3, 1996 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2.878

REPORT MONTH
MARCH 1996 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBC00E) PREVENT RECURRENCE 96-003 960312 F 82.7 A 2 N/A CC VALVEX The unit was manually (X) scrammed to replace Main (B) Steam Line SRVs "D" and "H".

]

Main Steam Line SRVs

"D" and "H" were replaced, and the unit was returned to rated thermal power.

i 1

TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20% i F-FORCED I-MANUAL REDUCTION IN AVERAGE 1

~

S-SCHEDULED A-EQUIPMENT B-MAINTENANCE OR TEST FAILURE (EXPLAIN) 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

, D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION

F-ADMINISTRATIVE 9-0THER(EXPLAIN) i G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN)

E2-4 J