Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217D306 | 13 October 1999 | SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation | Earthquake |
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A664 | 13 September 1999 | Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program | |
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | |
ML20210J963 | 2 August 1999 | SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 | Stroke time |
ML20210J927 | 2 August 1999 | SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding | Backfit |
HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20207E763 | 3 June 1999 | Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable | Hydrostatic VT-2 Incorporated by reference |
HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with | |
ML20206G169 | 4 May 1999 | SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) | |
HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20207M189 | 11 March 1999 | SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld | Nondestructive Examination Incorporated by reference |
HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20206P698 | 7 January 1999 | Ehnp Intake Structure Licensing Rept | Coatings Aging Management Earthquake |
HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20196J493 | 7 December 1998 | Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 | |
HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With | |
ML20155B612 | 28 October 1998 | Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable | |
HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20153G248 | 24 September 1998 | SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML20239A253 | 3 September 1998 | SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl | High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
ML20238F713 | 31 August 1998 | 9,change 2 to QAP 1.0, Organization | Probabilistic Risk Assessment |
HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | 31 July 1998 | Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures | 30 July 1998 | Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures | Post Accident Monitoring |
ML20236W344 | 30 July 1998 | Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 | Incorporated by reference |
ML20236V519 | 28 July 1998 | Safety Evaluation Accepting Proposed License Amend Power Uprate Review | Shutdown Margin Anticipated operational occurrence Minimum Critical Power Ratio |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
ML20236L182 | 7 July 1998 | Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) | |
HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | 30 June 1998 | Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | 31 May 1998 | Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
ML20248B865 | 15 May 1998 | Quadrennial Simulator Certification Rept | Shutdown Margin Stroke time Overtravel Fuel cladding |
HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant | |
HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 | |
ML20216B271 | 28 February 1998 | Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Abnormal operational transient Coast down Power Uprate |
HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | 28 February 1998 | Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 | 31 January 1998 | Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 | |
HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 | 31 December 1997 | Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
ML20199B056 | 31 December 1997 | Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Flow Induced Vibration |
HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 | 31 December 1997 | Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Ultimate heat sink Offsite Dose Calculation Manual Stroke time Post Accident Monitoring Temporary Modification Design basis earthquake Process Control Program Hardened vent Fire Protection Program |
HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 | 30 November 1997 | Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 | |
HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 | 31 October 1997 | Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 | |
ML20212A198 | 16 October 1997 | Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments | VT-2 |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20211H531 | 1 October 1997 | Rev 2 to Unit 1,Cycle 17 Colr | Feedwater Controller Failure |
ML20211H525 | 1 October 1997 | Rev 3 to Unit 1,Cycle 17 Colr | Feedwater Controller Failure |