Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217D30613 October 1999SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage InstallationEarthquake
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With30 September 1999Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A66413 September 1999Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With31 August 1999Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With
ML20210J9632 August 1999SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2Stroke time
ML20210J9272 August 1999SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal BindingBackfit
HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 July 1999Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20207E7633 June 1999Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 AcceptableHydrostatic
VT-2
Incorporated by reference
HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with31 May 1999Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with
ML20206G1694 May 1999SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii)
HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20207M18911 March 1999SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential WeldNondestructive Examination
Incorporated by reference
HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20206P6987 January 1999Ehnp Intake Structure Licensing ReptCoatings
Aging Management
Earthquake
HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 December 1998Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20196J4937 December 1998Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15
HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With31 October 1998Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With
ML20155B61228 October 1998Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable
HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 September 1998Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20153G24824 September 1998SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) RequestSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML20239A2533 September 1998SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 EnclHigh Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 231 August 1998Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
ML20238F71331 August 19989,change 2 to QAP 1.0, OrganizationProbabilistic Risk Assessment
HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 231 July 1998Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures30 July 1998Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised ProceduresPost Accident Monitoring
ML20236W34430 July 1998Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2Incorporated by reference
ML20236V51928 July 1998Safety Evaluation Accepting Proposed License Amend Power Uprate ReviewShutdown Margin
Anticipated operational occurrence
Minimum Critical Power Ratio
ML20236N6759 July 1998Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps
ML20236L1827 July 1998Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3)
HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 230 June 1998Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 231 May 1998Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
ML20248B86515 May 1998Quadrennial Simulator Certification ReptShutdown Margin
Stroke time
Overtravel
Fuel cladding
HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant30 April 1998Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant
HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 231 March 1998Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2
ML20216B27128 February 1998Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2Safe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Temporary Modification
Abnormal operational transient
Coast down
Power Uprate
HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 228 February 1998Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2
HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 131 January 1998Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1
HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 231 December 1997Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2
ML20199B05631 December 1997Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Flow Induced Vibration
HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 231 December 1997Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Post Accident Monitoring
Temporary Modification
Design basis earthquake
Process Control Program
Hardened vent
Fire Protection Program
HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 230 November 1997Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2
HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 231 October 1997Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2
ML20212A19816 October 1997Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of ContainmentsVT-2
ML20211M6498 October 1997Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted
ML20211H5311 October 1997Rev 2 to Unit 1,Cycle 17 ColrFeedwater Controller Failure
ML20211H5251 October 1997Rev 3 to Unit 1,Cycle 17 ColrFeedwater Controller Failure