MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
'
Lewis Suniner Southern Nuclear Veen iostkwit **
Operating Company. lac.
Hatch hojuct Su;wt 40 invomess Pa4way Post Offeeiku 1795 thrmingham. Alabama 35201 Tol 2059'M 7?/9 iex 705 9'R.0341 SOUTHERN COMPANY August 5, 1997 I""D S'"' I'"' #I#
Docket Nos. 50 321 I
50-366 IIL 5447 l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin 1. Ilatch Nuclear Plant Monthly Operatine Menorts Gentlemen:
Enclosed are the July 1997 hionthly Operating Reports for Edwin 1. llatch Nuclear Plant Unit 1, Docket No. 50 321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications requirements.
Sincerely, 61 bs+&
- 11. L. Sumner, Jr.
CLT/eb
Enclosures:
I
- 1. July hionthly Operating Report for Plant llatch Unit 1 -
- 2. July hionthly Operating Report for Plant 11atch Unit 2 Vp cc; Southern Nuclear Operatine Com;uny
~
hir. P. II. Wells, Nuclear Plant General hianager j NORhtS U. S. Nuclear Reentatory Commission. Washington D. C.
hir. N. B. Le, Project hinnager - Ilatch U. & Nuclear Reentatorv Commission. Reelon 11 hir. L. A. Reyes, Regional Administrator hir. B. L. Ilolbrook, Senior Resident inspector liatch 1a , Li'ility Data Institute. Inc.
' ' a o' n - ( hir. Fred Yost, Director - Research Services 9708130040 970731 PDR ADOCK 05000321 N '
R PDR j
1:nclosure 1 Plant llatch Unit 1 Monthly Operating Report July 1997 Table of Contents Page Narrative Report El 1 Operating Data Report El 2 Average Daily Power Level El 3 Unit Shutdowns and Power Reductions El-4
PLANT E. l. HATCH UNIT ONE DOCKET NO.: 50 321 DATE: AUGUST 1,1997 NARRATIVE REPORT COMPLETED DY: S. D. ROGERS TELEPHONE: (912) 367 7781 x2878 JULY 1 0000 Shift continued to maintain rated thermal power.
JULY 18 2200 Shift began reducing load to approximately 610 GMWe to perform a Rod Pattern Adjustment, Control Rod Scram Time Testing, and l Turbine Control Valve Testing.
JULY 19 0438 Shift began ascension to rated thermal power.
JULY 20 0555 The unit attained rated thermal power, l
JULY 31 2400 Shift continued to maintain rated thermal power.
E1 1 l .
OPERATING DATA REPORT DOCKET NO.: 50 321 DATE: AUGUST 1,1997 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367 7781 x2878 OPERATING STATUS
- 1. UNIT NAME: E.1. HATCH UNIT ONE
- 2. REPORT PERIOD: JULY 1997
- 3. LICENSED THERMAL POWER (MWt): 2558
- 4. NAMEPLATE RATING (GROSS MWe): 850
- 5. DESIGN ELECTRICAL RATING (NET MWe): 822.1 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 835
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe). 800
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. POWPR LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YEAR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 5087 189190
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 4994.1 147226.9
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 744.0 4966.6 141894.1
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHt): 1891774 12620483 322935159
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 612677 4127089 103989811
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 586701 3958916 99042326
- 19. UNIT SERVICE FACTOR: 100.0 % 97.6 % 75.0 %
- 20. UNIT AVAILABILITY FACTOR: 100.0 % 97.6 % 75 0%
- 21. UNIT CAPACITY FACTOR (USING MDC NET): 98.6 % 97.3 % 69.5%
- 22. UNIT CAPACITY FACTOR (USING DER NET): 95.9% 94.7% 67.1 %
23 UNIT FORCED OUTAGE RATE: 0.0% 0.0% 9.9%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
37 Day Refuehng Outage tentatively scheduled for October 11,1997.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP. N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E12
PLANT E, l. HATCH . UNIT ONE DOCKET NO.: 50 321 DATE: AUGUST 1,1997 AVERAGE DAILY POWER LEVEL COMPLETED BY. S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 JULY 1997 DAY Not MWe 1 704
- 2. 793
- 3. 790
- 4. 700
- 5. . 793
- 6. 794
- 7. .
795
- 8. . 794
- 9. .. 793
- 10. 703 11 . 792 12 . 794 13.. . , 797 14 . . 795
- 15. . 704
- 16. . 793
- 17. 792
- 18. . 774
- 19. . 693
- 20. 789
- 21. 789 22 . 790
- 23. . . 788
- 24. . . 791
- 25. 790
- 26. 791
- 27. 792
- 28. . 792
- 29. 791
- 30. 701 31 800 E13
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: AUGUST 1,1997 UNIT NAME: E.1. HATCH UNIT ONE COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367 7781 x2878 REPORT MONTH: JULY 1997 RM S i .E E Y T- A T LICENSEE S C *
!Y .S H EVENT TO! COMPONENT: CAUSE & CORRECTIVE
. P DURATION ~ O O REPORT ED CODE ACTION TO NO. DATE E: (HOURS) ' N ! D NUMBER .M E; _(SUBCODE) PREVENT RECURRENCE
, No significant power i .
reductions occurred this month.
i i
i i
i TYPE. REASON. METHOD EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A.EOUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3 AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
Ei-4
Enclosure 2 Plant llatch Unit 2 Monthly Operating Report July 1997 Table of Contents EARC
, Narrative Report E21 Operating Data Report E2 2 Average Daily Power Level E2 3 Unit Shutdowns and Power Reductions E2-4
t .
PLANT E. l. HATCH UNIT TWO DOCKET NO.: 50-366 DATE: AUGUST 1,1997 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS i
TELEPHONE: (912) 367 7781 x2878
_ MJLY 1 0000 Shift continued to maintain rated thermal power.
L JULY 19 2300 Shift began reducing load to approximately 635 GMWe to perform a Control Rod Sequence Exchange, Control Rod Scram Time Testing, and Turbine Control Valve Testing. An adjustment was made to the limit switch on "C" Outboard Main Steam Isolation Valve (MSIV) while at reduced load.
JULY 20 1320 Shift began further reducing load to approximately 465 GMWe to remove o l
the 6th,7th, and 8th Stage "A" Feedwater Heaters from service, The heaters were removed from service to allow replacement of the relief j
valve on the 7th Stage "A" Feedwater Heater. The relief valve lifted during -
the prior load reduction and could r.ot be reseated.
JULY 21 0924 Shift began ascension to rated thermal power.
JULY 21 1824 The unit attained rated thermal pow 3r.
JU'.Y 31 2400 Shift c.ontinued to maintain rated thermal power.
9 E21
OPERATING DATA REPORT DOCKET NO.: 50 366 DATE: AUGUST 1,1997 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367 7'81 x2878 OPERATING STATUS
' 1. UNIT NAME: E. l. HATCH - UNIT TWO
' 2. REPORT PERIOD: JULY 1997
- 3. LICENSED THERMAL POWER (MWt): 2558
- 4. NAMEPLATE RATING (GROSS MWe): 850
- 5. DESIGN ELECTRICAL RATING (NET MWe): 829.7
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 853 l 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 818
, - 8. IF CHANGES OCCUR IN CAPACITY RATINGS l (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES i 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTP,tCTION,IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATi . .
- 19. HOURS IN REPORTING PERIOD: 744.0 5087 156815
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 4210.4 123369,1
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 744.0 4143.4 119434.0
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- - 16. GROSS THERMAL ENERGY GENERATED (MWHt)
- 1870915 10380324 268607058 17, GROSS ELECTRICAL ENERGY GENERATED (MWHe): 616957 3452462 88207925
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 591290 3300453 84079615
- 99. UNIT SERVICE FACTOR: 100.0 % 81.5 % 76.2 %
- 20. UNIT AVAILABILITY FACTOR: 100.0 % 81.5 % 76.2 %
- 21. UNIT CAPACITY FACTOR (USING MCC NET): 97.2 % 79.3 % 69.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET): 95.8 % 78.2 % 68.2 %
2' JNIT FORCED OUTAGE RATE: 0.0% 1.7% -6.4%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): -N/A k
E2-2
PLANT E.1. HATCH - UNIT TWO COCKET NO.: 50 366 DATE: AUGUST 1,1997 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: ,)12) 367 7781 x2878 JULY 1997 DAY Net MWe
- 1. 809
- 2. 809
- 3. 807
- 4. 807
- 5. 810
- 6. . 813
- 7. 812
- 8. 811
- 9. 810
- 10. 809 11 809
- 12. 809
- 13. 814
- 14. 812
- 15. 811 i 16. 810
! 17. 810
- 18. 810 l
- 19. 801
- 20. 536
- 21. 646
- 22. 806
- 23. 806
- 24. 807
- 25. 807
- 26. 807
- 27. . 808
- 28. 807 29, 806
- 30. 806
- 31. 813 s
E2-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-366 DATE: AUGUST 1,1997 UNIT NAME: E. l. HATCH - UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367 7781 x2878 REPORT MONTH: JULY 1997 7 _ _ _ . ,
! lRlMl lS j ;
l E!E! !Y ; !
!T . A l T ! LICENSEE jS C i i
!Y !SiHj EVENT !TO COMPONENT .
CAUSE & CORRECTIVE lP DURATION!O jO! REPORT 'E D: CODE ACTION TO
._;NO.4.DATE }.E;_JHOURS)j N.j D [NUMBERjM E[(SUBCODE) PREVENT RECURRENCE l l ; ! !
' i
- I i ! ;
97 006 970719 , S 0.0 !Bi5l N/A lRC FUELXX ; Shift reduced load to approximately j l , ;635 GMWe to perform a Control Rod l- !RB, CRDRVE l Sequence Exchange, Control Rod j t '
!' ! , : iScram Time Testing, and Turbine :
) j HA } VALVOP ! Control Valve Testing. The limit '
i ! ! i (C) iswitch on "C" Outboard MSIV was
! !also adjusted while at reduced load.
. ! )
!;i ;CDi INSTRU !
1
} l +
(S) l I ;
i '97-007 ' 970720 j F 0.0 N/A lAl5l { HH ] VALVOP l Shift reduced load to approximately l (J) ;465 GMWe to remove the 6th,7th,
' l iand 8th Stage "A' Feedwater l l' ; Heaters from service to replace
! i
- the relief valve on the 7th Stage "A" l ! !
=!
iFeedwater Heater. The relief valve >
{ { ! l _
l lifted during the above load reduction j ;! i ! ((97-006) and could not be reseated. !
- I ! !
iThc relief valve was replaced and j }i + <
[the unit was returned to rated !
j i
! thermal power, i t L_ _ _ a L - . . _ . . - - _ __ _ . _ .
TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPlflN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED ' B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR I C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 2A HOURS.
D-REGULATORY RESTRICTION 4-CONT;NUATIONS E OPERATOR TRAINING & LICENSE 5-LOAD REDUOTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H4THER (EXPLAIN)
E2-4 s