ML20093E531
| ML20093E531 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/31/1995 |
| From: | Shannon Rogers GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20093E523 | List: |
| References | |
| NUDOCS 9510160270 | |
| Download: ML20093E531 (2) | |
Text
f l
i Revised Page El-4 for Monthly Operating Report Aunust 1995 I
(
g 1
l l
J l
I i
i-4 i
i l'
i-m,5044 l
'9510160270 951009 PDR ADOCK 05000321 R
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0:
50-366 DATE: OCTOBER 2, 1995 UNIT NAME:
E. I. HATCH - UNIT TWO COMPLETED BY:
S. B. ROGERS TELEPHONE:
(912) 367-7781 x2878 REPORT MONTH:
SEPTEMBER 1995 4
R M
S j
j E
E Y
T A
T LICENSEE SC Y
S H
EVENT T0 COMPONENT CAUSE & CORRECTIVE j
P DURATION 0
0 REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 95-004 950902 F
57.0 A
2 95-003 HF HTEXCH The unit was manually (D) scrammed due to a decreasing j
vacuum on the "A" Main Condenser as a result of "D" Waterbox becoming airbound I
after fill material in j
Cell 10 of Cooling Tower No. 5 collapsed and clogged i
the screens at the tower.
The "D" Waterbox was vented, and Cooling Tower No. S was cleaned and returned to service.
Operations personnel are being briefed on the event.95-005 950922 S
0.0 C
5 N/A RC FUELXX Shift began reducing power to shut down the unit for the 12th Refueling Outage.95-006 950923 S
191.0 C
2 N/A RC FUELXX The unit entered the 12th Refueling Outage when Shift inserted a manual scram and subsequent turbine trip.
l TYPE:
REASON:
METHOD:
EVENTS REPORTED INVOLVE A GREATER THAN 20%
1-MANUAL REDUCTION IN AVERAGE A-EQUIPMENT FAILURE (EXPLAIN) 2-MANUAL SCRAM DAILY POWER LEVEL FOR F-FORCED B-MAINTENANCE OR TEST S-SCHEDULED 1
C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
l D-REGULATORY RESTRICTION 4-CONTINUATIONS i
E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4 I
~
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-321 i
DATE:
SEPTEMBER 1 S.E.1995 R0GERS UNIT NAME:
E. I. HATCH - UNIT DNE COMPLETED BY:
TELEPHONE:
(912) 367-7781 x2878 REPORT MONTH: AUGUST 1995 1
R M
S E
E Y
T A
T LICENSEE SC Y
S H
EVENT T0 COMPONENT CAUSE & CORRECTIVE P
DURATION 0
0 REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER HE (SUBC00E)
PREVENT RECURRENCE 95-005 950814 F
0.0 A
5 N/A RC FUELXX Unit load was reduced to approximately 400 GMWe to locate a potential leaking fuel bundle utilizing Flux Tilt Testing.
1
)
i I
I TYPE:
REASON:
METHOD:
EVENTS REPORTED INVOLVE A GREATER THAN 20%
1-MANUAL REDUCTION IN AVERAGE A-EQUIPMENT FAILURE (EXPLAIN) 2-MANUAL SCRAM 4
F-FORCED B-MAINTENANCE OR TEST DAILY POWER LEVEL FOR S-SCHEDULED C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONALERROR(EXPLAIN)
H-0THER (EXPLAIN) 4 El-4 i