Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20198D230
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/30/1998
From: Beard R, Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5714, NUDOCS 9812230040
Download: ML20198D230 (7)


Text

. - . - . . - .. - - .. - .-. ~~ . . _ _

    • Lewis Sananer Southern Nuclear .

Vice President Operating Company,Inc.  ;

Hatch Project Support C Inverness Parkway Post Office Box 1295 Birmingharn. Alabarna 35201 Tel 205.992.7279 Fax 205.992.0341 l

SOUTHERN h I COMPANY December 15, 1998 Docket Nos. 50-321 50-366 HL-5714 U.S. Nuclear Regulatory Commission i ATTN: Document Control Desk l Washington, D. C. 20555 l I

Edwin 1. Hatch Nuclear Plant .

Monthly Oncratina Reports Ladies and Gentlemen:

Enclosed are the November 1998 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications 5.6.4. i Respectfully submitted, t

t%r M I&

H. L. Sumner, Jr.

IFUeb

Enclosures:

1. November Monthly Operating Report for Plant Hatch Unit i
2. November Monthly Operating Report for Plant Hatch Unit 2 cc: Southern Nuclear Ongratina Company l

Mr. P H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)

(

11. S. Nuclear Regulatory Commission. Washington D. C.

Mr. L. N. Olshan, Project Manager - Hatch U. S. Nuclear Renulatory Commission. Reaion 11 Mr. L. A. Reyes, Regional Administrator A

[ , . "~ Q Mr. J. T. Munday, Senior Resident inspector - Hatch

/

i!!ility Data Institute. Inc.

' Ms. Barbara Lewis - McGraw-Hill Companics

~

9812230040 981130 ~'

PDR ADOCK 05000321, is R PDR i

i Enclosure 1  !

l l

Plant Hatch Unit I '

Monthly Operating Report November 1998 Table of Contents Page Operating Data Report El-1 Unit Shutdowns and Power Reductions El-2

_ _ _. _. ._ . _ _ _. . _ . . _ _ _.. _.-___m . . _ . . _.

OPERATING DATA REPORT Docket No.: 50-321 Unit Name: E. l. Hatch Unit 1 Date: 12/04/98 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Operating. Status

1. Reporting Period: NOVEMBER 1998
2. Design Electrical Rating (Net MWe): 822.1
3. Maximum Dependable Capacity (Net MWe): 800 ThisMonth YeatIaDate Cumulative
4. Number of Hours Reactor Was Critical: 720.0 8,016.0 157,996.2
5. Hours Generator On Une: 720.0 8,007.8_ 152,573.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Elect-ical Energy Generated: 572,894 6,355,556 107,447,961 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES D:tJ , Tag No. Event Description No challenges this month.

( -.

i

?

E1-1 i

l i

UNIT SHUTDOWNS Docket No.: 50-321 Unit Name: y 1. Hatch Unit 1 Date: _12/04/98 Completed By: R. M. Beard

~~ ~~

Telephone: (9T2) 367-7781 x2876 Reporting Period: NOVEMBER 1998 Type j Method of F; Faced Ouration Shutting Cause/ Corrective Actions No. Date a sch.ous.o (Hours) Reason (1) Down (2) Comments No unit shutdowns this month.

(1) Reason: (2) METHOD A-Equipment Failure (Explain) 1-Manual B Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /Ucense Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

  • The strainer in the Stator Cooling Water system was replaced and the unit was returned to rated thermal power later that day.

I J

l NARRATIVE REPORT The unit operated for most of the month of November at rated thermal power, The exception being two brief 3 load reductions. One or: 11/01 for a Control Rod Sequence Exchange and the other on 11/22 to perform Control Rod Drive Scram Time Testing on two control rod drives following maintenance on the scram pilot solenoid valves for those drives.

E1-2 i

i s I e.

l

  • i l

Enclosure 2 I I

Plant Hatch Unit 2 Monthly Operating Report November 1998 '

1 Table of Contents i

Page Operating Data Report E2-1 Unit Shutdowns and Pt wc: :. eductions E2-2 l

l l

l l

l l

I l

l l

l l

l 1

I l

l l

l I

l l

~ . . _. __ _ , . . . _ _ . ._ . ._ __ _. __

. OPERATING DATA REPORT

'

  • Docket No.: 50-366 i Unit Name: ~n. l. Hatch Unit 2 Date: _12/04/98 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Operating. Status
1. Reporting Period:

_N_OVEMBER 1998

2. Design Electrical Rating (Net MWe): 859
3. Maximum Dependable Capacity (Net MWe): T55 ThisMonth YeatIn.Date Cumulative
4. Number of Hours Reactor Was Critical: 559.7 6,55T. 3 133,402.9
5. Hours Generator On Line:

5041 6,503.2_ 129,355.0

6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated: 372,015 5,165,609 91,978,355 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Date Tag No. Event Description No challenges this month.

E2-1

l._

l, UNIT SHUTDOWNS l

, , Docket No.: 50-366 Unit Name: E. l. Hatch Unit 2 Date: 12/04/98 Completed By: R. M. Beard ,

Telephone: (912) 367-7781 x2878

{

l l R: porting Period: NOVEMBER 1998 I Type Method of c: rm.a Duration Shutting Cause/ Corrective Actions No. Date a: sen.u.a (Hours) Reason (1) Down (2) Cornments l

98-001 981024 S 214.6 C 4 Activities associated with the 14th Refueling Outage continued.98-002 981110 S 1.4 B 4 The Main Generator was removed from the grkt for Turbine Overspeed Trip Testing.

(1) Reason: (2) METilOD  ;

A-Equipment Failure (Explain) 1-Manual i B-Maintenance or Test 2-Mar.ual Trip / Scram C-Refueling 3-Automatic Trip / Scram l

D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

NARRATIVE REPORT Activities associated with the 14th Refueling OutQe continued into the month of November. The outage was extended past the scheduled end date due to the retthing of the Moisture Separator Reheaters. The outage ended when the operating shift placed the r enerator on line on 11/10/98 and began accension to 2686 CMWth.

Short delays were experierced during the p ower ascension process to address interface problems between the Process Computer and the Transversing incore Probes, reps the oil filter transfer valve for the "B" Reactor

Feed Pump Turbine, and repair a steam le ak from a drain line associated with the 2nd Stage of the "D" Moisture SIparator Reheater. Shift began Extended Power Uprate Testing (2763 CMWth licensed) on 11/16 with 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> h
Id periods at various power levels before reaching 2686 CMWth on 11/20. The unit experienced a brief load reduction during unit performance testing due to increasing temperatures in the Circulating Water System later on 11/20. While at reduced load the shift performed a rod pattern adjustment and ramped back to 2686 CMWth.

[- The unit was taken to 2708 CMWth on 11/23 as Extended Power Uprate Testing continued and returned to 2686 CMWth on 11/24. A load reduction was initiated on 11/28 to set the high speed stops on the Reactor R: circulation System and another load reduction to 2558 CMWth was initiated on 11/30 to remove the "C" Cooling

Tower from service and remove collapsed fill traterial from the cold water basins.

E2-2