Enclosure 3 Revised Page El-4 for Monthly Operating Report - Unit 1 April 1996 9606190181 960612

  • PDR ADOCK 05000321 R PDU

l 2 .-

9 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: S0-321 DATE: MAY 3 1996 UNIT NAME: E. I. HATCH

  • UNIT ONE COMPLETED BY! S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: APRIL 1996 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 96-003 960323 S 702.7 C 4 N/A RC FUELXX Activities associated with the 16th Refueling Outage continued.96-004 960430 F 16.3 F 4 96-008 HB PIPEXX During st>ctu , the unit (A) experienced h draulic fluid leaks on a Ma n Turbine
Control Valve and Turbine Stop Valve. Measures taken to isolate the leaks i

- resulted in a partial loss of hydraulic fluid flow to the Main Turbine Bypass

! Valves, causing the valves to close. An automatic reactor scram occurred on high reactor pressure.

The fluid leaks were repaired, and the hydraulic  !

' system was restored to normal configuration. Shift resumed startup activities.

I TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED A-EQUIPMENT B-MAINTENANCE OR TEST FAILURE (EXPLAIN) 2-MANUAL DAILYSCRAM POWER LEVEL FOR

, C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN)