Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2
ML20111B013
Person / Time
Site: Hatch  
Issue date: 03/31/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20111A997 List:
References
NUDOCS 9605140134
Download: ML20111B013 (2)


Text

f 9

i Revised Page E2-4 j

for l

Plant Hatch Unit 2 J

i Monthly Operating Report i

l March 1996 l

l l

\\

l l

l l

i l

l l

I i

l l

l l

1 l

i

\\

l i

I i

9605140134 960510 PDR ADOCK 05000321 l

R PDR

!!I 5164

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-366 DATE: APRIL 3, 1996 UNIT NAME:

E. I. HATCH - UNIT TWO COMPLETED BY:

S. B. ROGERS TELEPHONE:

(912) 367-7781 x2878 REPORT MONTH: MARCH 1996 R

M S

l E

E Y

l T

A T

LICENSEE SC Y

S H

EVENT T0 COMPGNENT CAUSE & CORRECTIVE P

DURATION 0

0 REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBC00E)

PREVENT RECURRENCE 96-003 960312 S

82.7 A

2 N/A CC VALVEX The unit was manually (X) scrammed to replace Main i

(B)

Steam Line SRVs "D" and "H".

Main Steam Line SRVs "D" and "H" were replaced and the unit was returned, to rated thermal power.

l l

l TYPE:

REASON:

METHOD:

EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 1 E2-4 l

,