SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal BindingML20210J927 |
Person / Time |
---|
Site: |
Hatch ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
08/02/1999 |
---|
From: |
NRC (Affiliation Not Assigned) |
---|
To: |
|
---|
Shared Package |
---|
ML20210J907 |
List: |
---|
References |
---|
GL-95-07, NUDOCS 9908050144 |
Download: ML20210J927 (4) |
|
Similar Documents at Hatch |
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20216J8971997-09-12012 September 1997 SER Related to General Electric Nuclear Measurement Analysis & Control Power Range Neutron Monitoring Sys Upgrade Southern Nuclear Operating Co,Units 1 & 2 ML20216E9671997-09-0505 September 1997 Safety Evaluation Accepting ,As Suppl by 970902 Request for Relief to Request RR-V-11 Re IST & S/Rv ML20210S9141997-09-0303 September 1997 Safety Evaluation Accepting Licensee Request for one-time Relief from GL 88-01 for Insp of Category E Welds at Plant, Unit 1 & 2 ML20217N9381997-08-21021 August 1997 SE Re New & Revised Relief Requests Submitted by 970130,0307 & 25 Ltrs in Relation to Third 10-yr Pump & Valve IST Program ML20217N9811997-08-21021 August 1997 Safety Evaluation for Third 10-year Pump & Valve Inservice Testing Program,Southern Nuclear Operating Co,Inc,Hatch, Units 1 & 2 ML20148U6141997-07-0707 July 1997 Safety Evaluation Accepting Licensee Proposal for Third 10-yr Interval for Pump & Valve Inservice Testing Program ML20141A1981997-06-17017 June 1997 Safety Evaluation Accepting Licensee Design Criteria for Sizing ECCS Suction Strainers ML20141A1431997-06-16016 June 1997 Safety Evaluation Accepting Third 10-yr Inservice Insp Program Plan & Associated Requests for Relief.Relief Not Required for RR-08 ML20137N1811997-04-0404 April 1997 Safety Evaluation Supporting Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively ML20134P3661997-02-21021 February 1997 SER Accepting Test & Technical Evaluations Performed for Reactor Vessel Shell Welds,Per 10CFR50.55a(g)(6)(ii)(A)(5) ML20138J5211997-02-0505 February 1997 Safety Evaluation Accepting Temporary Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Valve ML20134B3301997-01-28028 January 1997 SE Accepting Revised QA Program for Plant ML20129F8211996-10-24024 October 1996 Safety Evaluation Accepting Licensee Actions IAW Current Industry Practice & BWRVIP Guidelines for Reinspection of BWR Core Shrouds ML20059E6961993-10-21021 October 1993 Safety Evaluation Supporting Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively ML20128C1931992-11-20020 November 1992 Safety Evaluation Accepting Licensee Response to Suppl 1 to GL 87-02 ML20127L4511992-11-18018 November 1992 Safety Evaluation Accepting Justification to Cancel Commitment on Seven Human Engineering Discrepancies ML20248F9791989-09-20020 September 1989 Safety Evaluation Accepting Okonite Taped Cable Splice as Electrical Connection to Replace Terminal Blocks in Selected Low Voltage Transmitter Measuring Loops ML20247H7261989-03-16016 March 1989 Safety Evaluation Re Use of Radioiodine Protection Factor for Sorbent Canisters ML20207M0431988-10-13013 October 1988 Safety Evaluation Denying Util 880711 Request for Relief from Hydrostatic Test Requirements of Section XI of ASME Code for Class 2 Portion of Main Steam Lines Between Outboard MSIVs & Turbine Stop Valves ML20153F9941988-05-0202 May 1988 Safety Evaluation Supporting Amend 153 to License DPR-57 ML20238A6801987-09-0404 September 1987 Safety Evaluation Re Insps & Repairs of Igscc.Plant Can Be Safely Operated for Another 18-month Fuel Cycle in Present Configuration ML20236F9831987-07-29029 July 1987 Safety Evaluation Supporting Util 831107,840229 & 860821 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1 & 3.2.2 ML20235X5271987-07-20020 July 1987 SER Supporting Util Response to Generic Ltr 83-28,Item 2.1, (Part 2) Re Vendor Interface Programs (Reactor Trip Sys Components) ML20235P8421987-07-14014 July 1987 Safety Evaluation Re Acceptance of Offsite Dose Calculation Manual as Updated & Corrected Through 861231 ML20215M3941987-06-22022 June 1987 Safety Evaluation Re Request for Relief from Inservice Insp Requirements ML20236F6151987-04-0101 April 1987 Safety Evaluation Re Analytical Method Used by Licensee to Evaluate Critical Stresses Re Mark I Containment Program Vacuum Breakers Adequate.Max Stress in Breakers Less than 30% of Code Allowable.Existing Design Structually Adequate ML20207U1441987-03-19019 March 1987 Undated Safety Evaluation Re Plant.Section 9, Radwaste Sys, of FSAR Also Encl ML20210S2731986-09-29029 September 1986 Safety Evaluation Re Inservice Insp Program & Requests for Relief ML20211F0241986-06-12012 June 1986 Safety Evaluation Supporting Util Listed Responses to Generic Ltr 83-28,Item 2.1 (Part 1) Re Identification & Classification of Reactor Trip Sys Components ML20211B3201986-05-30030 May 1986 SER Accepting Licensee 831107 & 840219 Responses to Generic Ltr 83-28, Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements ML20205M9461986-04-24024 April 1986 Safety Evaluation Supporting Plant Operation in Present Configuration for 18-month Fuel Cycle.Plans for Insp &/Or Mod of Svc Sensitive Austenitic Stainless Steel Piping Sys Requested 3 Months Before Start of Next Refueling Outage ML20151Y4631986-01-29029 January 1986 Safety Evaluation Supporting Amend 122 to License DPR-57 ML20137M5311986-01-21021 January 1986 SER Supporting 850718 & 1127 Requests for Reconsideration of Relief from Requirements of Section XI of ASME Code Re Exam of Supports on ASME Piping ML20141F1261985-12-26026 December 1985 Safety Evaluation Supporting Amends 120 & 59 to Licenses DPR-57 & NPF-5,respectively ML20136A8461985-12-23023 December 1985 Safety Evaluation Re Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1.Addl Info Requested on Items 3.1.1,3.1.2,3.2.1 & 3.2.2.Item 4.5.1 Acceptable ML20137E2191985-12-23023 December 1985 Safety Evaluation Re Util Response to Generic Ltr 83-28,Item 1.1, Post-Trip Review (Program Description & Procedure). Program & Procedures Acceptable 1999-09-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
~
Q WEQy
- o UNITED STATES f NUCLEAR REGULATORY COMMISSION
)
g E WASHING TON, D. C. 20:i55 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION LICENSEE RESPONSE TO GENERIC LETTER 95-07. " PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES" EDWIN l. HATCH. UNITS 1 AND 2 DOCKET NUMBERS 50-321 AND 50-366
1.0 INTRODUCTION
Pressure locking and thermal binding represent potential common-cause failure mechanisms that can render redundant safety systems incapable of performing their safety functions. The identification of susceptible valves and the determination of when the phenomena might occur require a thorough knowledge of components, systems, and plant operations. Pressure locking occurs in flexible-wedge and double-disk gate valves when fluid becomes pressurized inside the valve bonnet and the actuator is not capable of overcoming the additional thrust requirements resulting from the differential pressure created across both valve disks by the press 6rized fluid in the valve bonnet. Thermal binding is generally associated with a wedge gate valve that is closed while the system is hot and then is allowed to cool before an attempt is made to open the valve.
Pressure locking or thermal binding occurs as a result of the valve design characteristics (wedge and valve body configuration, flexibility, and material thermal coefficients) when the valve is subjected to specific pressures and temperatures during various modes of plant operation. Operating experience indicates that these situations were not always considered in many plants as part of the design basis for valves.
2.0 REGULATORY REQUIREMENTS Title 10 of the Code of Federal Reaulations (10 CFR) Part 50 (Appendix A, General Design Criteria 1 and 4) and plant licensing safety analyses require or commit (or both) that licensees design and test safety-related coinponents and systems to provide adequate assurance that those systems can perform their safety functions. Other individual criteria in Appendix A to 10 CFR Part 50 apply to specific systems, in accordance with those regulations and licensing commitments, and under the additional provisions of 10 CFR Part 50 (Appendix B, Criterion XVI), licensees are expected to act to ensure that safety-related power-operated gate valves susceptible to pressure locking or thermal binding are capable of performing their required safety functions.
On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and
. Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees Enclosure 9908050144 490802 PDR ADOCK 05000321 P PDR
i take certain actions to ensure that safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions within the current licensing bases of the facility. GL 95-07 requested that each licensee, within 180 days of the date of issuance of the generic letter (1) evaluate the operational configurations of safety-related power-operated gate valves in its plant to identify valves that are susceptible to pressure locking or thermal binding, and (2) perform further analyses and take needed corrective actions (or justify longer schedules) to ensure that the susceptible valves, identified in (1) above, are capable of performing their intended safety functions under all modes of plant operation, including test configuration. In addition, GL 95-07 requested that licensees, within 180 days of the date of issuance of the generic letter, provide to the NRC a summary description of (1) the susceptibility evaluation used to determine that valves are or are not susceptible to pressure locking of thermal binding, (2) the results of the cusceptibility evaluation, including a listing of the susceptible valves identified, and (3) the corrective actions, or other disoositioning, for the valves identified as susceptible to pressure locking or thermal binding. T 2 NRC issued GL 95-07 as a " compliance backfit" pursuant to 10 CFR 50.109(a)(4)(i) becs e modification may be necessary to bring facilities into compliance with the rules of me Commission referenced above.
In a letter of February 12,1996, Southern Nuclear Operating Company, Inc., submitted its 180-day response to GL 95-07 for Edwin I. Hatch Nuclear Plant, Units 1 and 2. The NRC staff reviewed the licensee's submittal and requested additional information in a letter dated May 23,1996. In a letter dated June 21,1996, the licensee provided the additional information.
In letters dated July 6,1998, and July 9,1999, the licensee supplemented its 180-day response to GL 95-07.
3.0 STAFF EVALUATION 3.1 Scope of Licensee's Review GL 95-07 requested that licensees evaluate the operational configurations of safety-related power-operated gate valves in their plants to identify valves that are susceptible to pressure locking or thermal binding. The Southern Nuclear Operating Company, Inc., letters dated February 12, and June 21,1996, July 6,1998, and July 9,1999, described the scope of valves evaluated in response to GL 95-07. The NRC staff has reviewed the scope of the licensee's susceptibility evaluation performed in response to GL 95-07 and found it complete and acceptable.
I Normally open, safety-related power-operated gate valves which are closed for test or surveillance but must return to the open position were evaluated within the scope of GL 95-07.
The staff finds the criteria for determining the scope of power-operated vat es for GL 95-07 are consistent with the staff's acceptance of the scope of motor-operated valves associated with GL 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance?
3.2 Corrective Actions GL 95-07 requested that licensees, within 180 days, perform further analyses as appropriate, and take appropriate corrective actions (or justify longer schedules), to ensure that the susceptible valves identified are capable of performing their intended safety function under all modes of plant operation, including test configuration. The licensee's submittals discussed L
c 1
J proposed corrective actions to address potential pressure-locking and thermal-binding problems. The staff's evaluation of the licensee's actions is discussed in the following !
paragraphs:
- a. The licensee stated that the following valves were modified to eliminate the potential for pressure locking:
l' 1/2E11-F015A/B Lcw Pressure Coolant Injection (LPCI) 1/2E21-F005A/B Core Spray injection j 1/2E41 F006 High Pressure Coolant Injection (HPCI) l 1/2E51-F013 Reactor Coie Isolation Cooling injection 2P41-F115A/B Essential LPCI Inverter Room Cooler inlet The staff finds that physical modification to valves susceptible to pressure locking is an appropriato corrective action to ensure operability of the valves and is thus acceptable.
- b. The licensee stated that it used a pressure locking thrust prediction methodology developed by Commonwealth Edison Company (Comed) to demonstrate that the residual heat removal torus spray outboard isolation valves, 1/2E11-F028A/B, could open under pressure-locking conditions.
On April 9,1997, the staff held a public meeting to discuss the technical adequacy of the Comed pressure locking thrust prediction methodology and its generic use by licensees in their submittals responding to GL 95-07. The i minutes of the public meeting were issued on April 25,1997. At the public l meeting, Comed recommended that, when using its methodology, minimum ;
margins should be apphed between calculated pressure-locking thrus'. and i actuator capability. These margins along with diagnostic equipment accuracy and methodology limitations sie defined in a letter from Comed to the NRC dated May 29,1998 (Accession Number 9806040184). NRC considers the use of the Comed pressure locking thrust prediction methodology to be acceptable as a long-term corrective action provided these margins, diagnostic equipmen' l accuracy requirements and methodology limitations are incorporated into the l pressure-locking calculations. Comed indicated that its methodology may be revised. The staff considers that calculations that are used to demonstrate that valves can overcome pressure locking are required to meet the requirements of 10 CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants, and therefore, controls are required to be in place to ensure that any icdustry pressure locking thrust prediction methodology requirements and revisions are properly implemented. Under this condition, the staff finds that the Comed methodology provides a technically sound basis for assuring that valves susceptible to pressure lockir,g are capable of performing their intended safety-related function and that the licensee's action to address pressure locking of these flexible wedge gate valves is acceptable.
- c. The licensee stated that all flexible and solid wedge gate valves in the scope of GL 95-07 were evaluated for thermal binding. When evaluating whether valves were susceptible to thermal binding. the licensee assumed that thermal binding L
m 4
l
! would not occur below specific temperature thresholds. The HPCI turbine steam
( admission valves,1/2E41-F001, exceeded these temperature limitations;
! however, operational history demonstrated that the valves are not susceptible to thermal binding. The screening criteria used by the licensee appear to provide a '
reasonable approach to identify those valves that might be susceptible to thermal binding. Until more definitive industry criteria are developed, the staff concludes that the licensee's actions to address thermal binding of gate valves are acceptable.
4.0 CONCLUSION
On the basis of this evaluation, the NRC staff finds that the licensee has performed appropriate
- evaluations of the operational configurations of safety-related power-operated gate valves to l
identify valves at the Edwin I. Hatch Nuclear Plant, Units 1 and 2. that are susceptible to pressure locking or thermal binding. In addition, the NRC staff finds that the licensee has taken l appropriate corrective actions to ensure that these valves are capable of performing their intended safety functions. Therefore, the staff concludes that the licensee has adequately j addressed the reque .ed actions discussed in GL 95-07.
< Principal Contributor: S. Tingen Date: August 2,1999 l