MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
- _ _ _ __ _
Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report February 1996 Table of Contents P_ age Narrative Report El-1 Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4 l
9603140107 960308 PDR ADOCK 05000321 R PDR 111,5124
1 l PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: MARCH 5, 1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS
! TE8.EPHONE: (912) 367-7781 x2878
- FEBRUARY 1 0000 Shift continued to maintain maximum achievable thermal power. ,
3 i
- FEBRUARY 2 2237 Shift began reducing load to approximately 620 GMWe to perform Control Rod Drive Exercises on selected control rod drives.
FEBRUARY 3 0045 Shift began ascension to maximum achievable thermal power. Fuel i preconditioning measures were implemented to prevent fuel
- degradation during ascension.
1 FEBRUARY 3 0358 The unit attained maximum achievable thermal power. i
! FEBRUARY 10 0805 Shift be an reducing load to a) proximately 500 GMWe to re air asteam$eakonthe5thStage:eedwaterHeaters' Extracti!nSteam Drain line ide air in-leakage,ntifyandsources performofControl liguid radwaste Rod Drive and Main Condenser Exercises on selected control rod drives. The servo strainers on all four Main j TCVs), Main Turbine Stop Valve Turbine and ControlCombine Main Turbine Valves (d Intermediate Valves (CIVs) . INo(TSV) and 2 No. 2, were replaced to inspect for clogging.
i FEBRUARY 10 1505 Shift began ascension to maximum achievable thermal power.
FEBRUARY 11 0413 The unit attained maximum achievable thermal power. 1
! FEBRUARY 16 2246 Shift began reducing load to approximately 585 GMWe to perform j Control Rod Drive Exercises on selected control rod drives.
! FEBRUARY 17 0046 Shift be i precondikan ascension ioning measuresto were maximum achievable implemented thermal to prevent power. Fuel fuel j degradation during ascension.
) FEBRUARY 17 1235 The unit attained maximum achievable thermal power.
! FEBRUARY 23 2137 Shift began reducing load to approximately 580 GMWe to perform j Control Rod Drive Exercises on selected control rod drives.
! FEBRUARY 23 2326 Shift began ascension to maximum achievable thermal power. Fuel
! preconditioning measures were implemented to prevent fuel l degradation during ascension.
! FEBRUARY 24 0800 The unit attained maximum achievable therma's power. ,
i !
{ FEBRUARY 29 2400 Shift continued to maintain maximum achir,vable thermal power.
l I
i i
- El-1 j .
l l .
1
- I I OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: MARCH 5, 1995 t
COMPLETED BY: S. B. ROGERS t OPERATING STATUS 1
- 1. UNIT NAME: E. I. HATCH - UNIT ONE
- 2. REPORT PERIOD: FEBRUARY 1996
! 3. LICENSED THERMAL POWER MWt : 2436
' 4. NAMEPLATE RATING (GROSS (MWe : 850
- 5. DESIGN ELECTRICAL RATING N T MWe : 776.3
- 6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe 789
- 7. MAXIMUM DEPENDABLE CAPACITY NET MWe):): 756 ,
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS i
- (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES '
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS j 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 696.0 1440 176759 4 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 696.0 1393.8 135795.4
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 696.0 1352.7 130612.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 3
- 1475597 2958808 294767575
- 16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 469169 941452 94813784
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 444766 893096 90256636
- 19. UNIT SERVICE FACTOR: 100.0% 93.9% 73.9%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 93.9% 73.9%
- 21. UNIT CAPACITY FACTOR USING MDC NET : 84.5% 82.0% 68.2%
- 22. UNIT CAPACITY FACTOR USING DER NET : 82.3% 79.9% 65.5%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 6.1% 10.6%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):
42 Day Refueling Outage tentatively scheduled for March 23, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A El-2
. 4 i
b PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: 1996 AVERAGE DAILY POWER LEVEL MARCH COMPLETED BY: 5,S. B. ROGERS TELEPHONE: (012) 367-7781 x2878 i
DAY Net MWe 1 .............. 681 2 .............. 667 3 .............. 678 4 .............. 674 5 .............. 672 6 .............. 671 7 .. . ......... 668 1 8 .. ......... 661 9 .............. 656 10 .............. 588 j 654 11 ..............
12 .............. 655 13 .............. 652 14 .............. 646 15 .............. 640 16 .............. 636 17 .............. 624 18 .............. 635 19 .............. 632
, 20 .............. 628 21 .............. 626 2,? .............. 622 23 .............. 608 24 .............. 608 25 .............. 617 26 .............. 611 27 .............. 607 28 .............. 604 29 .............. 609 El-3
UNIT SHUTDOWNS AND POWER REDULJIONS DOCKET NO.: 50-321 DATE: 1996 UNIT NAME: E. I. HATCH - UNIT ONE MARCH COMPLETED BY: 5,S. B. R0GERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: FEBRUARY 1996 i
R H S E E Y l T A T LICENSEE SC l Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE No significant power l reductions occurred this month. !
l I
l l
TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE l S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN) 1 G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
El-4 I
l
~
Enclosure 2 Plant Hatch Unit 2 Monthly Operating Report February 1996 I
1 Table of Contents Eagg Narrative Report E2-la l I
Operating Data Report E2-2 1
Average Daily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4 i
I HI 5124 1 1
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-365 DATE: MARCH E, 1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 FEBRUARY 1 0000 Shift continued to maintain rated thermal power.
FEBRUARY 23 0928 Shift began reducing load to approximately 485 GMWe to perform a Control Rod Sequence Exchange and repair a seal on Reactor feedwater Pump (RFP) "A". The servo strainers en Main Turbine CIVs No. I and 2 were replaced to inspect for clogging.
FEBRUARY 25 0255 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUtRY 25 1431 The unit attained rated thermal power.
FEBRUARY 25 2301 Shift began reducing load to approximately 720 GMWe to perform a Rod Pattern Adjustment.
FEBRUARY 26 0105 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUARY 26 0500 The unit attained rated thermal power.
FEBRUARY 27 0150 Shift began
- educing load to ap roximately 685 GMWe to repair a steam leak on Steam Jet Air E ector (SJAE) "A". While placing SJAE "B" in service, a steam le k was discovered on SJAE "B".
SJAE "A" was left in service and SJAE "B" was removed from service for repair.
FEBRUARY 27 0500 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUARY 27 0848 The unit attained rated thermal power.
FEBRUARY 27 0900 Shift began reducing load to approximately 700 GMWe to perform a Rod Pattern Adjustment and place SJAE "B" in service. SJAE "A" was removed from service to' repair a steam leak.
FEBRUARY 27 1340 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUARY 27 1736 Shift began reducing load due to decreasing vacuum in the Main ;
Condenser. '
b E2-la ,
1 i
l 1
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: 1996 NARRATIVE REPORT MARCH COMPLETED BY: 5,S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 FEBRUARY 27 1820 Shift placed SJAE "A" in service and removed SJAE "B" from service due to faulty level indications in the SJAE "B" drain system.
Shift terminated load reduction at a unit load of approximately 145 GMWe when Main Condenser vacuum stabilized.
FEBRUARY 27 2222 Shift began ascension to 500 GMWe to stabilize steam plant operation.
FEBRUARY 28 0330 The unit attained 500 GMWe. Shift placed SJAE "B" in service following calibration of the level instrumentation in the drain system and removed SJAE "A" from service to repair a steam leak.
SJAE "A" was returned to service following repair, and SJAE "B" was removed from service.
FEBRUARY 28 2058 Shift beghn ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUARY 29 0508 The unit attained rated thermal power.
FEBRUARY 29 0805 Shift began inserting control rods to reduce load to approximately 795 GMWe as part of a Rod Pattern Adjustment.
FEBRUARY 29 0832 Shift began ascension to rated thermal power. Fuel preconditioning measures were implemented to prevent fuel degradation during ascension to rated thermal power.
FEBRUARY 29 1200 The unit attained rated thermal power.
FEBRUARY 29 2400 Shift centinued to maintain rated thermal power.
E2-lb l
l
OPERATING DATA REPORT DOCKET N0: 50-366 DATE: MARCH 5, 1996 COMPLETED BY: S. B. ROGERS OPERATING STATUS:
- 1. UNIT NAME: E. I, HATCH - UNIT TWO
- 2. REPORTING PERIOD: FEBNARY 1996
- 3. LICENSED THERMAL POWER (MWt : 2558
- 4. NAMEPLATE RATING (GROSS MWe : 850
- 5. DESIGN ELECTRICAL RATING (N T MWe): 784
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe 844 l 7c MAXIMUM DEPENDABLE CAPACITY 809 8.(ITEMS IF CHANGES OCCUR IN CAPACITY (NET MWe):):
RATINGS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE !
- 11. HOURS IN REPORTING PERIOD: 696.0 1440 144385
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 696.0 1440.0 111921.6
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l
- 14. HOURS GENERATOR ON LINE: 696.0 1440.0 108090.9 l
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1695014 3589654 239955455
- 16. GROSS THERMAL ENERGY GENERATED
- 17. GROSS ELFCTRICAL ENERGY GENERATED (MW 569595 (MWHt)He):
1208668 78642927
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 547060 1161590 74919051
- 19. UNIT SERVICE FACTOR: 100.0% 100.0% 74.9%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 74.9%
- 21. UNIT CAPACITY FACTOR USING MDC NET): 97.2% 99.7% 67.9%
- 22. UNIT CAPACITY FACTOR USING DER NET): 100.3% 102.9% 66.2%
- 23. UNIT FORCED CUTAGE RA E: 0.0% 0.0% 6.9%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH): NA 25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDkTEOF,STARTUP: NA
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): NA E2-2
l PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: 1996 AVERAGE LAILY POWER LEVEL MARCH COMPLETED BY: 5,S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 DAY Net NWe 1 .............. 828 2 .............. 827 3 .............. 831 ,
4 .............. 832 1 5 .............. 833 i 6 .............. 831 i 7 .............. 831 8 .............. 829 9 .............. 827 10 .............. 828 11 .............. 827 12 .............. 831 13 .............. 832 14 .............. 829 15 .............. 827 16 .............. 831 l 17 .............. 832 ,
18 .............. 831 19 .............. 829 l 20 .............. 826 21 .............. C26 J
22 .............. 826 )
23 .............. 628 24 .............. 485 25 .............. 733 26 .............. 815 27 .............. 571 28 .............. 498 29 .............. 818 E2-3 I
j: ,
)
i UNIT SHUTDOWNS AND POWER REDUCTIONS -DOCKET NO: 50-366
- DATE: 1996 i UNIT NAME: E. I. HATCH - UNIT TWO MARCH COMPLETED BY: 5,S. B. ROGERS i TELEPHONE: (912) 367-7781 x2878
! REPORT MONTH: FEBRUARY 1996 R M S i E E Y T A T LICENSEE SC
! Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE j P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE
! 0.0 96-001 960223 3 F 5 N/A RC FUELXX Shift reduced load to l B approximately 485 GMWe to
! HH PUMPXX perform a Control Rod (C) Sequence Exchange and 1
repair a seal on RFP "A".
! HB FILTERS The servo strainers on Main i Turbine CIVs No. I and 2 i were replaced to inspect ror clogging.
l 96-002 960227 F 0.0 A 5 N/A HC INSTRU Shift reduced load to approximately 145 GNWe due to decreasing vacuum in the Main Condenser.
A false high level signal in the SJAE "B" drain tank resulted in low Main Condenser vacuum. SJAE "A" was placed in service to stabilize vacuum levels.
SJAE "B" was removed from service to calibrate the drain tank level instruments.
TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GRE.aTER THAN 20%
F-FORCED 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED A-EQUIPMENT B-MAINTENANCE OR TEST FAILURE (EXPLAIN) 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
)
E2-4