HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1
ML20202D755
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/31/1998
From: Shannon Rogers, Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5571, NUDOCS 9802170165
Download: ML20202D755 (7)


Text

Lewis Sumner . Southern Nuclear Vee President Operating Company,Inc.

Hgtch Projog Suppxt 40 invorress Parkway Post Offce Box 1295

, Birmirr/mm. Alabama 3fa01 Tel2059327279 Fax 205932.0341 SOUTHERN COMPANY February 6, 1998 #""D #'* N"' #"#

Docket Nos. 50-321 50 366 11L-5571 U.S. Nr ! ar Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin 1. Ilatch Nuclear Plant Monthly Oncratine Resorts

! Gentlemen:

Enclosed are the January 1998 hionthly Operating Re ..ts for Edwin 1.1Iatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Decket No S')-366. These reports are l submitted in accordance with Technical Specifications requirements.

I

{ Sincerely, I

0+W3 LW

11. L. Sumner, Jr.

IFileb

Enclosures:

1. January hionthly Operating Repc ;r Plant 11atch Unit 1
2. January hionthly Operating Repos, or Plant Itatch Unit 2 ,

cc: Southern Nuclear Overatine Company c hir P. II. Wells, Nuclear Plant General hianager NORMS U. S. Nuclear Reeutatorv Commission. Washington D. C.

hir. L. N. Olshan, Project hianal,er - 11atch d, U. S. Nuclear Reen,'atory Commission. Region 11 hir. L. A. Reyes, Regional Administrator

.; j n , c, , hir. B. L. IIolbrook, Senior Resident Inspector - Hatch

..00u3 Utility Data Institute. Inc.

his. Barbara Lewis " hicGraw Hill Companies ll ll**clll l lllllll 9902170165 980131 PDR ADOCK 05000321 R PDR

.- Enclosure 1 Plant flatch Unit 1 Monthly Operating, Report January 1998 Table of Contents EAtt Operating Data Report El.1 Unit Shutdowns and Power Reductions El 2

_ =

4 4 4

, . OPERATING DATA REPORT Docket No.: 50-321 Unit Name: E. i. Halch Unii i " ~

~

Date:

February;4,1998 ~'~'~

Completed By: _S. B. Rogers Telephone:

(912) 367 778ilx2878 I

Operating Status l .1, Reporting Period:

]

JANUARY 1998

~ ~ ~ ~

2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):

822.1~~-

800 This Month (eatTo Date Cuniulative

4. Number of Hours Reactor Was Critical: 744.0 744.0 160,724.2
5. Hours Generator On Line: 74T0; _f.'((.1744;0 l_]14Q09.8, 8 Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated. ~~698,832' -598,832 ~iO1,6 i d,237 l

CHALLENGES TO MAIN STEAM RELIEFl SAFETY VALVE 8 Date _

- Tag No. _ ,, Event Description _, __

No challenges this month.

Ei 1

UNIT SHUTDOWNS Docket No.: 50 321

~

Unit Name: E. l.~ Hafehunit 1

. Date: Fetiri;arfl19&B Completed By: S. _B._ Rogers __ . _

Telephone: (912) 3_67 7781 x2878 l Reporting Period: JANUARY 1998__

j. Type Method of S rec e Duration Shutting Cause/ Corrective Actions

_Jfo. Date_ a saga, _(Hours) Reasor.(1)_ Down (2) . _ Comments .

{

No unit shutdowns occurred this month.

1 1

i l

(1) Reason: (2) METHOD A Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2 ManualTrip/ Scram C-Refueling 3-Automatic Trip / Scram C Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain)

F Administrative G. Operational Error (Explain)

H-Other (Explcin)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

NARRATIVE REPORT Unit 1 operated at rated thermal power for the month of January except for a minor load reduction on 1/23/98 to perform a rod pattern adjustment and exercise selected control rod drives.

E12 1

. Enclosure 2 Plant liatch Unit 2 Monthly Operating Report l ,Innuary 1998 Table of Contents Page Operating Data Report E21 Unit Shutdowns and Power Reductions E2-2

CPERATING DATA REPORT Docket No.: 50-366 _

Unit Name: E. l.~ Hatch Unit 2_

Cate: February 4,1998 Completed By: S. B. Rogers _ __ . _

Telephone: ,(912) 367 7781 x2878 Operating Status

1. Reporting Period: JANUARY 1998
2. Design Electrical Rating (Net MWe): 829.7
3. Maximum Dependable Capacity (Net MWe): _818 This Month Year _To Date Cumulative
4. Numb 3r of Hows Reactor Was Cntical: 744.0

' ~~ ~ ~'-~

744.0 "~127,588.1

5. Hours Generator On Line: 744I 744.0~ 123,595.7
6. Unit Reserve Shutdown Hours: ~-'60~ ~0.0~ ~ ~ ~ ~ " ~ 0:0~
7. Net Electrical Energy Generated: 604,276 604,276 87,417,022 CHALLENGES TO MAIN STEAM RELIEFl SAFETY VALVES Date_,_ T_ag No. Event Desenption _

No challenges this month.

)

i E21

.. . UNIT SHUTDOWNS l Docket No.: 50-366 Unit Name: E.1. Hatch Unit 2

~

Date: February 4, i998 Ccmpletec Gy: _S. B._ Rogers Telephone: (9121367-7781 x2878_

Reporting Period: JANUARY 1998 f

h Type {  :

Metnod of F Fwed Shutting Duration l Cause/ Corrective Actions No. _ _ Date a se (Hours) {Re son (1)1 Down (2) Comments No unit shutdowns occurred this month.

)  ;

i l

(1) Reasoa: (2) METHOD A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test _ ManualTrip/ Scram C Refuehng 3-Automatic Trip /Sc.an D Regulatory Res%ction 4-Continuation E-Operator Training / License Examinatic,n 5-Other (Explain)

F Administrative G Operational Error (ExrIain)

H-Other (Explain)

, CAUSE/ CORRECTIVE ACTIONICOMMENTS:

L NARRATIVFjEPORT ,

Unit 2 oped.d at rated thermal power for most of the month of annuary. Shift reduced load to approximately 620 GMWe on 1/4/98 to perform a Control Rod Sequence Exchage, Turbine Control Valve Testing, and to iamove the 2nd Stage of the Moisture Separator Reheaters (MSRs) fror.1 service to investigate a possible restriction in the low level control line for "D" MSR 2ad Stage Drair, f ank. The t#t was retumed to rated thermal power on 1/5/98 with the 2nd Stage of the iASRs out of service. Shift reduced load to approximately 790 GMWe on 1/6/98 to remove

- the "B" 4th Stage Feedwater Heater from service to facilitate repair of a check valve on the "D" MSR 2nd Stage low level control line. The unit was returned to rated thermal power un it7/98 wn5 the 2nd Stage of the MSRs and the k 'B" 4th Stage Feedwater Heater ot,t of service. The "B" 4th Stage Feedwater Heater was returned to service on Y

1/8/98. Ti.a 2nd Stage of the MSRs was returned to sen ice on 1/9/98.

l E2-2

.I