Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1
ML20101B200
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/31/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20101B180 List:
References
NUDOCS 9603140109
Download: ML20101B200 (2)


Text

.

j Enclosure 3 Revised Page El-2 for Monthly Operating Report January 1996 1

l i

l 9603140109 960308 PDR ADOCK 05000321 g PDR In 5124

OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: 1996 COMPLETED FEBRUARY BY: S. 5,B. ROGERS l

i TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS l

1. UNIT NAME: E. I. HATCH - UNIT ONE
2. REPORT PERIOD: JANUARY 1996 MWt : 2436 3.NAMEPLATE
4. LICENSED RATING THERMAL (GROSS POWER (MWe : 850 l
5. DESIGN ELECTRICAL RATING (N T MWe): 776.3
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 789
7. MgriMUM DEPENDABLE CAPACITY 756
8. IF CHANGES OCCUR INRATINGS CAPACITY (NET MWe):

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

Maximum The valuesDependable Capacities were determined for 1996Company by Southern are 789 MWe Services (Gross) fromand 1995 756operationa MWe (Net)l data.

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 744.0 176063
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 697.8 697.8 . 135099.4
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 656.7 656.7 129916.8
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1483211 1483211 293291978
17. GROSS ELECTRICAL ENERGY GENERATED (WHe): 472283 472283 94344615
18. NET ELECTRICAL ENERGY GENERATED (W He): 448330 448330 89811870
19. UNIT SERVICE FACTOR: 88.3% 88.3% 73.8%
20. UNIT AVAILABILITY FACTOR: 88.3% 88.3% 73.8%
21. UNIT CAPACITY FACTOR USING MDC NET): 79.7% 79.7% 68.1%
22. UNIT CAPACITY FACTOR USING DER NET): 77.6% 77.6% 65.4%
23. UNIT FORCED OUTAGE RA E: 11.7% 11.7% 10.6%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):

42DAYREFUELINGOUTAGETENTATIVELYSCHEDULEDF0kMARCH 23, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: NA 26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION): NA l

l i

! El-2 i

l