Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2
ML20133K441
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1996
From: Shannon Rogers, Woodard J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5296, NUDOCS 9701210226
Download: ML20133K441 (11)


Text

Georg'a Power Cornpany o' ,333 Piedmont k senue

. Attanta. Georg:a 30308

. Telephdne 404 526 3195 Maihng Address 40 Inverness Center Parkway Post OMice Box 1295 Birmingham Atabarna 35201 Te!cphone 205 BC8-5086 J. D. Woodard "* v+ ) r *! < m M c Senior Vice President l January 10, 1997 Docket Nos. 50-321 50-366 IIL-5296 I I

U. S. Nuclear Regulatory Commission 1

ATTN: Document Control Desk Washington, D. C. 20555 l

Edwin I. Hatch Nuclear Plant Monthly Operating Reports Gentlemen:

Enclosed are the December 1996 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications requirements.

Sincerely, p

MsdA,

( Voodard CLTleb

Enclosures:

1. December Monthly Operating Report for Plant Hatch Unit 1
2. December Monthly Operating Report for Plant Hatch Unit 2 cc: Georgia Power Company Mr. H. L. Sumner, Nuclear Plant General Manager NORMS U. S. Nuclear Regulatory Commission. Waslungton D. C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Reentatory Commission. Region 11 Mr. L. A. Reyes, Regional Administrator sf&SY y Mr. B. L. Holbrook, Senior Resident Inspector - Hatch Utility Data Institute. Inc.

Mr. Fred Yost, Director - Research Services Oy g ,

9701210226 961231 PDR ADOCK 05000321 R PDR

\

Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report December 1996 Table of Contents Page Narrative Report El I Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4

i

)

, i PLANT E.1. HATCH - UNIT ONE DOCKET NO.: 50-321

! DATE: JANUARY 2,1997 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 i

! DECEMBER 1 0000 Shift continued to maintain rated thermal power. l DECEMBER 31 2400 Shift continued to maintain rated thermal power.

I l

E1-1

OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: JANUARY 2,1997 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS

1. UNIT NAME: E.1. HATCH - UNIT ONE
2. REPORT PERIOD: December 1996
3. LICENSED THERMAL POWER (MWt): 2558
4. NAMEPLATE RATING (GROSS MWe): 850
5. DESIGN ELECTRICAL RATING (NE~t MWe): 822.1
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 840
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 805
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 8784 184103
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 7831.3 142232.8
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 744.0 7667.3 136927.4
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1902142 18505909 310314676
17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 626228 5990390 99862722
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 601300 5719870 95083410
19. UNIT SERVICE FACTOR: 100.0 % 87.3% 74.4 %
20. UNIT AVAILABILITY FACTOR: 100.0 % 87.3 % 74.4 %
21. UNIT CAPACITY FACTOR (USING MDC NET): 100.4 % 82.6  % 69.0%
22. UNIT CAPACITY FACTOR (USING DER NET): 98.3 % 80.7 % 66.3 %
23. UNIT FORCED OUTAGE RATE: 0.0% 2.5% 10.2%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

4 Day Maintenance Outage tentatively scheduled for May 8,1997

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E1-2 1

PLANT E. l. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: JANUARY 2,1997 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 December 1996 DAY NetMWe

1. .. 802 2.... . 810 3.... . . . . 810 4..... . .. 809 5.. . . . . . . . . 809
6. . . .. 807
7. . . . .. . 804
8. . . .. .. 810
9. ... . . . . 811
10. .. . 810 11 . .. . . . 807
12. . 805
13. . . 808
14. .. . 810
15. . .. 811
16. . .. .. 809
17. 806
18. .. . , , E10 19 .. .. .. 811
20. . . . . . . . . 811
21. . .. 812
22. . . . . . . . 810
23. . . .. .. 808
24. . . . 806
25. . . . . . . . . . . . 811
26. . . .. 809 27 . . .. . . .. 807 28.. . . . . . . . 806
29. . . 806
30. . . . 805 31 . . . 804 E1-3

UNIT SHUTDOWNC AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: JANUARY 2,1997 UNIT NAME: E.1. HATCH - UNIT ONE COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: December 1996 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE No significant power reductions occurred this month.

1 TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.

D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

E1-4

i; Enclosure 2

- Plant Hatch Unit 2 i Monthly Operating Report

! December 1996 a

4 Table of Contents e

4 Page j

Narrative Report E2-1 3

Operating Data Report E2-2 Average Daily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4 t

I

i i

  • PLANT E. l. HATCH - UNIT TWO DOCKET NO.: 50-366 DATE: JANUARY 2,1997 l NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 DECEMBER 1 0000 Shift continued to maintain rated thermal power.

DECEMBER 31 2400 Shift continued to maintain rated thermal power.

P I

l l

E2-1 l

l I

l

i OPERATING DATA REPORT DOCKET NO.: 50-366 DATE: JANUARY 2,1997 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS

1. UNIT NAME: E. l. HATCH - UNIT TWO
2. REPORT PERIOD: December 1996
3. LICENSED THEP. MAL POWER (MWt): 2558
4. NAMEPLATE RATING (GROSS MWe): 850 i
5. DESIGN ELECTRICAL RATING (NET MWe): 784
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 844
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 809
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 8784 151729
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 8677.1 119158.7
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 744.0 8639.7 115290.7 1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 I
16. GROSS THERMAL ENERGY GENERATED (MWHt): 1902209 21860933 258226734
17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 640016 7321204 84755463 i
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 614162 7021701 ' 80779162 i
19. UNIT SERVICE FACTOR: 100.0 % 98.4 % 76.0 %
20. UNIT AVAILABILITY FACTOR: 100.0% 98.4 % 76.0 %
21. UNIT CAPACITY FACTOR (USING MDC NET): 102.0% 98.8 % 69.7%
22. UNIT CAPACITY FACTOR (USING DER NET): 105.3% 102.0 % 67.9%
23. UNIT FORCED OUTAGE RATE: 0.0% 0.7% 6.5%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

30 Day Refueling Outage tentatively scheduled for March 15,1997.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E2-2

PLANT E.1. HATCH - UNIT TWO DOCKET NO.: 50-366 DATE: JANUARY 2,1997 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 December 1996 DM NetNWe

1. . . . . . . . . 820 ,
2. . . 827
3. . . . 828 4 ... . . . . . 827
5. . 826 6... . .. . . . . 825
7. . . . . . 822
8. . 827
9. . .. . .. 828 10 . . . 828 11 . . 826
12. . . .. . 823
13. .. 824
14. . 826
15. . . 827
16. . . .. .. 827
17. . 824
18. . . . . 828
19. .. 828
20. .. . . . 829 21 . . . . . 830
22. . . . . . . . 827
23. . . . . 826
24. . . .. . 824 25 .. . . . . 827 26 . . 826 27 . .. . . . . . . 825
28. . .. . 823
29. . . . 822
30. .. 822 31 . . 820 E2-3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-366 DATE: JANUARY 2,1997 UNIT NAME: E. l. HATCH - UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 ,

REPORT MONTH: December 1996  ;

R M S 1 E E Y T A T LICENSEE SC l Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE l

l No significant power reductions occurred this i month. l I

l TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%

F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS, D-REGULATORY RESTRICTION 4 CONTINUATIONS E-OPERATOR TRAINING & LICENSE S-LOAD REDUCTION F ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

E2-4

!