Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1
ML20116J397
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/31/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20116J354 List:
References
NUDOCS 9608130180
Download: ML20116J397 (2)


Text

.__

Revised Page El-2 for Plant Hatch Unit 1 Monthly Operating Report May 1996 NOTE: The attached page is being revised u a result of an error in calculation of several parameters due to the use of Central Standard Time (CST) rather than Eastern Standard Time (EST).

1 l

HL 5218 9608130180 960809 PDR ADOCK 05000321 R

PDR

l.

OPERATING DATA REPORT DOCKET NO.:

50-321 DATE: JUNE 6, 1996 COMPLETED BY:

S. B. ROGERS i

TELEPHONE:

(912) 367-7781 x2878 OPERATING STATUS l

1. UNIT NAME:

E. I. HATCH - UNIT ONE

2. REPORT PERIOD:

MAY 1996 MWt :

2558

3. LICENSED THERMAL POWER (MWe :
4. NAMEPLATE RATING (GROSS 850 5
5. DESIGN ELECTRICAL RATING (N T MWe):

776.3

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

840

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

805

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

was increased Licensed Thermal Power (Item #3)imum Dependable from 2436 to 2558 MWt, Gross Max Capacity (Item #6) was increased from 789 to 840 l

MWe, and Net Maximum Dependable Capacity (Iteu #7) was increased from 756 to 805 MWe due to Power 1

Uprate.

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

N/A THIS MONTH YEAR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744.0 3647 178966

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

715.3 2694.2 137095.8 j

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON LINE:

648.0 2530.3 131790.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 1495726 5408810 297217577

16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
17. GROSS ELECTRICAL ENERGY GENERATED (MW 477528 1713910 95586242
18. NET ELECTRICAL ENERGY GENERATED (NWHe):

454326 1617225 90980765

19. UNIT SERVICE FACTOR:

87.2%

69.4%

73.6%

20. UNIT AVAILABILITY FACTOR:

87.2%

69.4%

73.6%

21. UNIT CAPACITY FACTOR USING MDC NET):

75.9%

57.9%

67.9%

22. UNIT CAPACITY FACTOR USING DER NET):

78.7%

57.1%

65.2%

23. UNIT FORCED OUTAGE RA E:

12.6%

7.2%

10.6%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NA

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

NA 26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION):

NA El-2