ML20116J397

From kanterella
Jump to navigation Jump to search
Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1
ML20116J397
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/31/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20116J354 List:
References
NUDOCS 9608130180
Download: ML20116J397 (2)


Text

.__ __

Enclosure 4 Revised Page El-2 for Plant Hatch Unit 1 Monthly Operating Report May 1996 NOTE: The attached page is being revised u a result of an error in calculation of several parameters due to the use of Central Standard Time (CST) rather than Eastern Standard Time (EST).

1 l

HL 5218 9608130180 960809 PDR ADOCK 05000321 R PDR

l. .

OPERATING DATA REPORT DOCKET NO.: 50-321

DATE: JUNE 6, 1996 COMPLETED BY: S. B. ROGERS i

TELEPHONE: (912) 367-7781 x2878  !

OPERATING STATUS l

1. UNIT NAME
E. I. HATCH - UNIT ONE '

! 2. REPORT PERIOD: MAY 1996 MWt : 2558

3. LICENSED
4. NAMEPLATE THERMAL RATING (GROSS POWER (MWe : 850 5
5. DESIGN ELECTRICAL RATING (N T MWe): 776.3
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 840
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 805
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

was increased Licensed from 2436 Thermal Power to 2558 MWt, Gross (Item Max#3)imum Dependable Capacity (Item #6) was increased from 789 to 840 l MWe, and Net Maximum Dependable Capacity (Iteu #7) l was increased from 756 to 805 MWe due to Power 1 Uprate.  !

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 3647 178966 i
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 715.3 2694.2 137095.8 j 0.0 0.0 0.0
13. REACTOR RESERVE SHUTDOWN HOURS:
14. HOURS GENERATOR ON LINE: 648.0 2530.3 131790.4 l
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 1
1495726 5408810 297217577
16. GROSS
17. GROSS THERMAL ELECTRICAL ENERGY ENERGY GENERATED (MW GENERATED 477528 (MWHt)He):

1713910 95586242 90980765

18. NET ELECTRICAL ENERGY GENERATED (NWHe): 454326 1617225
19. UNIT SERVICE FACTOR: 87.2% 69.4% 73.6% ,
20. UNIT AVAILABILITY FACTOR: 87.2% 69.4% 73.6%
21. UNIT CAPACITY FACTOR USING MDC NET): 75.9% 57.9% 67.9%
22. UNIT CAPACITY FACTOR USING DER NET): 78.7% 57.1% 65.2%
23. UNIT FORCED OUTAGE RA E: 12.6% 7.2% 10.6% ,
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): NA '
25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: NA 26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION): NA El-2