Similar Documents at Hatch |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20212G3101999-09-24024 September 1999 Safety Evaluation Supporting Amends 217 & 158 to Licenses DPR-57 & NPF-5,respectively ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With 05000366/LER-1999-006, :on 990615,loss of Condenser Vacuum Leads to Manual Reactor Scram & ESF Actuation.Caused by Loss of Vacuum in Main Condenser.Operating Order Issued.With1999-07-14014 July 1999
- on 990615,loss of Condenser Vacuum Leads to Manual Reactor Scram & ESF Actuation.Caused by Loss of Vacuum in Main Condenser.Operating Order Issued.With
HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207G5591999-06-0909 June 1999 Safety Evaluation Supporting Amends 215 & 157 to Licenses DPR-57 & NPF-5,respectively ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable 05000321/LER-1999-003-01, :on 990507,incorrect Performance of Equipment Clearance Led to Scram on High Reactor Pressure.Caused by Personnel Error.Personnel Disciplined & Improved Procedure.With1999-06-0101 June 1999
- on 990507,incorrect Performance of Equipment Clearance Led to Scram on High Reactor Pressure.Caused by Personnel Error.Personnel Disciplined & Improved Procedure.With
HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with 05000366/LER-1999-005, :on 990505,generator Ground Fault Caused Turbine Trip & Reactor Scram.Caused by Turning Vanes Which Broke Loose.Pieces of Broken Vanes & Rails Were Retrieved from Isophase Bus Duct.With1999-05-27027 May 1999
- on 990505,generator Ground Fault Caused Turbine Trip & Reactor Scram.Caused by Turning Vanes Which Broke Loose.Pieces of Broken Vanes & Rails Were Retrieved from Isophase Bus Duct.With
05000321/LER-1999-002-01, :on 990429,HPCI Sys Inoperability Occurred. Caused by Vacuum in HPCI Sys Vacuum Tank.Personnel Lowered Tank Vacuum & Successfully Completed HPCI Sys Testing.With1999-05-24024 May 1999
- on 990429,HPCI Sys Inoperability Occurred. Caused by Vacuum in HPCI Sys Vacuum Tank.Personnel Lowered Tank Vacuum & Successfully Completed HPCI Sys Testing.With
05000321/LER-1999-001-04, :on 990412,loss of Scram Valve Air Header Air Pressure & RPS Actuation Were Noted.Caused by Drawing Error. Revised Drawings to Show That Valve 1P52-F501 Provides Air to Scram Valve Air Header.With1999-05-10010 May 1999
- on 990412,loss of Scram Valve Air Header Air Pressure & RPS Actuation Were Noted.Caused by Drawing Error. Revised Drawings to Show That Valve 1P52-F501 Provides Air to Scram Valve Air Header.With
ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20205H1881999-04-0606 April 1999 Non-proprietary, Ei Hatch Nuclear Plant,Units 1 & 2 for SFP Storage Expansion ML20205G5041999-04-0101 April 1999 Safety Evaluation Supporting Amends 215 & 156 to Licenses DPR-57 & NPF-5,respectively HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept 05000366/LER-1998-004-01, :on 981005,noted That full-in Position Indicating Light Did Not Extinguish as Expected When CR 38-15 Was Withdrawn.Caused by Personnel Error.Jumper Was Removed from RPIS Circuit Card for Rod 38-151999-01-0404 January 1999
- on 981005,noted That full-in Position Indicating Light Did Not Extinguish as Expected When CR 38-15 Was Withdrawn.Caused by Personnel Error.Jumper Was Removed from RPIS Circuit Card for Rod 38-15
HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With 05000366/LER-1998-005-04, :on 981117,missed TS Surveillance Was Noted. Caused by Administrative Error.Changed Manner in Which Surveillance Database Updates Are Initiated,Tracked & Implemented.With1998-12-15015 December 1998
- on 981117,missed TS Surveillance Was Noted. Caused by Administrative Error.Changed Manner in Which Surveillance Database Updates Are Initiated,Tracked & Implemented.With
ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With 05000366/LER-1998-004-04, :on 981005,condition Prohibited by TS Was Noted.Caused by Personnel Error.Coached Involved Personnel & Briefed Other Technicians on Event.With1998-10-29029 October 1998
- on 981005,condition Prohibited by TS Was Noted.Caused by Personnel Error.Coached Involved Personnel & Briefed Other Technicians on Event.With
ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable ML20155C6601998-10-22022 October 1998 Safety Evaluation Supporting Amends 214 & 155 to Licenses DPR-57 & NPF-5,respectively 05000366/LER-1998-003-05, :on 980923,RPS Actuation Occurred Due to Valve Position Error.Cause indeterminate.Re-pressurized Scram Air Header & Checked Valves in Pneumatic Lineup1998-10-14014 October 1998
- on 980923,RPS Actuation Occurred Due to Valve Position Error.Cause indeterminate.Re-pressurized Scram Air Header & Checked Valves in Pneumatic Lineup
HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization ML20237D6371998-08-20020 August 1998 Safety Evaluation Supporting Amends 213 & 154 to Licenses DPR-57 & NPF-5,respectively ML20237C4531998-08-18018 August 1998 Safety Evaluation Supporting Amends 212 & 153 to Licenses DPR-57 & NPF-5,respectively HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
._
Plant Hatch Unit 1 Monthly Operating Report July 1996 Table of Contents EASC Narrative Report El-1 Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4 9608130173 960809 i
PDR ADOCK 05000321 R
PDR HL-5218
PLANT E. l. HATCH - UNIT ONE DOCKETNO.: 50-321 DATE: AUGUST 2,1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 JULY 1 0000 Shift contmuod to maintain rated thermal power.
JULY 13 0104 Shift began reducing load to approximately 760 GMWe to perform Turbine Stop Valve and Bypass Valve Testing, a Rod Pattom Adjustment, and Control Rod Drive Exercises on selected control rod drives.
JULY 13 0306 Shift began ascension to rated thermal power.
JULY 13 0420 The unit attained rated thermal power.
JULY 25 1521 Shift began reducmg load to approximately 730 GMWe when an electrical ground was received on the "B" 600v bus, resultog in a trip of Feedwater Heater Drain Pump "B".
JULY 25 1723 Shift began ascension to rated thermal power.
JULY 25 2027 The unit attained rated thermal power.
JULY 31 2400 Shift continued to mantain rated thermal power.
1 I
)
E1-1
1 e
OPERATING DATA REPORT DOCKET NO.: 50-321 i
DATE: AUGUST 2,1996 COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367 7781 x2878 OPERATING STATUS 1
i
- 1. UNIT NAME:
E.1. HATCH - UNIT ONE
- 2. REPORT PERIOD JULY 1996 l
- 3. UCENSED THERMAL POWER (MWt):
2558 1
- 4. NAMEPLATE RATING (GROSS MWe):
850 l
- 5. DESIGN ELECTRICAL RATING (NET MWe):
822.1
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
840 j
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
805
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS j
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS.
NO CHANGES J
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
N/A l
l THIS MONTH YEAR-TO-DATE CUMULATIVE i
1
- 11. HOURS IN REPORTING PERIOD.
744.0 5111 180430
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 4158.3 138559.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE:
744.0 3904.3 133254.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWHI).
1900951 9149425 300958192 1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe):
616547 2929058 96801390
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe):
591189 2782469 92146000 1
- 19. UNIT SERVICE FACTOR:
100.0%
78.2%
73.9%
i
- 20. UNIT AVAILABluTY FACTOR:
100.0 %
78.2 %
73.9%
l
- 21. UNIT CAPACITY FACTOR (USING MDC NET):
98.7%
70.1 %
68.2%
l
- 22. UNIT CAPACITY FACTOR (USING DER NET):
96.7%
68.4%
65.5%
l
- 23. UNIT FORCED OUTAGE RATE:
0.0%
4.7%
10.5%
i
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A j
- 26. UNITS IN TEST STATUS (PRIOR TO COhWERCIAL OPERATION):
N/A i
i i
i d
1 4
i 1
E1-2 1
)
~
PLANT E. L HATCH-UNIT ONE DOCKETNO.: 50-321 DATE: AUGUST 2,1996 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 JULY 1996 DAY Not MWe 1...............................
7M 2........................
795 3..............................
7M 4..............................
797 5................................
7M 6.........................
7M 7................................
795 8...............................
795 9.........
7M 10..........................
796 11.....................
796 12.............
7M 13..............................
789 14.....
7M 15....................................
7N 16..............................
795 17.......................
793 18................................
7M 19................................
7M i
E................................
7M 21.................................
7M i
D............................
7R 23............................
793 24 7M 25...................................
785 M..........
797 27..................................
7M 28................................
798 29..............
799 31..........................
I l
J E1-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-321 DATE: AUGUST 2,1996 UNIT NAME: E.1. HATCH -UNIT ONE COMPLETED BY: S. B. ROGERS TELEPHONE. (912) 367-7781 x2878 REPORT MONTH:
JULY 1996
- R M S
E E
Y T
A T UCENSEE SC Y
S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D NUMBER ME (SUBCODE)
PREVENT RECURRENCE No si nificant power reductxms 9
occurred this month.
TYPE:
REASON:
METHOD:
EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B44AINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUEUNG 3 AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4 CONTINUATIONS E-OPERATOR TRAINING & UCENSE 510AD REDUCTION F-ADMINISTRATIVE 94THER (EXPLAIN)
GOPERATIONAL ERROR (EXPLAIN)
H.OTHER (EXPLAIN)
E1-4
Plant Hatch Unit 2 Monthly Operating Report July 1996 Table of Contents P_ age Narrative Repon E2-1 Operating Data Report E2-2 Average Daily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4 HL-5218
PLANT E. l. HATCH - UNIT TWO DOCKETNO.: 50-366 DATE: AUGUST 2,1996 NARRATIVE REPORT COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 JULY 1 0000 Shift continued to maintain rated thermal power.
JULY 13 2315 Shift began reducing load to approximately 810 GMWe to perform Turbine Stop Valve and Bypass Valve Testing.
JULY 13 2359 Shift began ascension to rated them~ial power.
JULY 14 0015 The unit attained rated thermal power.
JULY 31 2400 Shift continued to maintain rated thermal power.
f E2-1
I i
i, I
OPERATNG DATA REPORT DOCKETNO.: 50-306 DATE: AUGUST 2,1996 l
COMPLETED BY: S. B. ROGERS i
TELEPHONE: (912) 367-7781 x2878 i
OPERATNG STATUS I
i
- 1. UNIT NAME:
E.1. HATCH - UNIT TWO
- 2. REPORT PERIOD.
JULY 1996
- 3. UCENSED THERMAL POWER (MWI):
2568
- 4. NAMEPLATE RATING (GROSS MWe):
850 l
S. DESIGN ELECTRICAL RATING (NET MWe):
784 1
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
844 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
809
- 8. IF CHANGES OCCUR W CAPACITY RATNGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GNE REASONS.
NO CHANGES i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
WA THIS MONTH YEAR-TOCATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5111 148056 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 5004.1 115485.7 l
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 t
- 14. HOURS GENERATOR ON LINE:
744.0 4966.7 111617.7 l
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHI),
1902379 12498605 248864406
)
4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe):
632234 4188776 81623035
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe):
605838 4016885 77774346
- 19. UNIT SERVICE FACTOR:
100.0 %
97.2%
75.4 %
j
- 20. UNIT AVAILABluTY FACTOR:
100.0 %
97.2%
75.4 %
- 21. UNIT CAPACITY FACTOR (USING nOC NET):
100.7 %
97.1 %
68.7 %
l
- 22. UNIT CAPACITY FACTOR (USING DER NET):
103.9 %
100.2 %
67.0%
j
- 23. UNIT FORCED OUTAGE RATE:
0.0%
1.2%
6.7%
1
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): WA
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
WA
- 26. UNITS N TEST STATUS (PRIOR TO CohWERCIAL OPERATION):
WA 4
E2-2
PLANT E.1. HATCH - UNIT TWO DOCKET NO.: 50 366 DATE: AUGUST 2,1996 AVERAGE DAILY POWER LEVEL COMPLETED BY: S. B. ROGERS TELEPHONE: (012) 367-7781 x2878 JULY 1996 DAY Not MWe 1................................
814 2................................
812 3..........................
812 4............................
817 5..............................
815 6....................
816 7.................................
815 8.
815 9.
814
.......... ~..............
10.....
813 1 1....
812 12................................
814 13..
814 14.............................
814 15..............................
815 16.................................
815 17.............................
813 1 8..............
814 19...........................
813 20.
813 21.....
813 22....................................
813 23............................
813 24.........................
814 25.......
816 26...........................
815 27.........
815 28.....................
816 29........
817 30.......................
815 31....
814 E2-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-306 DATE: AUGUST 2,1996 UNIT NAME: E. l. HATCH-UNIT TWO COMPLETED BY: S. B. ROGERS TELEPHONE: (912) 367-7781 x2878 REPORT MONTH.
JULY 1996 R M S
E E
Y T
A T UCENSEE SC Y
S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D NUMBER ME (SUBCODE)
PREVENT RECURRENCE No significant power reductions occurred this rnonth.
TYPE:
REASON METHOD:
EVENTS REPORTED WVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION W AVERAGE j
S-SCHEDULED 544AINTENANCE OR TEST 244ANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING SAUTOMATIC SCRAM THE PRECEDMG 24 HOURS.
EMtEGULATORY RESTRICTION 4 CONTNUATIONS E-OPERATOR TRAINING & UCENSE 54.OAD REDUCTION F ADMINISTRATIVE SOTHER (EXPLAW)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
E2-4