Special Rept:On 920309,fire Barrier Between Room 81 & Turbine Bldg Damaged & Declared Inoperable.Replacement Door Shipped W/O Required Qualification Documentation Therefore Installation Delayed.Installation Completed by 920430
ML20095A781
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/15/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-128S, NUDOCS 9204210033
Download: ML20095A781 (2)


Text

_ _ _ _ _ _ _ _ - _ -

w-

-~

_ _. _ _ . . . _ . _ . _ _ . . . ~ . - . _ . - . _ _ _ . . _ _ _ - - -

- - - .- m -

Omaha Public Power District 444 South 16th Street Mall Omaha. Nebraska 68102 2247 402/636-2000 April 15, 1992 LIC-92-128S U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station: P1-137 Washington, D. C. ?0555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Special Report on Inoperability of Fire Protection Equipment The Omaha Public Power District (OPPD), holder of Operating License DPR-40, submits this report pursuant to the requirements of Fort Calhoun Station (FCS)

Unit No. 1, Tecnnical Specification (TS) Section 2.19, " Fire Protection System."

FCS Technical. Specification Section 2.19(7), requires that all penetration fire barriers protecting safety-related areas shall be functional (intact). With a penetration fire barrier non-functional, witnin one hour, either a continuous ~

fire watch is to be established on at least one side of the affected penetration, or the operability of fire detectors on at least one side of the penetration is to be verified and an hourly fire watch patrol established. The non-functional penetration is to be restored to functional status within seven days, or a report is to be prepared and submitted to the Nuclear Regulatory Commission pursuant to TS Section 5.9.3 within an additional 30 days.

On March 9, 1992, Fire Door 1036-11, located in the fire barrier between Room 81 and the Turbine Building, was damaged and declared inoperable. This door must be replaced with a new door. Because the new door was shipped without the required qualification documentation, installation has been delayed . The required documentation has been received and installation of the new door will be completed by April 30, 1992. The fire barrier remains breached at this time.

Appropriate coo >ensatory measures, as required by TS Section 2.19(7), were instituted at tie time of the impairment and will remain in place until the fire barrier is restored.

9204210033 920415 b i PDR ADOCK 05000285 1 cs.s t 24 S PDR gyerm tma ogxnur.,13 [gfs ,

- , u,,

L

' Io LIC-92-128S Page Two If you have any questions, please contact me.

Sincerely, AV. 5 /M W. G. Gates Division Manager Nuclear Operations WGG:lah c: LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, Regional Administrator, Region IV D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer R. P. Mullikin, NRC Senior Resident Inspector I