Special Rept:On 920116,0130,0205,07 & 08,listed Fire Protection Equipment Inoperable for More than 7 Days. Required Compensatory Measures Will Remain in Place Until Equipment Functional or Documentation Located
ML20090A310
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/24/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-054S, LIC-92-54S, NUDOCS 9203020261
Download: ML20090A310 (2)


Text

_ _ _ _ _ - _ - _ _ _ _ _ - _ - - - - _ _

, o s Myy ******" .Y "*" r=^2rd Omaha Public Power District 444 South 16th Street Mall i Omaha, Nebraska 68102 2247 402/636-2000 February 24, 1992 LIC-92-0545 U. S. Nuclear Regulatory Commission Attn Docunent Control Desk Mail Station P1-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen

SUBJECT:

Special Report on Inoperability of Fire Protection Equipment The Omaha Public Power District (0 PPD), holder of Onerating License DPR-40, submits this report pursuant to the requirements of Fort Calhoun Station (FCS)

Unit No. 1 Technical Specification (TS) 2.19, " Fire Protection Systems".

FCSTechnicalSpecificationSection2.19(7)requiresthatallpenetrationfire barriersprotectingsafety-relatedareasshallbefunctional(intact). With a penetration fire barrier non-functional, within one hour, either a continuous fire watch is to be established on at least one side of the affected penetration, or the operability of fire detectors on at least one siae of the penetration is to be verified and an hourly fire watch patrol established. The non-functional penetration must be restored to functional status within seven days or, failing that, a report to the Nuclear Regulatory Commission pursuant to TS 5.9.3 is to be pei,ared and submitted within an additional 30 days.

On January 16, 1992, roll-up fire door 1007-1, between Corridor ~ ind the l Radwaste Building, was breached to install a personnel access door in the roll-up door. This fire door was returned to service on February 7, 1992. A)propriate compensatory measures, as required by TS 2.19(7), were in place for tie duration l of the impairment.

On January 30, 1992, two previously unidentified conduit penetrations were identified in the east wall of Room 81, which separates Room 81 from the Turbine Building. These conduit penetrations are sealed with grout and are considered to be correctly installed, however, no installation documentation was readily available to verify this. The penetrations were conservatively declared inoperableandappropriatecompensatorymeasures,asrequiredbyTS2.19(7),were instituted. The required compensatory measures will remain in place until installation documentation is found or an ins)ection is performed to verify adequate installation. This impairment will >e restored by the end of the 1992 Refueling Outage.

9203020261 920224 PDR ADDCK 05000285 S PDR 45su4 g ,

UahOd4

-/g

. ,i LTC-92-0545 Page Two 1992, penetration 19-E-30, between Room 19 and the Turbine On Building, February was 5, breached to support installation of Modification MR-FC 90-026, " Raw i Water Discharge Valve Replacement". The penetration remains breached at this ,

time. Appropriatecompensatorymeasures,asrequiredbyTS2.19(7),were instituted at the time of the impairment and will remain in place until the fire barrier penetration is restored. This impairment will be restored by the end of the 1992 Refueling Outage.

On February 5, 1992, penetration 57E-W-8, between Rooms 57E and 57W, was declared  ?

inoperable because several gaps in the Ceraboard facing on both sides of the penetration were not caulked. This penetration was returned to service on February 13, 1992. Appropriatecom)ensatorymeasures,asrequiredbyTS2.19(7),  ;

were in place for the duration of. tie impairment.

On February 7, 1992, the Personnel Air Lock between the Auxiliary Building and Containment was opened to facilitate access to Containment during the current refueling outage. This air lock will be opened and closed several times in the course of the outage and has been conservatively declared an administratively declared impaired fire barrier for the duration of the outage. Appropriate compensatory measures, as required by TS 2.19(7), were in place at the time of impairment and will remain in place for the duration of the impairment. This impairment will be restored by the end of the 1992 Refueling Outage.

On February the Turbine Bu 8,ilding to Room 81 to support work on a modification and other1992, pi outage work. Appropriatecompensatorymeasures,asrequiredbyTS2.19(7),were instituted prior to impairing the penetration and will remain in place for the duration of the impairment. This impairment will be restored by the end of the 1992 Refueling Outage.

If you should have any questions, please contact me.

Sincerely, du, $.' $ 6e W. G. Gates Division Manager Nuclear Operations WGG/dle 4 c: LeBoeuf, Lamb, Leiby & MacRao R. D. Martin, NRC Regional Administrator D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer R. P. Mullikin, NRC Senior Resident inspector