LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With
ML20206N404
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/30/1998
From: Edwards M, Gambhir S
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-98-0172, LIC-98-172, NUDOCS 9812170080
Download: ML20206N404 (3)


Text

-

3

~

8998

~

444 Soue lah SkeetMet Omaha, Nebraska 681022247 December 15,1998 LIC-98-0172 l

U. S. Nuclear Regulatory Commission Attn.: Document Control Desk '

Mail Station PI-137 Washington, D.C. 20555

Reference:

Docket No. 50-285 l

SUBJECT:

November 1998 Monthly Operating Report (MOR) j The November 1998 MOR for Fort Calhoun Station (FCS) Unit No.1 is attached as required by FCS Technical Specification 5.9.1.

If you have any questions, please contact me.

Sincerely,

%de S. R. Gambhir Division Manager Nuclear Operations SKG/mle Attachments k c: E. W. Merschoff, NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector R. J. Simon, Westinghouse g ( })I.

INPO Records Center / i Winston & Strawn 9812170000 981130 Y PDR ADOCK 05000285 U R PDR Y*

6 455124 Employment with Equal Opportunity

~

ATTACHMENT I

, OPERATING DATA REPORT DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE December 10.1998 COMPLETED BY M. L. Edwards TELEPHONE (402) 533-6929 i

REPORT PERIOD: November 1998

1. Design Electrical Rating (Mwe-Net): 478
2. Maximum Dependable Capacity (Mwe-Net): 478 OPERATING STATUS THIS MONTii YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor was Critical: 720.0 6484.3 175376.8
4. Number of Hours Generator was On-line: 720.0 6452.4 173452.2
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 352160.8 3032309.9 73836670.7 I

l l

. . o. -

+

~ ATTACHMENT 11 DOCKET NO. 50-285 UNIT SHUTDOWNS UNIT NAME Fort Calhoun Station DATE December 10.1998 REPORT MONTH November 1998 COMPLETED BY M. L. Edwards '

TELEPHONE (402) 533-6929 I of '

liDeEf $9pej _ . . Duration (AeasonD

~ Method $ -

. JSimiting]( [

^

g y.1 ,

'M r==Jijarrective[

+ , M ~ a; g

F: Forcid( . . (Hours)J

.. . GActMn tdSt  :* _

~ -

^

1Scheddleds.g

~~

sDsEReactSiM $ ,$PE$esi"RML,$.m7m -

None (1) (2)

Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

During the month of November 1998, the Fort Calhoun Station (FCS) operated at a nominal 100% power. Normal plant maintenance, surveillance and equipment rotation activities were performed.

During the month of November 1998, no power operated relief valves (PORV) or primary system safety valve challenges or failures occurred.

_. _ ., - . - .e ~ . - . - . , - <- ,