LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With
ML20153B212
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/1998
From: Edwards M, Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-98-0122, LIC-98-122, NUDOCS 9809230015
Download: ML20153B212 (3)


Text

. . - - . - .-. . - . - -. _ - - - . - . .

I E998 444 Souah 18h Stok Md I 0mnha,NottneksN #2247 ,

l I

September 15,1998 LIC-98-0122.  !

U. S. Nuclear Regulatory Commission Attn: Document Control Desk l

- Mail Station PI-137 Washington, D.C. 20555

Reference:

Docket No. 50-285

SUBJECT:

August 1998 Monthly Operating Report (MOR)

The August 1998 MOR for Fort Calhoun Station (FCS) Unit No.1 is attached as required by FCS Technical Specification 5.9.1.

If you have any questions, please contact me.

Sincerely, .

V]&

W. G. Gates

Vice President '

WGG/mle ;i Attachments

/jV.

c: E. W. Merschoff, NRC Regional Administrator, Region IV i L. R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector R. J. Simon, Westinghouse l INPO Records Center Winston & Strawn I:

9909230015 990931

PDR ADOCK 05000295 R PDR ,

, r, , . m

% .,i I (

45 5'14 Ernptoyment with Equalopportunity

l , ,

ATTACHMENT I OPERATING DATA REPORT l

DOCKET NO. 50-285 UNIT NAME Fort Calhoun Station DATE September 4.1998 COMPLETED BY M. L. Edwards TELEPHONE (402) 533-6929 i

REPORT PERIOD: August 1998

1. Design Electrical Rating (Mwe-Net): 478 j
2. Maximum Dependable Capacity (Mwe-Net): 478 OPERATING STATUS THIS MONTII YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor was Critical: 744.0 4299.3 173191.8
4. Number of Hours Generator was On-line: 744.0 4267.4 171267.2
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 352265.8 1974466.7 72778827.5 i

1 i

+

  • L ATTACHMENT 11 DOCKET NO. 50-285- -

UNIT SHUTDOWNS. UNIT NAME1 Fort Calhoun Station -

DATE September 4.1998 -

REPORT MONTH August 1998 COMPLETED BY M. L. Edwards El EPHONE -(402) 533-6929

+

\ b

^

' .. ^y >

,[ ,

'>;Prevent:,shiS6syfEj

~ ~

F: Forami ~+ (jHoursh f , Shutting ~

~

S: ScheduW - I~ J~ '~'~V

- . Down Reactor' X[gg - M '

h ' yM' - +d l'$31sik' @^,q.

4- ~ f5f W- -

None P

(1) (2)

Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram

. D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain) .

F-Administrative  ;

G-Operational Error (Explain)

H-Other (Explain)

OPERATIONS

SUMMARY

During the month of August 1998, the Fort Calhoun Station (FCS) operated at a nominal 100% power. Normal plant maintenance, surveillance, and equipment rotation activities were performed during the month.

During the month of August 1998, no power operated relief valves (PORV) or primary system safety valve challenges or failures occurred.

b

]

4 L