Special Rept:Consisting of Restoration Info on Impairment of Fire Detection Zones,Fire Doors & Fire Barrier Penetrations. Compensatory Measures in Effect During Period of Inoperability.Fire Door 1013-6 Restored on 881123
ML20247L665
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/19/1989
From: Morris K
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-89-778, NUDOCS 8909250039
Download: ML20247L665 (2)


Text

, _ _. . . _ - _ _

:w ,

!.- j

%:-  :: = : ::== ::: ::. : : ' . - -- -- '~ ' ^ =:: = . :: g .:- - '::--':':'"~ ' ' ' ~ ~ ' ' -~:. T*~=~.=E'-'~'~~M'~~==^~ '^;

~

~;~~'~

p i Omaha Public F ,wer District l 1623 Hamey Omaha. Nebraska 68102 2247 {'

. September 19, 1989 402/536-4000 LIC-89-718 U. S. Nuclear Regulatory Commission Attn:- Document Control Desk Mail Station Pl-137 Washington, D.C. 20555

References:

1) Docket No. 50-285
2) Letter from OPPD (K. J. Morris) to NRC (Document Control Desk) dated November 14, 1988 (LIC-88-1006)
3) Letter from OPPD (K. J. Morris) to NRC (Document Control Desk) dated July 10, 1989 (LIC-89-551)

Gentlemen:

SUBJECT:

Follow-Up to Special Reports on Inoperability of Fire Barriers and Fire Detection Systems Omaha Public Power District (OPPD) reported in Reference 2 and Reference 3 the inoperability of several fire barriers and fire detection systems. The purpose of this submittal is to inform you that the barriers and detection systems have been returned to operable status. Two of the fire barrier penetrations were not returned to an operable status by the scheduled restoration date, provided in Reference 2, because the material certification for the structural concrete used in the barriers took longer than estimated to complete. Comper:satory measures were in effect during the time of inoperability; therefore, the delay did not present a safety concern. The barriers / systems which remained inoperable at the time Reference 2 and Reference 3 were filed are listed in the attachment, along with the scheduled and actual restoration dates.

If you have any questions regarding this matter, please contact us.

Sincerely, K. J. Morris /,Ai Division Manager U Nuclear Operations g9 KJM/cfs g9op2.,gg39 g999 9 1 PDR ADOCK 05000285 Attachment 5 FDC c: LeBoeuf. Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator A. Bournia, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector e se4 imunumenyy omonunau

e; .

.a -

4 ATTACHMENT Restoration Information on Fire Protection System Impairments Subinitted in Reference 2 and Reference 3.

Date Scheduled Actual Impairment inoperable Restoration Date Restoration Date Fire Detection Zone 9 10/1/88 4/1/89 2/18/89 Fire Detection Zone 30 10/5/88 4/1/89 1/21/89 Fire Door 1036-2 10/7/88 2/1/89 12/12/88 Fire Barrier Penetration Seal 81-N-6 10/20/88 12/31/88 1/4/89 Fire Barrier Penetration Seal 81-N-8 10/20/88 12/31/88 1/4/89 Fire Detection Zones 32 and 36 10/15/88 4/30/89 12/30/88 Fire Detection Zones 23 and 35 10/28/88 4/30/89 1/4/89 Fire Door 1025-4 10/29/88 3/1/89 2/14/89 Fire Door 1013-6 10/26/88 2/1/89 11/23/88 Fire Barrier Penetration Seal 53-N-2 6/2/89 7/31/89 7/29/89 l

Fire Barrier Penetration l Seal 26-W-1 6/6/89 7/31/89 7/29/89 l _ _ - . -----------