Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With
ML20199F613
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/31/1998
From: Edwards M, Gambhir S
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-99-0003, LIC-99-3, NUDOCS 9901210372
Download: ML20199F613 (3)


Text

..

BYPE Omahn Pab5cPone Oerict 444 South Inh Skee Mat Omaha, Nebraska 68102347 January 15,1999 LIC-99-0003 U. S Nuclear Regulatory Commission Attn.: Document Control Desk Mail Station PI-137 1 Washington, D.C. 20555

Reference:

Docket No. 50-285 ,

1 t

SUILIECT: December 1998 Monthly Operating Report (MOR) l The December 1998 MOR for Fort Calhoun Station (FCS) Unit No.1 is attached as required by FCS Technical Specification 5.9.1.

If you have any questions, please contact me.

Sincerely, S. K. Gambhir

\

Division Manager Nuclear Operations SKG/mle Attachments I

c: E. W. Merschoff, NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident inspector

(

R. J. Simon, Westinghouse INPO Records Center Winston & Strawn y egllU

,} /g J) 9901210372 981231 PDR ADOCK 05000285 j R PDR

! 4F5124 Employment with Equalopportunity

! o i

>* c.

l

. ATTACHMENT I OPERATING DATA REPORT DOCKET NO. 50-285 .

UNIT NAME Fort Calhoun Station l l DATE January 7.1999 i COMPLETED BY M. 1.

Edwards TELEPliONE (402) 533-6929 l

l l REPORT PERIOD: December 1998 l l

1. Design Electrical Rating (Mwe-Met): 478
2. Maximum Dependable Capacity (Mwe-Net): 478 l OPERATING STATUS l THIS MONTH YR-TO-DATE CUMULATIVE
3. Number of Ilours Reactor was Critical: 744.0 7228.3 176120.8 I

, 4. Number of Hours Generator was On-line: 744.0 7196.4 174196.2

5. Unit Reserve Shutdown liours: 0.0 0.0 0.0 I
6. Net Electrical Energy Generated (MWH): 364274.5 3396584.4 74200945.2 l i

i 1

i l

- . _ - ~ - - . .. - . - - _ - - _ _ - - - - - - - - - - - - _ - _ _ _ - - _ _ - - - - - - - - - - - - _ _ - _ - _ - - - _ . _ -

k

. q

. ATTACHMENT II DOCKET NO. 50-285'-

UNIT SHUTDOWNS UNIT NAME Fort Calhoun Station -

DATE Lanuary 7.1999 ,

i REPORT MONTH December 1998 COMPLETED BY - M. L. Edwwds TELEPHONE (402) 533-6929 M

^

$ d$ kDidb Duration fh$mchh ' $$$bodh t 1.gg [. y ^ Camd.YCorrective e klfhn i "iis; . , ' ' ' " " !Fi F$; L -ecedl '- *ActionAi

~ 'lW ~,"M

~ ~

E(Hoursh: Shuttiing .' . i

~

g

~; >

g i- ~

g n35, t

i None me -

(1) (2)

' Reason: Method:

A-Equipment Failure (Explain) 1-Manual t B-Maintenance or Test 2-Manual TrigvScram I C-Refueling 3-Automatic Trip / Scram ,

D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain) ~ .

F-Administrative j

, G-Operational Error (Explain)

II-Other (Explain) l I

OPERATIONS

SUMMARY

During the month of December 1998, the Fort Calhoun Station (FCS) operated at a nominal 100% power. Normal plant maintenance, surveillance and equipment rotation activities l were performed.

  • During the month of December 1998, no power operated relief valves (PORV) or primary system safety valve challenges or failures occurred j f