Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217B5406 October 1999Safety Evaluation Supporting Amend 193 to License DPR-40
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With30 September 1999Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With
ML20211J9322 September 1999Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1Boric Acid
VT-2
Incorporated by reference
LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With31 August 1999Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With
ML20216E64326 August 1999Rev 19 to TDB-VI, COLR for FCS Unit 1Boric Acid
Shutdown Margin
ML20210R19631 July 1999Monthly Operating Rept for July 1999 for Fcs,Unit 1
ML20210G21827 July 1999Safety Evaluation Supporting Amend 192 to License DPR-40Boric Acid
Shutdown Margin
ML20210D99522 July 1999Safety Evaluation Supporting Amend 191 to License DPR-40Fuel cladding
ML20216E63621 July 1999Rev 18 to TDB-VI, COLR for FCS Unit 1Shutdown Margin
ML20210R20830 June 1999Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1
LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20210P5468 June 1999Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included
ML20195B45831 May 1999Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts
ML20207H74031 May 1999Performance Indicators Rept for May 1999High Radiation Area
Temporary Modification
Zebra Mussel
Maintenance Rule Program
Power change
LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 131 May 1999Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1
ML20195B45217 May 1999Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr)Boric Acid
Hydrostatic
Pressure and Temperature Limits Report
ML20206L42410 May 1999Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07Boric Acid
Power-Operated Valves
Backfit
ML20206M2606 May 1999SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & HistoryHot Short
Safe Shutdown
High winds
Tornado Missile
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
Fire Protection Program
LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With
ML20195E86230 April 1999Performance Indicators, for Apr 1999
ML20205Q58315 April 1999Safety Evaluation Supporting Amend 190 to License DPR-40
ML20210J43331 March 1999Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59
ML20206G26431 March 1999Performance Indicators Rept for Mar 1999Temporary Modification
Severe Accident Management Guideline
Maintenance Rule Program
Fuel cladding
LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With
ML20205J81828 February 1999Performance Indicators, for Feb 1999Temporary Modification
Job Performance Measure
Severe Accident Management Guideline
Maintenance Rule Program
Fuel cladding
LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With28 February 1999Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With
ML20207F32931 January 1999FCS Performance Indicators for Jan 1999Temporary Modification
Job Performance Measure
Severe Accident Management Guideline
Maintenance Rule Program
Fuel cladding
ML20203B09931 December 1998Performance Indicators for Dec 1998
LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with31 December 19981998 Omaha Public Power District Annual Rept. with
LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With31 December 1998Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With
ML20198S37731 December 1998Safety Evaluation Supporting Amend 189 to License DPR-40
ML20198S48331 December 1998Safety Evaluation Supporting Amend 188 to License DPR-40Shutdown Margin
Probabilistic Risk Assessment
ML20196G22518 December 1998Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment
ML20198M31430 November 1998Performance Indicators Rept for Nov 1998High winds
Temporary Modification
Missed surveillance
Job Performance Measure
Grace period
Power change
LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With30 November 1998Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With
LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated25 November 1998Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be InvestigatedPost Accident Monitoring
ML20203B07216 November 1998Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity ExpansionFinite Element Analysis
Fuel cladding
ML20196E49831 October 1998Performance Indicators Rept for Oct 1998High winds
Temporary Modification
Missed surveillance
Job Performance Measure
Generic Fundamentals Examination
Grace period
Power change
ML20196G24431 October 1998Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Temporary Modification
Fire Protection Program
Scaffolding
LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With31 October 1998Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.WithTemporary Modification
ML20154M48819 October 1998Safety Evaluation Supporting Amend 186 to License DPR-40Boric Acid
Probabilistic Risk Assessment
ML20154N24119 October 1998Safety Evaluation Supporting Amend 187 to License DPR-40
LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With30 September 1998Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With
ML20155G42630 September 1998Performance Indicators for Sept 1998Temporary Modification
Missed surveillance
Power change
ML20154A12531 August 1998Performance Indicators, Rept for Aug 1998High winds
Temporary Modification
Missed surveillance
Job Performance Measure
Grace period
Power change
LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With31 August 1998Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With
ML20238F72317 August 1998Owner'S Rept for IsisHydrostatic
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency