Category:Meeting Summary
MONTHYEARML24107B1272024-04-22022 April 2024 Ft. Calhoun Meeting Summary of March 27, 2024 Meeting with Omaha Public Power District on Submittal of Phase 1 Final Status Surveys ML19071A0302019-03-13013 March 2019 Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML17167A2622017-06-27027 June 2017 Summary of 5/31/2017 Meeting at Double Tree Hotel, Omaha, Ne, to Discuss and Accept Comments Regarding the Fort Calhoun Station Post-Shutdown Decommissioning Activities Report ML16298A2912016-10-27027 October 2016 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss Decommissioning Licensing Actions for Fort Calhoun Station, Unit No. 1 ML16259A1132016-09-20020 September 2016 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 ML16036A3502016-02-23023 February 2016 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 ML15114A3782015-05-0707 May 2015 4/23/15 Summary of Pre-application Meeting with Omaha Public Power District, Proposed License Amendment Requests to (1) Reclassify Systems Based on ANSI 58.14 and (2) Adopt American Concrete Institute Code ACI-318 (1971) for Fort Calhoun St ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14344A0872014-12-19019 December 2014 12/2/2014 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures at Fort Calhoun Station, Unit 1 ML14230A0802014-08-21021 August 2014 Memorandum to File, Verbal Granting of Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML14192A9822014-08-0606 August 2014 Summary of Meeting with Omaha Public Power District to Discuss License Amendment to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13338A2992013-12-0202 December 2013 Summary of Public Meeting in Omaha, Ne ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13134A1862013-06-0303 June 2013 4/22/2013 - Summary of Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Sei ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13114A8812013-04-25025 April 2013 4/22/2013 - Summary of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML12366A0322013-01-25025 January 2013 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12269A2242012-09-25025 September 2012 Meeting Summary of with Omaha Public Power District ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12104A2642012-04-13013 April 2012 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station ML1204004582012-02-0909 February 2012 Summary of Meeting with Omaha Public Power District to Discuss Specifics of the Transition of Fort Calhoun Station to Regulatory Oversight Under the NRC Inspection Manual Chapter 0350 Process ML1122116172011-08-0505 August 2011 7/27/2011- Summary of Public Meeting with Omaha Public Power District to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station ML1116801512011-07-11011 July 2011 5/26/11 Summary of Prelicensing Meeting with Omaha Public Power District to Discuss License Amendment Request to Adopt Risk-Informed National Fire Protection Association Standard NFPA 805 or Fort Calhoun Station, Unit 1 ML1116600272011-06-14014 June 2011 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1111014372011-05-17017 May 2011 Summary of Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1110204072011-05-17017 May 2011 Summary of 03/02/11 Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1102600062011-02-0707 February 2011 Summary of 1/13/2011 Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1021101372010-08-0606 August 2010 Summary of 7/16/2010 Conference Call with Licensee to Discuss the 10/14/2008 Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems ML1019403012010-07-29029 July 2010 6/30/2010 Summary of Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML1006200722010-03-23023 March 2010 Summary of Category 1, Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0931401772009-11-18018 November 2009 Summary of November 5, 2009, Category 1 Meeting with Omaha Public Power District to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 ML0916801382009-06-30030 June 2009 Summary of Conference Call Regarding Issues Related to the Cracking of Mitsubishi Heavy Industries Ltd.-Fabricated Replacement Steam Generators for San Onofre Nuclear Station, Unit 3 ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903706432009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 2024-04-22
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12258A0502012-09-10010 September 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Supplement Materials 1, 2, and 3 for 2.206 - Fort Calhoun Nuclear Power Station ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806004562008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Experiences with Large Component Replacements - Spilker ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] |
Text
0 toUNITED STATES C, isNUCLEAR REGULATORY COMMISSION
.4, REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 APR - 2 2003 R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, Nebraska 68023-0550
SUBJECT:
MEETING
SUMMARY
FOR END-OF-CYCLE PERFORMANCE ASSESSMENT
Dear Mr. Ridenoure:
This refers to the end-of-cycle performance assessment meeting conducted at the Holiday Inn Southwest in Omaha, Nebraska, on March 27, 2003. The meeting attendance list and a copy of the slides presented during the meeting are enclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/Iwww.nrc.aov/reading-rm/adams/index.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, CLLa Claude E. Johnson, Chief Project Branch C Division of Reactor Projects Docket: 50-285 License: DPR-40
Enclosures:
- 1. Attendance List
- 2. NRC Presentation
Omaha Public Power District cc w/enclosures:
John B. Herman, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, Nebraska 68023-0550 Richard P. Clemens, Division Manager Nuclear Assessments Fort Calhoun Station P.O. Box 550 Fort Calhoun, Nebraska 68023-0550 David J. Bannister, Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, Nebraska 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, Nebraska 68008 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, Iowa 50309 Timothy F. Dunning, Sheriff Douglas County Hall of Justice 17th and Farnam
Omaha Public Power District Omaha, Nebraska 68102 Carole Woods-Harris, Chairman Douglas County Board of Commissioners Civic Center 1819 Farnam Omaha, Nebraska 68183 Steve Lee, Director Emergency Management Agency Douglas County Civic Center EOC, Room 114 Omaha, Nebraska 68183 Todd Baber Emergency Management Agency Harrison County 111 South 1st Avenue Logan, Iowa 51546-1305 Terry Baxter, Sheriff Harrison County Sheriffs Department Logan, Iowa 51546 Larry King, Chairman Harrison County Board of Supervisors Court House Logan, Iowa 51546 The Honorable James Long Mayor of Missouri Valley City Hall 223 E. Erie Missouri Valley, Iowa 51555 Terry Hummel Emergency Management Coordinator Pottawattamie County 227 S. 6th Street, Court House Council Bluffs, Iowa 51501 Melvin Houser, Chairman Pottawattamie County Board of Supervisors 227 South 6th Street Council Bluffs, Iowa 51501
Omaha Public Power District 4-Mike Robinson, Sheriff Washington County Courthouse 1535 Culfax Blair, Nebraska 68008 John Shotwell, President Blair City Council 218 S. 16th Street Blair, Nebraska 68008 The Honorable Jim Realph Mayor of Blair 218 South 16th Street Blair, Nebraska 68008 The Honorable Paul Oestmann Mayor of Fort Calhoun P.O. Box 448 Fort Calhoun, Nebraska 68023 David Genoways, President Fort Calhoun City Council P.O. Box 448 Fort Calhoun, Nebraska 68023 Bill Pook, Director Region 5/6 Emergency Management 435 N. Park Avenue, Room B101 Fremont, Nebraska 68025 Dick Hainje, Regional Director Federal Emergency Management Agency Region VII 2323 Grand Blvd., Suite 900 Kansas City, Missouri 64108-2670 Dianne Munns, Chairman Department of Commerce Utilities Division Iowa Utilities Board 350 Maple Street Des Moines, Iowa 50319 Donald A. Flater, Chief Bureau of Environmental Health, 5th floor Iowa Department of Public Health 401 SW 7th, Suite D Des Moines, Iowa 50309
Omaha Public Power District Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65102 Robert Quinn, Executive Director Missouri Public Service Commission P.O. Box 360 Jefferson City, Missouri 65102 Robert Leopold, State Liaison Officer Nebraska Health and Human Services Department of Regulation and Licensure Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Mr. Al Berndt, Assistant Director Emergency Management Agency 1300 Military Road Lincoln, Nebraska 68508
tl'IULUZUKL I END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Omaha Public Power District Fort Calhoun Station DATE/TIME March 27, 2003 / 7:00 p.m.
LOCATION Holiday Inn Express 10729 J Street Omaha, Nebraska NAME (PLEASE PRINT) ORGANIZATION I 44-4<A I S- S0 PPa l G(
k ;\ Gx O _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
i~~Pae )/ of g 1IjLanebIt>ijneea* J W~ )~tJA}
Page L of a.
END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Omaha Public Power District Fort Calhoun Station DATE/TIME March 27, 2003/ 7:00 p.m.
LOCATION Holiday Inn Express 10729 J Street Omaha, Nebraska NAME (PLEASE PRINT) ORGANIZATION 50t rM A, O&D
- L;4J~l 4'1ste/k cPf5D 44, CO /Y*DEuSkf
- 0. RO OAPIO-4 litA (27'C '(r-' A~c 0Wtj~-
Page X of R
ENCLOSURE 2 ANNUAL ASSESSMENT NRC Meeting Purpose MEETING
- Meeting with Licensee and Public
- Inform Public of Plant Performance Nuclear Regulatory Commission Region IV NRC Meeting Guidelines Regional Organization
- Handouts Fort Calhoun Station Nuclear Regulatory Commission Region IV I
Assessment of Safety Performance NRC PERFORMANCE GOALS at the Fort Calhoun Station
- Maintain public safety and protect the environment
- Enhance public confidence
- Effectiveness
- Efficiency
- Realism of processes and decision making
- Reduce unnecessary regulatory burden Meeting Agenda
- QUESTIONS AND ANSWERS Resident Inspectors Reqional Inspectors
- Prompt response capability
- 3595 hours0.0416 days <br />0.999 hours <br />0.00594 weeks <br />0.00137 months <br /> of oversight
- 3183 hours0.0368 days <br />0.884 hours <br />0.00526 weeks <br />0.00121 months <br /> of oversight 0;
2
NRC Oversight Activities
- Based on a logical and sound framework
. Provide assurance plants are:
- Operating safely
- Complying with regulations
. Inspections focused on key safety areas
- Objective indicators of performance
- Assessment program triggers regulatory actions Baseline Inspection Program
- Gathers objective evidence of plant safety
- Focuses on safety-significant:
- systems
- components
- activities
- events Baseline Inspection Program Event Follow-up and Supplemental Inspections
- Inspection reports describe significant
- Review events for significance findings and non-compliance
- Follow-up significant inspection findings
- Inspection reports are publicly accessible
- Determine causes of performance declines www.NRC.gov/reading-rm/adams.htmI to ensure effective corrective actions
- Provide for graduated response
.'. WI 3
Reactor Oversight Process Performance Indicator SAFETY SIGNIFICANCE Program
_ _ - very low
- Licensee monitors key safety parameters l WI - low to moderate
- Data supplied to NRC quarterly
- substantial
- highi Performance Indicators Performance Indicators Unplanned Scrams per 7000 critical hours
- Performance indicator results and other assessment information available on the 0 2 02 a
3 02 4 02 Thresholds:
NRC's public web site:
5 White >3.0, 10 www.NRC.aovINRR/OVERSIGHT/ASSESS/ I5 Yellow >6.0, FCS/fcs Html 20 Red >25.0 25 ___
Uapl nd or no p.r 7000 dtitjo.I hour- l 20102 30102 40/02 Actua ..-I-n.l 0 0 0 CU.lcl ho... 1541.0 2208 l 2208
_ .dia.to.'vh I 0 0 0 Key Aspects of the Plant Safety Performance Summarv Assessment Program
- Objective review of licensee performance
- "Action Matrix" to determine agency response in three areas:
- Inspection
- Management Involvement
- Regulatory Actions
- Plant specific assessment letters
- Information on NRC public web site g 4
Plant Specific Data Major Plant Activities in 2002 Inspected by NRC Name of Plant: Fort Calhoun Station
- IEB 2002-02 "Reactor Pressure Vessel Head and Plant Operator Omaha Public Power District Vessel Penetration Nozzle' Inspection Programs performed during 2002 refueling outage Number of Units: I Reactor Type & Vendor Pressurized Water Reactor/
- Installation of an additional security barriers Location: Fort Calhoun, NE Power Output (electrical): 502 Mwe
- Implementation of NRC Orders on Training, Working, and Access Authorization Source of Circulating Water Missouri River Fort Calhoun 4Q1202 Performance Summary Inspection Results Ig *., So.I I
- One low to moderate safety significant finding identified:
Ie I
- Failure to prevent radiation levels from Most Significant Inspection Findings-exceeding regulatory requirements during transport of nuclear waste (White)
-oz- ---- - - -
- Special inspection conducted to evaluate corrective actions
- Licensee corrective actions satisfactory q2 --- -i
_w Fort Calhoun 4Q1102 Performance Summary lReeotor ; Performance Indicator Saety
\\ T T=1 Results
,.lo MlgOg sm , EU 10 . 100 e n Indicators Ie Performance Indicators-Licensee adequately controlled M IN X IN l important safety activities and 1Elm_ 51i did not exceed any performance LN = I thresholds 5
ROP Action Matrix Assessment Conclusion Summary for 2002 Licensee effectively managed:
- Reactor safety U- - -R.9.latosy D.gr-ded ulMIPW U..... tbl*
- Radiation safety
- Plant security Nationwide 59 33 7 3 0 Ft Calhoun Station operated in a Region IV 13 5 2 1 0 manner that protected the health and safety of the public Additional Focus Areas
. NRC Responds As-Needed
- Mandated Licensee Actions
- Davis Besse - Significant reactor vessel head degradation identified near one of its
Inspection
- NRC Bulletin 2002-02 'Reactor Pressure Vessel Head & Vessel Penetration Nozzles"
- Security at Nuclear Power Plants
- NRC Specialist monitored FCS reactor vessel head inspection during outage Of .1 - No degradation identified
. _ AM 6
Security at Nuclear Power Plants Security at Nuclear Power Plants Nuclear Regulatory Commission: NRC created Office of Nuclear Security and Incident Response (NSIR)
- Has expanded involvement with FBI law Threat Advisory and Protective Measures enforcement and other intelligence System:
agencies
- Communicates threats potentially affecting NRC
- Communicates frequently with department of licensees Homeland Security, DOD, FAA, FEMA, and others - Corresponds to color-coded Homeland Security Presidential Directive
- Continues to work in concert with: - Identifies specific actions to be taken by NRC
- Licensees licensees for each threat level
- State and local officials Future Outlook Security at Nuclear Power Plants
- Top-to-bottom review of Security Program
- Issuance of Orderslinterim Compensatory Measures (ICM)
- Verification of licensee actions regarding ICMs - Fort Calhoun in process
- Nuclear facilities are far ahead of other Industries with regards to the level of security Contacting the NRC Contacts for Additional Information
- Regional Public Affairs Officer (301) 816-5100 (collect) - Victor Dricks
- Phone: (817) 860 - 8128
(800) 695-7403 or Allegation~nrc.gov
- General Information or questions:
- William (Bill) Maier www.nrc.gov
- Phone: (817) 860 - 8267 Select "What we do" for Public Affairs 7