MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:License-Monthly Operating Report
MONTHYEARSVPLTR 05-0022, April 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32005-05-13013 May 2005 April 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 05-0014, March 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32005-04-0808 April 2005 March 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 05-0009, February 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32005-03-11011 March 2005 February 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 05-0006, January 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32005-02-11011 February 2005 January 2005 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 05-0002, December 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32005-01-14014 January 2005 December 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0086, November 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32004-12-14014 December 2004 November 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 ML0432401182004-11-12012 November 2004 October 2004 Monthly Operating Report for Dresden Nuclear Power Station Units 2 and 3 ML0430102342004-10-15015 October 2004 September 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0062, August 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32004-09-15015 September 2004 August 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0053, July 2004 Monthly Operating Report for Dresden Nuclear Power Station Units 2 and 32004-08-13013 August 2004 July 2004 Monthly Operating Report for Dresden Nuclear Power Station Units 2 and 3 SVPLTR 04-0047, June 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32004-07-14014 July 2004 June 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0036, May 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32004-06-0808 June 2004 May 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0028, April 2004 Monthly Operating Report for Dresden, Units 2 and 32004-05-17017 May 2004 April 2004 Monthly Operating Report for Dresden, Units 2 and 3 SVPLTR 04-0016, March 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 32004-04-15015 April 2004 March 2004 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3 SVPLTR 04-0010, February 2004 Monthly Operating Report for Dresden Units 2 and 32004-03-10010 March 2004 February 2004 Monthly Operating Report for Dresden Units 2 and 3 SVPLTR 04-0006, January 2004 Monthly Operating Report for Dresden Units 2 and 32004-02-13013 February 2004 January 2004 Monthly Operating Report for Dresden Units 2 and 3 ML0402804102004-01-15015 January 2004 December 2003 Monthly Operating Report for Dresden, Units 2 and 3 ML0335702102003-12-15015 December 2003 November 2003 Monthly Operating Report for Dresden Units 2 and 3 ML0332903552003-11-14014 November 2003 October 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0329504732003-10-15015 October 2003 September 2003 Monthly Operating Report from Dresden, Units 2 & 3 ML0326711602003-09-15015 September 2003 August 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0325503492003-09-11011 September 2003 August 2003 Monthly Operating Report for Sequoyah Nuclear Plant ML0323406532003-08-15015 August 2003 July 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0320400492003-07-15015 July 2003 June 2003 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 & 3 ML0317105782003-06-13013 June 2003 May 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0314105472003-05-15015 May 2003 April 2003 Monthly Operating Report for Dresden Units 2 & 3 ML0311203352003-04-15015 April 2003 March 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0308301542003-03-14014 March 2003 February 2003 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 & 3 ML0305902412003-02-14014 February 2003 January 2003 Monthly Operating Report for Dresden, Units 2 & 3 ML0302302052003-01-15015 January 2003 December 2002 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 & 3 ML0235703202002-12-13013 December 2002 November 2002 Monthly Operating Report for Dresden, Units 2 and 3 ML0232602752002-11-15015 November 2002 October 2002 Monthly Operating Report for Dresden Units 2 & 3 ML0229605392002-10-15015 October 2002 September 2002 Monthly Operating Report for Dresden, Units 2 and 3 ML0226305532002-09-13013 September 2002 August 2002 Monthly Operating Report for Dresden Units 1 & 2 ML0223800642002-08-15015 August 2002 July 2002 Monthly Operating Report for Dresden, Units 2 and 3 ML0220500802002-07-15015 July 2002 June 2002 Monthly Operating Report for Dresden Units 2 & 3 ML0215700352002-05-15015 May 2002 April 2002 Monthly Operating Report for Dresden, Units 2 & 3 ML0211600092002-04-15015 April 2002 March 2002 Monthly Operating Report for Dresden Nuclear Power Station Units 2 and 3 ML0208702342002-03-15015 March 2002 February 2002 Monthly Operating Report for Dresden, Units 2 & 3 ML0222406102002-02-15015 February 2002 January 2002 Monthly Operating Report for Dresden Units 2 & 3 ML0236104482002-02-15015 February 2002 January 2002 Monthly Operating Report for Dresden Nuclear Power Station, Units 2 & 3 ML17252B2731976-08-0606 August 1976 Operating Status for Dresden Station Units 2 and 3 for July 1976 2005-05-13
[Table view] |
Text
ExekIn M Exelon Generation Dresden Generating Station www.exeloncorp.com Nuclear 6500 North Dresden Road Morris, IL 60450-9765 Tel 815-942-2920 October 15, 2003 RHLTR: #03-0068 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249
Subject:
Monthly Operating Report for September 2003 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports," we are submitting the September 2003 Monthly Operating Report for Dresden Nuclear Power Station (DNPS), Units 2 and 3.
Should you have any questions concerning this letter, please contact Mr. Jeff Hansen, Regulatory Assurance Manager, at (815) 416 - 2800.
Respectfully, R. J. Hovey Site Vice President Dresden Nuclear Power Station Attachment cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Dresden Nuclear Power Station
- r-60;)q
1.
ATTACHMENT DRESDEN NUCLEAR POWVER STATION, UNITS 2 AND 3 MONTHLY OPERATING REPORT FOR SEPTEMBER 2003 EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 NRC DOCKET NOS. 50-237 AND 50-249 I
TABLE OF CONTENTS
- 1. Summary of Operating Experience A. Unit 2 Monthly Operating Experience Summary B. Unit 3 Monthly Operating Experience Summary II. Operating Data Statistics A. Operating Data Report - Dresden Unit 2 B. Operating Data Report - Dresden Unit 3 III Unit Shutdowns A. Unit 2 Shutdowns B. Unit 3 Shutdowns IV. Challenges to Safety and Relief Valves 2
- 1.
SUMMARY
OF OPERATING EXPERIENCE FOR SEPTEMBER 2003 A. UNIT 2 MONTHLY OPERATING EXPERIENCE
SUMMARY
On September 7, 2003 at approximately 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, load was reduced to 64 percent electrical output to perform control rod sequence exchanges and a planned Isolation Condenser Test. The Unit was returned to full power operation on September 7, 2003, at approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />.
On September 28, 2003, at approximately 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, load was reduced to 73 percent electrical output to perform maintenance on a reactor feed pump and perform reactor feedwater level control tuning.
While at reduced load, on September 30 at approximately 2013 hours0.0233 days <br />0.559 hours <br />0.00333 weeks <br />7.659465e-4 months <br />, the Unit scrammed from a loss of one of the two operating reactor feed pumps. The Unit responded as expected to the scram and did not return to service during the remainder of the month.
With the exception of short periods for routine maintenance, surveillances and the above occurrences, Unit 2 operated at full power throughout the remainder of the reporting period.
B. UNIT 3 MONTHLY OPERATING EXPERIENCE
SUMMARY
On September 27, 2003, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, load was reduced to approximately 75 percent electrical output to perform control rod pattern adjustments. The Unit was returned to full power operation on September 29, 2003, at approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
With the exception of short periods for routine maintenance, surveillances and the above occurrence, Unit 3 operated at full power throughout the remainder of the reporting period.
3
II. OPERATING DATA STATISTICS A. Dresden Unit 2 Operating Data Report for September 2003 DOCKET NO. 050-237 DATE October 05, 2003 COMPLETED BY Eric Steckhan TELEPHONE (815) 416-2357 OPERATING STATUS I. REPORTING PERIOD: September 2003
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,957 MAXIMUM DEPENDABLE CAPACITY (MWe NET): 850 (estimated)
DESIGN ELECTRICAL RATING (MWe Net): 867 Unit Two Nlonthl Operating Status l This Month Year to Date Cumulative
- 3. Reactor Critical - Hours 717 6,548 222,946
- 4. Hours Generator On-Line 717 6,548 214,457
- 5. Unit Reserve Shutdown - Hours 0 0 4
- 6. Net Electrical Energy Generated - MWHe 613,066 5,559,766 143,569,919 4
- 11. OPERATING DATA STATISTICS B. Dresden Unit 3 Operating Data Report for September 2003 DOCKET NO. 050-249 DATE October 05, 2003 COMPLETED BY Eric Steckhan TELEPHONE (815) 416-2357 OPERATING STATUS I. REPORTING PERIOD: September 2003
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,957 MAXIMUM DEPENDABLE CAPACITY (MWe NET): 850 (estimated)
DESIGN ELECTRICAL RATING (MWe Net): 867 Unit Three Monthly Operating Status This Month Year to Date Cumulative
- 5. Reactor Critical - Hours 720 6,421 209,452
- 6. Hours Generator On-Line 720 6,354 201,430
- 9. Unit Reserve Shutdown - Hours 0 0 1
- 10. Net Electrical Energy Generated - MWHe 616,938 5,426,030 134,789,431 5
III. UNIT SHUTDOWNS A. Unit 2 Shutdowns for September 2003 NO DATE TYPE DURATION REASON (2) METHOD OF CORRECTIVE ACTIONS/
(1) (HOURS) SHUTOING DOWN COMMENTS REACTOR (3)__ _ _ _ _ _ _ _ _ _ _ _
09/30/03 F 3 A 3 B phase cable of reactor feed pump motor shunted to shielding B. Unit 3 Shutdowns for September 2003 NO None lNone DATE TYPE (1)
________.1~
DURATION (HOURS)
__________ 4 REASON (2)
METHOD OF SHUTTING DOWN REACTOR (3)
CORRECTIVE ACTIONS/
COMMENTS LEGEND:
(1) Type: (2) Reason (3) Method F - Forced A. Equipment Failure (Explain) 1. Manual S - Scheduled B. Maintenance or Test 2. Manual Trip / Scram C. Refueling 3. Automatic Trip / Scram D. Regulatory Restriction 4. Continuation E. OperatorTraining& Licensing Exam S. Other (Explain)
F. Administrative (G. Operational Error (Explain)
H. Other (Explain)
IV. Challenges to Safety and Relief Valves Unit 2 None Unit 3 None 6