MONTHYEAR05000237/LER-2024-001, Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function2025-01-27027 January 2025 Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function ML24351A1452025-01-23023 January 2025 Request to Replace Previously Submitted Documents and Withhold Information from Public Disclosure 05000249/LER-2024-002, Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications2025-01-21021 January 2025 Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications ML25017A2302025-01-17017 January 2025 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 & 3 ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums IR 05000010/20240012024-12-31031 December 2024 NRC Inspection Report No. 05000010/2024001 ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 RS-24-135, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-12-18018 December 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24352A2072024-12-17017 December 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24324A3202024-11-19019 November 2024 Letter from R. Mangum, Achp Regarding DNPS Subsequent License Renewal Environmental Review ML24323A0792024-11-15015 November 2024 Transmittal of Dresden, Units 2 and 3, Core Operating Limits Report Cycle 29 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application RS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 2025-01-27
[Table view] Category:Meeting Summary
MONTHYEARML24270A1672024-10-23023 October 2024 Scoping Meeting Summary Report ML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22158A3102022-06-0808 June 2022 Summary of May 31, 2022, Public Outreach to Discuss NRC 2021 End of Cycle Performance Assessment of Dresden Power Station, Units 2 and 3, and Quad Cities Power Station, Units 1 and 2 ML22060A0782022-03-0707 March 2022 Summary of Meeting with Constellation Energy Generation, LLC Regarding a Proposed Alternative to Extend the In-service Inspection Intervals ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21195A3942021-07-14014 July 2021 Summary of the June 29, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 & 3, and Quad Cities Nuclear Power Station, Units 1 & 2 ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20234A4422020-08-21021 August 2020 Summary of the July 29, 2020 Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18347B4932019-01-0202 January 2019 Summary of Pre-Application Meeting with Exelon Generation Co., LLC (Exelon) Forthcoming License Amendment Requests to Revise Technical Specification Requirements for Main Steam Isolation Valve Leak Rate Tests ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18220B2772018-08-0808 August 2018 Summary of Open House to Discuss the 2017 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station Units 2 and 3 ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17317A9002017-11-13013 November 2017 Summary of Teleconference on November 9, 2017, Regarding Verbal Authorization of Relief Request to Use Alternative for Dresden Nuclear Power Station, Units 2 and 3 ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17156A5712017-06-0505 June 2017 Summary of May 25, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station Units 2 and 3 ML16196A2692016-07-14014 July 2016 Summary of June 30, 2016, Public Meeting with Exelon Generation Company, LLC, to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML16085A3292016-04-0606 April 2016 Summary of March 22, 2016, Meeting with Exelon Generation Company, LLC, on Proposed License Amendment Request to Adopt ANSI 3.1-2014 Operating Training Standards ML16035A1762016-02-11011 February 2016 Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) ML16040A2182016-02-11011 February 2016 January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers ML15147A6102015-06-15015 June 2015 Summary of the April 7, 2015, Meeting with Exelon Generation Company LLC, on the License Amendment Request to Add Spent Fuel Pool Methodology and Proposed Change to Technical Specification 4.3.1 for Dresden Nuclear Power Station, Units 2 an ML15154A4592015-06-0101 June 2015 Meeting Summary with Public to Discuss the 2014 Annual Assessment Results for Braidwood and Dresden Nuclear Power Stations at the Braidwood City Hall in Braidwood, Illinois ML15051A0442015-03-23023 March 2015 Summary of 1/14/15, Preapplication Meeting with Exelon Generation Company, LLC Regarding Planned Change on Planned Change of Methodology in Updated Final Safety Analysis Report (UFSAR) for Dresden Nuclear Power Station (TAC Nos. MF5469 and ML14344A3252015-01-28028 January 2015 Summary of November 25, 2014, Meeting with Exelon Generation Company, LLC Regarding Its Application to Add a Methodology to Technical Specification 5.6.5 (TAC Nos. MF3359-MF3362) ML14254A1532014-09-22022 September 2014 8/19/2014, Summary of Closed Meeting with Exelon Generation Company, LLC, Regarding Areva Am Fuel Transition for Dresden and Quad Cities Nuclear Stations 2024-08-21
[Table view] |
Text
Christopher D. Wilson, Director License Renewal Constellation Energy Generation, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
DRESDEN, UNITS 2 AND 3, SUBSEQUENT LICENSE RENEWAL APPLICATION - PUBLIC MEETING
SUMMARY
OF PRE-SUBMITTAL MEETING (DOCKET NUMBERS: 50-237 and 50-249)
Dear Christopher Wilson:
By Subsequent License Renewal Applications|letter dated November 9, 2022]] (Agencywide Documents Access and Management System (ADAMS) ML22313A073), Constellation Energy Generation, LLC, (CEG or the applicant),
submitted a letter of intent to submit a subsequent license renewal application (SLRA) for Dresden Nuclear Power Station (DNPS or Dresden), Units 2 and 3.
On June 27, 2023, the U.S. Nuclear Regulatory Commission (NRC or the staff) held a public meeting with CEG to discuss the expected content for the safety review of the upcoming submittal of the SLRA for Dresden. The meeting notice and agenda dated June 27, 2023, is available at ML23178A033. The slides for the staff presentation are available at ML23165A024, and the slides for the applicants presentation are available at ML23145A132. A list of participants is provided as Enclosure 1. The NRC staff also held a public meeting with CEG to discuss the safety review on June 28, 2023. The public meeting summary for that meeting can be found at ML23193A005.
The NRC staff began with a brief overview of the subsequent license renewal (SLR) process.
The process consists of two tracks: the environmental review and the safety review. For an application submission date of April 2024, the final licensing decision is to be determined pending the completion of the environmental review. For the Dresden SLRA, the NRC staff will incorporate process improvements and lessons learned from previous completed SLRA review projects (e.g., Surry SLRA review).
CEG began its presentation with general plant information of Dresden Units 2 and 3. The initial license renewal application was submitted on January 3, 2003, and approved on October 28, 2004. The Dresden Unit 2 current license expiration date is December 22, 2029, and it entered its initial period of extended operation (PEO) on December 22, 2009. The Dresden Unit 3 current license expiration date is January 12, 2031, and it entered the initial PEO on January 12, 2011.
CEG stated that the format and content of the Dresden SLRA is based on NUREG-1555, Supplement 1, Rev. 1 (2013), Environmental Standard Review Plan, NUREG-1437, Rev. 1 (2013), Generic Environmental Impact Statement for License Renewal of Nuclear Plants, and August 3, 2023
C. Wilson 2
Regulatory Guide 4.2, Supplement 1, Revision 1 (2013), Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications.
CEG presented on its Severe Accident Mitigation Alternative (SAMA) analysis approach, which utilized [Nuclear Energy Institute] NEI 17-04, SAMA New and Significant Information Review, and included discussion of (a) the comprehensive consideration of 170 SAMAs and 35 required risk reduction quantifications, and (b) none of the SAMA reduced risk (probability weighted consequences of Dresden severe accidents) more than 50 percent, relative to new and significant information review. CEG noted that if approved, the subsequent PEO will extend to 2049 for Unit 2 and 2051 for Unit 3 and that there is no new and significant information, relative to the full SAMA analysis in its license renewal application (first license renewal).
The application for Dresden Units 2 and 3 is expected to have:
Clean Water Act (CWA) Section 401 Certification waiver issued by Illinois Environmental Protection Agency
No Coastal Zone Management Act (CZMA) implication because DNPS is outside the Illinois Coastal Management Program (ICMP) area
Two reasonable power replacement alternatives: (a) combination of natural gas combined cycle (NGCC), small modular reactor (SMR), and purchased power and (b)
NGCC, SMR, wind turbines with battery storage, solar panels with battery storage
Completion of the expansion of West Independent Spent Fuel Storage Installation (ISFSI) pad by 2023
No essential fish habitat (EFH) or EFH areas protected from fishing are within the vicinity of DNPS
No habitat areas of particular concern (HAPC) located within the 6-mile vicinity of DNPS CEG stated that it is utilizing lessons learned from previous CEG and industry license renewal projects for high quality application. This includes (a) its extensive and highly knowledgeable project team with significant SLR experience, (b) participation in industry working groups and meetings, (c) monitoring on-going applicant processes, (d) reviews of recent applicants RAIs, RCIs, and Supplements, and (e) an industry peer review of its SLRA.
During the information exchange portion of the meeting, the NRC staff determined that the information presented was clear and staff had no question for the applicant. Similarly, the applicant indicated that it has no further question for staff.
Constellation plans to submit the SLRA, including the ER, electronically via the NRC Electronic Information Exchange (EIE). CEG intends to utilize the Scientech eDocs portal to support NRC audit and review, for which the NRC staff will issue a portal-use letter to Constellation to disclose the conditions of use. Constellation indicated that DNPS SLRA is on track for April 17, 2024 submittal.
C. Wilson 3
During the public comment portion of the meeting, there was no public question or comment. If you have any questions, please feel free to contact me via email at Tam.Tran@nrc.gov.
Sincerely, Tam Tran, Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-237 and 50-249
Enclosure:
List of Attendees cc w/encl: ListServ Signed by Tran, Tam on 08/03/23
ML23212A989
- via email DL-1252 OFFICE NMSS/REFS/ELRB/PM NMSS/REFS/LA NAME TTran AWalker-Smith DATE 8/1/2023 8/1 /2023 OFFICE NMSS/REFS/ELRB/BC NMSS/REFS/ELRB/PM NAME TSmith TTran DATE 8/ 3 /2023 8/ 3 /2023
Enclosure List of Attendees NRC Attendees:
Andrew Siwy John Moses Leah Parks Mark Yoo Surinder Arora Tam Tran Ted Smith Constellation Attendees:
Allison Stalker Beckie Maddox Chris Wilson Dennis Flores Donald Ferraro Heather Meyer Iba Ello-Fletcher Jennifer Lytle John Hilditch Kathleen Fix Kristin Meek Lydia Dworakowski Roy Corieri Scott Kauffman Sharida Ullah Thomas McMahon Thomas McMahon Zachary Schwartz Public Attendees:
Ben Brock Daisuke Nio Don MacLeod (Jensen Hughes)
Jana Bergman (Curtiss-Wright)
Joseph Bashore (TVA)
Mary Hoganson (Enercon)
Rachel Turney-Work (Enercon)
Stacy Burgess (Enercon)
Steven Dolley (SP Global)
Yasmeen Arafeh (Southern Co.)