Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting
ML23212A989
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/03/2023
From: Tam Tran
NRC/NMSS/DREFS/ELRB
To: Wilson C
Constellation Energy Generation
References
Download: ML23212A989 (5)


Text

Christopher D. Wilson, Director License Renewal Constellation Energy Generation, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

DRESDEN, UNITS 2 AND 3, SUBSEQUENT LICENSE RENEWAL APPLICATION - PUBLIC MEETING

SUMMARY

OF PRE-SUBMITTAL MEETING (DOCKET NUMBERS: 50-237 and 50-249)

Dear Christopher Wilson:

By Subsequent License Renewal Applications|letter dated November 9, 2022]] (Agencywide Documents Access and Management System (ADAMS) ML22313A073), Constellation Energy Generation, LLC, (CEG or the applicant),

submitted a letter of intent to submit a subsequent license renewal application (SLRA) for Dresden Nuclear Power Station (DNPS or Dresden), Units 2 and 3.

On June 27, 2023, the U.S. Nuclear Regulatory Commission (NRC or the staff) held a public meeting with CEG to discuss the expected content for the safety review of the upcoming submittal of the SLRA for Dresden. The meeting notice and agenda dated June 27, 2023, is available at ML23178A033. The slides for the staff presentation are available at ML23165A024, and the slides for the applicants presentation are available at ML23145A132. A list of participants is provided as Enclosure 1. The NRC staff also held a public meeting with CEG to discuss the safety review on June 28, 2023. The public meeting summary for that meeting can be found at ML23193A005.

The NRC staff began with a brief overview of the subsequent license renewal (SLR) process.

The process consists of two tracks: the environmental review and the safety review. For an application submission date of April 2024, the final licensing decision is to be determined pending the completion of the environmental review. For the Dresden SLRA, the NRC staff will incorporate process improvements and lessons learned from previous completed SLRA review projects (e.g., Surry SLRA review).

CEG began its presentation with general plant information of Dresden Units 2 and 3. The initial license renewal application was submitted on January 3, 2003, and approved on October 28, 2004. The Dresden Unit 2 current license expiration date is December 22, 2029, and it entered its initial period of extended operation (PEO) on December 22, 2009. The Dresden Unit 3 current license expiration date is January 12, 2031, and it entered the initial PEO on January 12, 2011.

CEG stated that the format and content of the Dresden SLRA is based on NUREG-1555, Supplement 1, Rev. 1 (2013), Environmental Standard Review Plan, NUREG-1437, Rev. 1 (2013), Generic Environmental Impact Statement for License Renewal of Nuclear Plants, and August 3, 2023

C. Wilson 2

Regulatory Guide 4.2, Supplement 1, Revision 1 (2013), Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications.

CEG presented on its Severe Accident Mitigation Alternative (SAMA) analysis approach, which utilized [Nuclear Energy Institute] NEI 17-04, SAMA New and Significant Information Review, and included discussion of (a) the comprehensive consideration of 170 SAMAs and 35 required risk reduction quantifications, and (b) none of the SAMA reduced risk (probability weighted consequences of Dresden severe accidents) more than 50 percent, relative to new and significant information review. CEG noted that if approved, the subsequent PEO will extend to 2049 for Unit 2 and 2051 for Unit 3 and that there is no new and significant information, relative to the full SAMA analysis in its license renewal application (first license renewal).

The application for Dresden Units 2 and 3 is expected to have:

Clean Water Act (CWA) Section 401 Certification waiver issued by Illinois Environmental Protection Agency

No Coastal Zone Management Act (CZMA) implication because DNPS is outside the Illinois Coastal Management Program (ICMP) area

Two reasonable power replacement alternatives: (a) combination of natural gas combined cycle (NGCC), small modular reactor (SMR), and purchased power and (b)

NGCC, SMR, wind turbines with battery storage, solar panels with battery storage

Completion of the expansion of West Independent Spent Fuel Storage Installation (ISFSI) pad by 2023

No essential fish habitat (EFH) or EFH areas protected from fishing are within the vicinity of DNPS

No habitat areas of particular concern (HAPC) located within the 6-mile vicinity of DNPS CEG stated that it is utilizing lessons learned from previous CEG and industry license renewal projects for high quality application. This includes (a) its extensive and highly knowledgeable project team with significant SLR experience, (b) participation in industry working groups and meetings, (c) monitoring on-going applicant processes, (d) reviews of recent applicants RAIs, RCIs, and Supplements, and (e) an industry peer review of its SLRA.

During the information exchange portion of the meeting, the NRC staff determined that the information presented was clear and staff had no question for the applicant. Similarly, the applicant indicated that it has no further question for staff.

Constellation plans to submit the SLRA, including the ER, electronically via the NRC Electronic Information Exchange (EIE). CEG intends to utilize the Scientech eDocs portal to support NRC audit and review, for which the NRC staff will issue a portal-use letter to Constellation to disclose the conditions of use. Constellation indicated that DNPS SLRA is on track for April 17, 2024 submittal.

C. Wilson 3

During the public comment portion of the meeting, there was no public question or comment. If you have any questions, please feel free to contact me via email at Tam.Tran@nrc.gov.

Sincerely, Tam Tran, Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-237 and 50-249

Enclosure:

List of Attendees cc w/encl: ListServ Signed by Tran, Tam on 08/03/23

ML23212A989

  • via email DL-1252 OFFICE NMSS/REFS/ELRB/PM NMSS/REFS/LA NAME TTran AWalker-Smith DATE 8/1/2023 8/1 /2023 OFFICE NMSS/REFS/ELRB/BC NMSS/REFS/ELRB/PM NAME TSmith TTran DATE 8/ 3 /2023 8/ 3 /2023

Enclosure List of Attendees NRC Attendees:

Andrew Siwy John Moses Leah Parks Mark Yoo Surinder Arora Tam Tran Ted Smith Constellation Attendees:

Allison Stalker Beckie Maddox Chris Wilson Dennis Flores Donald Ferraro Heather Meyer Iba Ello-Fletcher Jennifer Lytle John Hilditch Kathleen Fix Kristin Meek Lydia Dworakowski Roy Corieri Scott Kauffman Sharida Ullah Thomas McMahon Thomas McMahon Zachary Schwartz Public Attendees:

Ben Brock Daisuke Nio Don MacLeod (Jensen Hughes)

Jana Bergman (Curtiss-Wright)

Joseph Bashore (TVA)

Mary Hoganson (Enercon)

Rachel Turney-Work (Enercon)

Stacy Burgess (Enercon)

Steven Dolley (SP Global)

Yasmeen Arafeh (Southern Co.)