SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000237/2023501 AND 05000249/2023501
Dear David Rhoades:
On March 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with P. Boyle, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness & Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000237 and 05000249
License Numbers:
Report Numbers:
05000237/2023501 and 05000249/2023501
Enterprise Identifier:
I-2023-501-0002
Licensee:
Constellation Energy Generation, LLC
Facility:
Dresden Nuclear Power Station, Units 2 and 3
Location:
Morris, IL
Inspection Dates:
March 27, 2023 to March 30, 2023
Inspectors:
D. Chyu, Project Engineer
G. Hansen, Sr. Emergency Preparedness Inspector
J. Kutlesa, Emergency Preparedness Inspector
T. McGowan, Resident Inspector
Approved By:
Steven K. Orth, Chief
Security, Emergency Preparedness & Incident
Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Dresden Nuclear Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise on March 28, 2023. The exercise scenario simulated an event at the Dresden Nuclear Power Station that initiated with the declaration and notification of an Unusual Event in response to an unplanned drop in spent fuel pool (SFP) level and an unplanned rise in area radiation monitor (ARM) readings in the refueling floor area. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of an Alert, a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 23,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===
- (1) January 1, 2022 through December 31, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) January 1, 2022 through December 31, 2022 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) January 1, 2022 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 30, 2023, the inspectors presented the emergency preparedness biennial exercise inspection results to P. Boyle, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Rollup IR for 3Q2021 EP Integrated Drill Facilities
10/06/2021
21 Medical HP Drill Hospital Response
2/16/2021
Dresden Off-Year Exercise EOF Objective Failure
09/28/2022
Dresden Off-Year Exercise DEP Failure SCR
09/28/2022
EP Off-Year Exercise TSC DC Failures and Sat w Comment
10/07/2022
EP Off-Year Exercise SCR DC Failures
10/07/2022
EP Off-Year Exercise OSC DC Failures
10/07/2022
3Q2022 Integrated EP Drill Rollup Facilities
10/14/2022
TSC Dresden 2023 Pre Ex TSC LL
03/03/2023
03/03/2023
Overall Fac Dresden 2023 Pre Ex Facility Scenario Issues
03/03/2023
Corrective Action
Documents
Dresden 2023 Pre Ex Lessons Learned
03/06/2023
Miscellaneous
Dresden Nuclear Power Station 2023 NRC Graded Exercise
Manual
01/26/2023
Addendum 3
Emergency Action Levels for Dresden Station
Dose Assessment
On Shift Dose Assessment
Emergency Classification and Protective Action
Recommendations
Drills and Exercise Program
OSC Activation and Operation
EOF Activation and Operation
JIC Activation and Operation
Notifications
Drill and Exercise Evaluation
EP-AA_112-100
Control Room Operations
EP-AA_112-200
TSC Activation and Operation
Dresden Station Radiological Emergency Plan
Procedures
Midwest Region Off-Site Notifications
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Dresden Nuclear Power Station 2023 NRC Graded Exercise
Manual
01/26/2023
Alert Notification System (ANS) Reliability Performance
Indicator Data
01/01/2022 -
2/31/2022
Emergency Response Organization (ERO) Drill Participation
Performance Indicator Data
01/01/2022 -
2/31/2022
71151
Miscellaneous
Drill / Exercise Performance (DEP) Performance Indicator
Data
01/01/2022 -
2/31/2022