April 2002 Monthly Operating Report for Dresden, Units 2 & 3
ML021570035
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/15/2002
From: Hovey R
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RHLTR: #02-0031
Download: ML021570035 (8)


Text

ExeI n Exelon Generation Dresden Generating Station 6500 North Dresden Road Morris, IL 60450-9765 Tel 815-942-2920 www.exeloncorp.com Nuclear May 15, 2002 RHLTR: #02-0031 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249

Subject:

Monthly Operating Report for April 2002 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports," we are submitting the April 2002 - Monthly Operating Report for Dresden Nuclear Power Station, Units 2 and 3.

Should you have any questions concerning this letter, please contact Mr. Bob Rybak, Regulatory Assurance Manager, at (815) 416 - 2800.

Respectfully, 1Q41 R. J. Hovey Site Vice President Dresden Nuclear Power Station Attachment cc:

Regional Administrator-NRC Region III NRC Senior Resident Inspector - Dresden Nuclear Power Station

ATTACHMENT DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 MONTHLY OPERATING REPORT FOR APRIL 2002 EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 NRC DOCKET NOS. 50-237 AND 50-249 I

TABLE OF CONTENTS I.

Introduction II.

Summary of Operating Experience A.

Unit 2 Monthly Operating Experience Summary B.

Unit 3 Monthly Operating Experience Summary III.

Operating Data Statistics A.

Operating Data Report - Dresden Unit 2 B.

Operating Data Report - Dresden Unit 3 IV.

Unit Shutdowns A.

Unit 2 Shutdowns B.

Unit 3 Shutdowns V.

Amendments to Facility Licenses or Technical Specifications VI.

Unique Reporting Requirements A.

Main Steam Relief and/or Safety Valve Operations 2

I.

Introduction Dresden Nuclear Power Station (DNPS) is a two reactor generating facility owned and operated by the Exelon Generation Company, LLC. DNPS is located at the confluence of the Kankakee and Des Plaines Rivers, in Grundy County, near Morris, Illinois.

DNPS Unit 2 is a General Electric Boiling Water Reactor. DNPS Unit 2 is licensed at 2957 megawatts thermal. The gross electrical output is 912 megawatts, with design net electrical output ratings of 864 megawatts. The commercial service date for Unit 2 is August 11, 1970.

DNPS Unit 3 is a General Electric Boiling Water Reactor. DNPS Unit 3 is licensed at 2527 megawatts thermal. The gross electrical output of Unit 3 is 834 megawatts, with design net electrical output ratings of 795 megawatts. The commercial service date for Unit 3 is October 30, 1971.

Waste heat is rejected to a man-made cooling lake using the Kankakee River for make up and the Illinois River for blowdown.

The Architect-Engineer for DNPS Units 2 and 3 was Sargent and Lundy of Chicago, Illinois.

3

II.

SUMMARY

OF OPERATING EXPERIENCE FOR APRIL 2002 A.

UNIT 2 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 2 operated throughout the periods at full power except for short periods for maintenance and surveillances.

B.

UNIT 3 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 3 operated throughout the periods at full power except for short periods for maintenance and surveillances.

4

III.

OPERATING DATA STATISTICS A. Dresden Unit 2 Operating Data Report for April 2002 DOCKET NO.

DATE COMPLETED BY TELEPHONE

1.
2.
3.

4.

050-237 May 02, 2002 Don Hamilton (815) 416-3585 OPERATING STATUS REPORTING PERIOD: April 2002 CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,957 MAXIMUM DEPENDABLE CAPACITY (MWe NET): 850 (estimated)

DESIGN ELECTRICAL RATING (MWe Net): 864 POWER LEVEL TO WHICH RESTRICTED (MWe Net): No Restrictions REASONS FOR RESTRICTIONS (IF ANY): See Section II.A of this report.

Unit Two Monthly Operating Status This Month Year to Date Cumulative

5. Hours in Period 719 2,879 278,039
6. Reactor Critical - Hours 719 2,879 210,517
7. Reactor Reserve Shutdown - Hours 0

0 0

8. Hours Generator On-Line 719 2,879 202,028
9. Unit Reserve Shutdown - Hours 0

0 4

10.Thermal Energy Generated - MWHt Gross 2,045,784 8,099,917 437,484,581

11. Electrical Energy Generated - MWHe Gross 653,319 2,600,070 140,279,578
12. Electrical Energy Generated - MWHe Net 620,683 2,479,852 132,962,533
13. Reactor Service Factor - Percent 100.0%

100.0%

75.7%

14. Reactor Availability Factor - Percent 100.0%

100.0%

75.7%

15. Generator Service Factor - Percent 100.0%

100.0%

72.7%

16. Generator Availability Factor - Percent 100.0%

100.0%

72.7%

17. Capacity Factor- (Using MDC Net) Percent 101.6%

101.3%

56.3%

18. Capacity Factor- (Using DER Net) Percent 99.9%

99.7%

55.3%

5

III.

OPERATING DATA STATISTICS B. Dresden Unit 3 Operating Data Report for April 2002 DOCKET NO.

050-249 DATE May 02, 2002 COMPLETED BY Don Hamilton TELEPHONE (815) 416-3585 OPERATING STATUS

1.

REPORTING PERIOD: April 2002

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net): 773 DESIGN ELECTRICAL RATING (MWe Net): 795

3.

POWER LEVEL TO WHICH RESTRICTED: No Restrictions

4.

REASONS FOR RESTRICTIONS (IF ANY): See Section II.B of this report.

Unit Three Monthly Operating Status This Month Year to Cumulative Date

5. Hours in Period 719 2,879 267,359
6. Reactor Critical - Hours 719 2,701 197,719
7. Reactor Reserve Shutdown - Hours 0

0 0

8. Hours Generator On-Line 719 2,682 189,843
9. Unit Reserve Shutdown - Hours 0

0 1

10.Thermal Energy Generated - MWHt Gross 1,814,995 6,726,470 410,902,817

11. Electrical Energy Generated - MWHe Gross 585,859 2,187,211 131,888,653
12. Electrical Energy Generated - MWHe Net 565,678 2,112,628 125,415,163
13. Reactor Service Factor - Percent 100.0%

93.8%

74.0%

14. Reactor Availability Factor - Percent 100.0%

93.8%

74.0%

15. Generator Service Factor-Percent 100.0%

93.2%

71.0%

16. Generator Availability Factor-Percent 100.0%

93.2%

71.0%

17. Capacity Factor- (Using MDC Net) Percent 101.8%

94.9%

60.7%

18. Capacity Factor - (Using DER Net) Percent 99.0%

92.3%

59.0%

6

IV. UNIT SHUTDOWNS A. Unit 2 Shutdowns for April 2002 NO DATE TYPE DURATION REASON (2)

METHOD OF CORRECTIVE ACTIONS/

DATE(HOURS)

SHUTTING DOWN COMMENTS REACTOR(3)

None B. Unit 3 Shutdowns for April 2002 NO DATE TYPE DURATION REASON (2)

METHOD OF CORRECTIVE ACTIONS/

(1)

(HOURS)

SHUTTING DOWN COMMENTS REACTOR(3)

None LEGEND:

(1) Type:

(2) Reason (3) Method F - Forced A. Equipment Failure (Explain)

1. Manual S - Scheduled B. Maintenance or Test
2. Manual Scram C. Refueling
3. Automatic Scram D. Regulatory Restriction
4. Other (Explain)

E. Operator Training & Licensing Exam

5. Load Reduction F. Administrative G. Operational Error H. Other (Explain)

V. Amendments to Facility Licenses or Technical Specifications There were no license amendments implemented for Units 2 and 3 during the month of April.

VI. Unique Reportin2 Requirements A. Main Steam Relief and/or Safety Valve Operations Unit 2 - None Unit 3 - None 7