April 25, 2023 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNIT 2; AND QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AND 2 - ISSUANCE OF AMENDMENTS TO ADOPT TSTF-306, REVISION 2, ADD ACTION TO LCO 3.3.6.1 TO GIVE OPTION TO ISOLATE THE PENETRATION (EPID L-2022-LLA-0143)
Dear Mr. Rhoades:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed amendments (listed below) in response to the Constellation Energy Generation, LLC application dated October 3, 2022 (Agencywide Documents Access and Management System Accession No. ML22276A220).
Enclosed amendments:
- 1.
Amendment No. 249 to Facility Operating License No. NPF-62 for Clinton Power Station, Unit No. 1;
- 2.
Amendment No. 280 to Renewed Facility Operating License No. DPR-19 and Amendment No. 273 to Renewed Facility Operating License No. DPR-25 for Dresden Nuclear Power Station, Units 2 and 3, respectively;
- 3.
Amendment No. 259 to Renewed Facility Operating License No. NPF-11 and Amendment No. 244 to Renewed Facility Operating License No. NPF-18 for LaSalle County Station, Units 1 and 2, respectively;
- 4.
Amendment No. 193 to Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2; and
- 5.
Amendment No. 295 to Renewed Facility Operating License No. DPR-29 and Amendment No. 291 to Renewed Facility Operating License No. DPR-30 for Quad Cities Nuclear Power Station, Units 1 and 2, respectively.
The amendments revise the technical specifications for each facility based on Technical Specification Task Force (TSTF) traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (ML003725864).
A copy of the NRC staffs Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.50-461, 50-237, 50-249, 50-373, 50-374, 50-410, 50-254, and 50-265
Enclosures:
- 1. Amendment No. 249 to NPF-62
- 2. Amendment No. 280 to DPR-19
- 3. Amendment No. 273 to DPR-25
- 4. Amendment No. 259 to NPF-11
- 5. Amendment No. 244 to NPF-18
- 6. Amendment No. 193 to NPF-69
- 7. Amendment No. 295 to DPR-29
- 8. Amendment No. 291 to DPR-30
- 9. Safety Evaluation cc: Listserv
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-461 CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 249 License No. NPF-62
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 249, are hereby incorporated into this license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:23:37 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 249 FACILITY OPERATING LICENSE NO. NPF-62 CLINTON POWER STATION, UNIT NO. 1 DOCKET NO. 50-461 Replace the following pages of the Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License NPF-62 License NPF-62 Page 3 Page 3 TSs TSs 3.3-49 3.3-49 Amendment No. 249 (4)
Constellation Energy Generation, LLC, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and (7)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level Constellation Energy Generation, LLC is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 249, are hereby incorporated into this license.
Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Primary Containment and Drywell Isolation Instrumentation 3.3.6.1 CLINTON 3.3-49 Amendment No. 249249 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment and Drywell Isolation Instrumentation LCO 3.3.6.1 The primary containment and drywell isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
NOTES------------------------------------
1.
Penetration flow paths may be unisolated intermittently under administrative controls.
2.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME
NOTE----------
Only applicable to Main Steam Line (MSL) isolation Functions.
A.
One or more Functions with one channel inoperable.
A.1 Place one channel in affected Function in trip.
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> OR In accordance with the Risk Informed Completion Time Program
NOTE----------
Only applicable to MSL isolation Functions.
B.
One or more Functions with two channels inoperable.
B.1 Place one channel in affected Function in trip.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> OR In accordance with the Risk Informed Completion Time Program
NOTE----------
Only applicable to MSL isolation Functions.
C.
One or more Functions with three or more channels inoperable.
C.1 Restore two channels in affected Function to OPERABLE status.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (continued)
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-237 DRESDEN NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 280 Renewed License No. DPR-19
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-19 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:26:53 -04'00'
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-249 DRESDEN NUCLEAR POWER STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 273 Renewed License No. DPR-25
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-25 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 273, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:27:35 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 280 AND 273 RENEWED FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-237 AND 50-249 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License DPR-19 License DPR-19 Page 3 Page 3 License DPR-25 License DPR-25 Page 4 Page 4 TSs TSs 3.3.6.1-1 3.3.6.1-1 Renewed License No. DPR-19 Amendment No. 280 (2)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear materials as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2957 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Operation in the coastdown mode is permitted to 40% power.
Renewed License No. DPR-25 Amendment No. 273
- f.
Surveillance Requirement 4.9.A.10 - Diesel Storage Tank Cleaning (Unit 3 and Unit 2/3 only)
Each of the above Surveillance Requirements shall be successfully demonstrated prior to entering into MODE 2 on the first plant startup following the fourteenth refueling outage (D3R14).
- 3.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A.
Maximum Power Level The licensee is authorized to operate the facility at steady state power levels not in excess of 2957 megawatts (thermal), except that the licensee shall not operate the facility at power levels in excess of five (5) megawatts (thermal), until satisfactory completion of modifications and final testing of the station output transformer, the auto-depressurization interlock, and the feedwater system, as described in the licensees telegrams; dated February 26, 1971, have been verified in writing by the Commission.
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 273, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
Reports The licensee shall make certain reports in accordance with the requirements of the Technical Specifications.
D.
Records The licensee shall keep facility operating records in accordance with the requirements of the Technical Specifications.
E.
Restrictions Operation in the coastdown mode is permitted to 40% power
Primary Containment Isolation Instrumentation 3.3.6.1 Dresden 2 and 3 3.3.6.1-1 Amendment No. 280/273 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
NOTES ------------------------------------
1.
Penetration flow paths may be unisolated intermittently under administrative controls.
2.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required channels inoperable.
A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Functions 1.a, 2.a, 2.b, 5.b, and 6.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 1.a, 2.a, 2.b, 5.b, and 6.b B.
One or more automatic Functions with isolation capability not maintained.
B.1 Restore isolation capability.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (continued)
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-373 LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 259 Renewed License No. NPF-11
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-11 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 259, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:28:18 -04'00'
CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-374 LASALLE COUNTY STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 244 Renewed License No. NPF-18
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-18 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 244, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:29:00 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 259 AND 244 RENEWED FACILITY OPERATING LICENSE NOS. NPF-11 AND NPF-18 LASALLE COUNTY STATION, UNITS 1 AND 2 DOCKET NOS. 50-373 AND 50-374 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License NPF-11 License NPF-11 Page 3 Page 3 License NPF-18 License NPF-18 Page 3 Page 3 TSs TSs 3.3.6.1-1 3.3.6.1-1
Renewed License No. NPF-11 Amendment No. 259 (3)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Constellation Energy Generation, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 259, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
DELETED (4)
DELETED (5)
DELETED Am. 198 09/16/10 Am. 194 08/28/09 Am. 194 08/28/09 Am. 194 08/28/09 Am. 259 04/25/23
Renewed License No. NPF-18 Amendment No. 244 (2)
Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal). Items in shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 244, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Am. 185 09/16/10 Am. 244 04/25/23
Primary Containment Isolation Instrumentation 3.3.6.1 LaSalle 1 and 2 3.3.6.1-1 Amendment No. 259/244 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
NOTES -----------------------------------
1.
Penetration flow paths may be unisolated intermittently under administrative controls.
2.
Separate Condition entry is allowed for each channel.
3.
For Function 1.e, when automatic isolation capability is inoperable for required Reactor Building Ventilation System corrective maintenance, filter changes, damper cycling, or required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4.
For Function 1.e, when automatic isolation capability is inoperable due to loss of reactor building ventilation or for performance of SR 3.6.4.1.3 or SR 3.6.4.1.4, entry into associated Conditions and Required Action may be delayed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more channels inoperable.
A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or in accordance with the Risk Informed Completion Time Program for Functions 2.b, 2.f, and 5.a (continued)
NINE MILE POINT NUCLEAR STATION, LLC LONG ISLAND LIGHTING COMPANY CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 193 Renewed License No. NPF-69
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-69 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 193, are hereby incorporated into this license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:29:52 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 193 RENEWED FACILITY OPERATING LICENSE NO. NPF-69 NINE MILE POINT NUCLEAR STATION, UNIT 2 DOCKET NO. 50-410 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License NPF-69 License NPF-69 Page 4 Page 4 TSs TSs 3.3.6.1-1 3.3.6.1-1 Renewed License No. NPF-69 Amendment 117 through 192, 193 (1)
Maximum Power Level Constellation Energy Generation, LLC is authorized to operate the facility at reactor core power levels not in excess of 3988 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 193, are hereby incorporated into this license. Constellation Energy Generation, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Fuel Storage and Handling (Section 9.1, SSER 4)*
- a. Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.
- b. When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility.
- c. The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and approved storage rack locations.
- d. The New Fuel Storage Vault shall have no more than ten fresh fuel assemblies uncovered at any one time.
(4)
Turbine System Maintenance Program (Section 3.5.1.3.10 SER)
The operating licensee shall submit for NRC approval by October 31, 1989, a turbine system maintenance program based on the manufacturers calculations of missile generation probabilities.
(Submitted by NMPC letter dated October 30, 1989 from C.D. Terry and approved by NRC letter dated March 15, 1990 from Robert Martin to Mr. Lawrence Burkhardt, III).
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
Primary Containment Isolation Instrumentation 3.3.6.1 NMP2 3.3.6.1-1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more channels inoperable.
A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Functions 2.b, 5.b, 5.c OR
NOTE---------
Not applicable when trip capability is not maintained.
In accordance with the Risk Informed Completion Time Program AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.b, 5.b, 5.c (continued)
Amendment 186, 193
CONSTELLATION ENERGY GENERATION, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 295 Renewed License No. DPR-29
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-29 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 295, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:30:34 -04'00'
CONSTELLATION ENERGY GENERATION, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 291 Renewed License No. DPR-30
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Constellation Energy Generation, LLC dated October 3, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-30 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 291, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION V. Sreenivas, Acting Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: April 25, 2023 Digitally signed by Venkataiah Sreenivas Date: 2023.04.25 16:31:16 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NOS. 295 AND 291 RENEWED FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License DPR-29 License DPR-29 Page 4 Page 4 License DPR-30 License DPR-30 Page 4 Page 4 TSs TSs 3.3.6.1-1 3.3.6.1-1 Renewed License No. DPR-29 Amendment No. 295 B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 295, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
D.
Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.
Constellation Energy Generation, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The CSP was approved by License Amendment No. 249 as modified by License Amendment No. 259.
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-30 Amendment No. 291 B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 291, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
D.
Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.
Constellation Energy Generation, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The CSP was approved by License Amendment No. 244 and modified by License Amendment No. 254.
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Primary Containment Isolation Instrumentation 3.3.6.1 Quad Cities 1 and 2 3.3.6.1-1 Amendment No. 295/291 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6.1-1.
ACTIONS
NOTES ------------------------------------
1.
Penetration flow paths may be unisolated under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required channels inoperable.
A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Functions 1.a, 2.a, 2.b, 3.d, 5.b, and 6.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 1.a, 2.a, 2.b, 3.d, 5.b, and 6.b B.
One or more automatic Functions with isolation capability not maintained.
B.1 Restore isolation capability.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (continued)
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 249 TO FACILITY OPERATING LICENSE NO. NPF-62 AMENDMENT NO. 280 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-19 AMENDMENT NO. 273 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-25 AMENDMENT NO. 259 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-11 AMENDMENT NO. 244 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-18 AMENDMENT NO. 193 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-69 AMENDMENT NO. 295 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29 AMENDMENT NO. 291 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30 CLINTON POWER STATION, UNIT NO. 1 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 LASALLE COUNTY STATION, UNITS 1 AND 2 NINE MILE POINT NUCLEAR STATION, UNIT 2 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-461, 50-237, 50-249, 50-373, 50-374, 50-410, 50-254, AND 50-265
1.0 INTRODUCTION
By application dated October 3, 2022 (Agencywide Documents Access and Management System Accession No. ML22276A220), Constellation Energy Generation, LLC (CEG, the licensee) submitted a license amendment request (LAR) for Clinton Power Station (Clinton),
Unit No. 1; Dresden Nuclear Power Station (Dresden), Units 2 and 3; LaSalle County Station (LaSalle), Units 1 and 2; Nine Mile Point Nuclear Station, Unit 2 (NMP-2); and Quad Cities Nuclear Power Station (Quad Cities), Units 1 and 2 (collectively, the facilities). The proposed amendments would revise the technical specifications (TS) for each facility based on Technical Specification Task Force (TSTF) traveler TSTF-306, Revision 2, Add Action to [Limiting Condition for Operation] LCO 3.3.6.1 to Give Option to Isolate the Penetration, dated June 20, 2000 (ML003725864). The U.S. Nuclear Regulatory Commission (NRC) approved TSTF-306, Revision 2, on July 13, 2000 (ML003734705).
2.0 REGULATORY EVALUATION
2.1 System Descriptions The primary containment isolation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs). Primary containment isolation within the time limits specified for those isolation valves designed to close automatically ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analysis for a DBA.
2.2 Licensees Proposed Changes The licensee proposes the following changes to:
Clinton TS 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, Dresden TS 3.3.6.1, Primary Containment Isolation Instrumentation, LaSalle TS 3.3.6.1, Primary Containment Isolation Instrumentation.
NMP-2 TS 3.3.6.1, Primary Containment Isolation Instrumentation, and Quad Cities TS 3.3.6.1, Primary Containment Isolation Instrumentation.
The proposed change adds the following ACTIONS Note to the respective LCOs:
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
For Clinton, Dresden, NMP-2, and Quad Cities, the existing ACTIONS Note 1 will be renumbered to Note 2, and the NOTE heading will be revised to NOTES. For LaSalle, the existing ACTIONS Note 1 will be renumbered to Note 2, and the existing Notes 1, 2, and 3 will be renumbered to Notes 2, 3, and 4, respectively.
The licensee also proposed corresponding changes to the TS Bases for the facilities using language consistent with that used in TSTF-306.
2.3 Additional Proposed TS Changes In addition to the changes proposed consistent with the traveler discussed in Section 2.2, the licensee proposed the following variations.
2.3.1 Scope Variation TSTF-306, Revision 2, revises the Standard Technical Specifications (STS) associated with Boiling-Water Reactor (BWR) plant designs. The two proposed TS changes in TSTF-306 are:
(1) Adding an ACTIONS note allowing intermittent opening, under administrative control, of penetration flow paths that are isolated. This Note addition is applicable to:
NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plant, Volume 1, Specifications, and Volume 2, Bases, Revision 5, September 2021 (ML21272A357 and ML21272A358, respectively), and NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plant, Volume 1, Specifications, and Volume 2, Bases, Revision 5, September 2021 (ML21271A582 and ML21271A596, respectively).
(2) Separating the traversing in-core probe (TIP) system isolation function from the Primary Containment Isolation function with a Required Action to isolate the penetration within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> rather than immediately initiating a unit shutdown. This TIP System consideration is only applicable to NUREG-1433 and not applicable to NUREG-1434 since the TIP system for a BWR/6 is totally contained within the primary containment.
NUREG-1433 is based on the BWR/4 plant design, but is also representative of, with respect to the primary containment isolation instrumentation, the BWR/2, BWR/3, and BWR/5 designs.
NUREG-1434 is based on the BWR/6 plant design, but is also representative of, with respect to the primary containment isolation instrumentation, the BWR/5 design.
The licensee is only proposing the adoption of the first change outlined in TSTF-306 (Add ACTIONS Note) and described in Section 2.2 above.
2.3.2 Editorial Variation The licensee also indicated that the name of the Clinton TS 3.3.6.1 differs from the name of the same TS in the STSs on which TSTF-306 was based. Specifically, the Clinton TS 3.3.6.1 is titled Primary Containment and Drywell Isolation Instrumentation, whereas STS 3.3.6.1 uses Primary Containment Isolation Instrumentation.
2.4 Regulatory Requirements and Guidance The categories of items required to be in the TS are provided in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(c). As required by 10 CFR 50.36(c)(2)(i), the TSs will include LCOs, which are the lowest functional capability or performance levels of equipment required for safe operation of the facility. Per 10 CFR 50.36(c)(2)(i), when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met.
Paragraph 50.36(a)(1) of 10 CFR states, in part, that a summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application, but shall not become part of the TS.
Paragraph 50.36(c)(3) of 10 CFR states that TS will contain surveillance requirements (SR) which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
Traveler TSTF-306, Revision 2, was submitted to the NRC staff for review on June 20, 2000.
Approval of TSTF-306, Revision 2, was documented in the meeting summary for the joint NRC/TSTF meeting on July 13, 2000 (ML003734705).
3.1 Evaluation of TS Changes to Adopt TSTF-306 Prior to the approval of TSTF-306, Revision 2, STS 3.3.6.1, Primary Containment Isolation Instrumentation, would not allow intermittent opening, under administrative controls, of penetration flow paths isolated due to inoperable primary containment isolation instrumentation.
TSTF-306, Revision 2, revised STS 3.3.6.1 and its associated Bases to be consistent with requirements of STS 3.6.1.3, Primary Containment Isolation Valves, with respect to administratively opening isolated penetration flow paths.
The ACTIONS in TS 3.3.6.1 for each of the CEG facilities would be modified by the addition of an ACTION Note allowing intermittent opening, under administrative control, of penetrations that are isolated to comply with ACTIONS, SRs, or operating conditions. These controls consist of stationing a dedicated operator at the controls of the valve who is in continuous communication with the control room. This would allow the penetration to be rapidly isolated when a need for primary containment isolation is indicated.
The primary containment isolation instrumentation serves as a support system for the PCIVs.
The NRC staff confirmed that TS 3.6.1.3 for the various facilities currently contains a similar ACTIONS Note that allows penetrations isolated due to ACTIONS, SRs, and operating conditions to be intermittently opened under administrative control. The accident consequences are not affected by the allowance of isolated penetrations to be intermittently opened under administrative control. The addition of the ACTION Note is acceptable because the ACTIONS for inoperability of the instrumentation need not be more restrictive than those for the inoperability of the function it supports.
3.2 Additional Proposed TS Changes 3.2.1 Scope Variation As discussed in Section 2.3.1 of this evaluation, the licensee is only proposing the adoption of the first portion (add an ACTIONS Note) of the changes outlined in TSTF-306. The NRC staff finds that adding only the ACTION Note is acceptable because it does not substantively alter TS requirements or the applicability of TSTF-306 to the CEG facilities.
3.3.2 Editorial Variation As discussed in Section 2.3.2 of this evaluation, the licensee also indicated that the name of the Clinton TS 3.3.6.1 differs from the name of the same TS in the STSs on which TSTF-306 was based. The NRC staff finds that the different TS title is acceptable because it does not substantively alter TS requirements or applicability of TSTF-306 to Clinton.
3.2 Technical Conclusion The NRC staff has reviewed the request by the licensee to revise the TS for the CEG facilities.
The proposed changes are consistent with the STS and TSTF-306, Revision 2. The NRC staff finds the proposed changes acceptable because there is reasonable assurance that the overall safe operation of the facilities is not impacted by the incorporation of the TSTF.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Illinois and New York State officials were notified of the proposed issuance of the amendments on March 21, 2023. The State officials had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change requirements with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration in the Federal Register (87 FR 73339; November 29, 2022),
and there has been no public comment on such finding. In addition, the amendments make editorial, corrective, or other minor revisions to the TSs. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: D. Scully, NRR Date: April 25, 2023
SUBJECT:
CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNIT 2; AND QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AND 2 - ISSUANCE OF AMENDMENTS TO ADOPT TSTF-306, REVISION 2, ADD ACTION TO LCO 3.3.6.1 TO GIVE OPTION TO ISOLATE THE PENETRATION (EPID L-2022-LLA-0143)
DATED APRIL 25, 2023 DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1 Resource RidsNrrDorlLpl3 Resource RidsRgn1MailCenter Resource RidsRgn3MailCenter Resource RidsNrrLASLent Resource RidsNrrLASRohrer Resource RidsNrrLAKEntz Resource RidsNrrLAKZeleznock Resource RidsAcrs_MailCTR Resource RidsNrrPMExelon Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle Resource RidsNrrPMNineMilePoint Resource RidsNrrPMQuadCities Resource RidsNrrDssStsb Resource RidsNrrDssScpb Resource DScully, NRR TSweat, NRR Accession No.: ML23081A038
- via memo OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/STSB/BC NAME SWall SRohrer VCusumano DATE 03/21/2023 03/23/2023 03/31/2023 OFFICE NRR/DSS/SCPB/BC*
NAME BWittick ELicon VSreenivas DATE 03/17/2023 04/24/2023 04/25/2023 OFFICE NRR/DORL/LPL3/PM NAME SWall DATE 04/25/2023 OFFICIAL RECORD COPY