Letter Sequence Meeting |
---|
|
|
MONTHYEARML0735320682007-12-21021 December 2007 Forthcoming Meeting with Dominion Energy Kewaunee, Inc., Concerning License Amendment Applications Regarding Auxiliary Building Crane Modifications at the Kewaunee Power Station Project stage: Meeting ML0802304472008-01-25025 January 2008 Summary of Meeting with Dominion Energy Kewaunee Inc. Licensee'S Amendment Request on Seismic Methodology for Analysis of Auxiliary Building Crane Project stage: Meeting ML0805202732008-02-22022 February 2008 Request for Additional Information Regarding Relocating Requirements for Spent Fuel Pool Crane System Project stage: RAI ML0811507412008-05-0707 May 2008 Withdrawal of an Amendment Request Regarding Auxiliary Building Crane Upgrade Methodology Change(Tac No. MD7301) Project stage: Withdrawal 2008-01-25
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML19289D4842019-10-24024 October 2019 Summary for NEIMA-Kewaunee Meeting on 9/24/2019 ML16190A3452016-07-13013 July 2016 Inc. Pre-Submittal Meeting Regarding Load Drop Analysis for Spent Fuel Cask Handling Operations at Kewaunee Power Station (L53130) ML15223B2832015-08-11011 August 2015 Summary of Public Meeting to Discuss NRC Activities at the Kewaunee Power Station ML13205A0832013-07-24024 July 2013 Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment ML12352A2822012-12-31031 December 2012 Summary of Meeting with Dominion Energy Kewaunee on Implementation of Orders Japan Lessons Learned Effort ML12292A0942012-10-17017 October 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Unit 2 Steam Generators Replacement Activities ML11173A2772011-06-22022 June 2011 Summary of the Public Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Kewaunee Power Station End-Of-Cycle Performance Assessment for 2010 ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML1012601102010-05-18018 May 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplement Environmental Impact Statement Related to the Review of the Kewaunee Power Station License Renewal Application ML1012600702010-05-0505 May 2010 Summary of Public Meeting to Discuss the 2009 Kewaunee End-Of-Cycle Performance Assessment ML1007107412010-03-31031 March 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the NRC to Discuss Certain RAI Responses on Two Mechanical Systems ML1001104472010-01-13013 January 2010 Summary of Telephone Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Duplicate RAI Number ML0932400382009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Inaccessible Cables Program ML0932302572009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Program for Neutron Absorbing Material ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML0921801372009-08-12012 August 2009 Summary Site Audit Related to the Review of the License Renewal Application for Kewaunee Power Station ML0921006122009-08-10010 August 2009 07/28/2009 Summary of Public Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0918205652009-07-0808 July 2009 Summary of Conference Calls with Dominion Energy Kewaunee, Inc., to Discuss Response to Follow-Up Question Regarding Severe Accident Mitigation Alternatives Request for Additional Information for Kewaunee Power Station ML0916904292009-06-17017 June 2009 Summary of Public Meeting with NRC and Members of the Kewaunee Power Station Emergency Preparedness Staff to Discuss the June 2009 Kewaunee Emergency Preparedness Exercise ML0913300252009-05-21021 May 2009 Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format ML0913403292009-05-14014 May 2009 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the 2008 Kewaunee End-of-Cycle Performance Assessment ML0900801102009-02-0505 February 2009 Summary of Meeting Between NRC Staff and Kewaunee to Discuss a Future Amendment to Convert Technical Specifications to the Improved Standard TS Format ML0830904522008-11-17017 November 2008 10/22/08 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0815607282008-05-29029 May 2008 Ltr. 05/29/08 Kewaunee Re Non-Public Meeting Summary ML0810202352008-04-11011 April 2008 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the Nrc'S Assessment ML0802304472008-01-25025 January 2008 Summary of Meeting with Dominion Energy Kewaunee Inc. Licensee'S Amendment Request on Seismic Methodology for Analysis of Auxiliary Building Crane ML0729601702007-10-31031 October 2007 Public Meeting Summary on the Reactor Oversight Process ML0729005732007-10-17017 October 2007 Summary of Public Meeting with Dominion Energy Kewaunee to Discuss the Ongoing Substantive Cross-Cutting Issues ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721900152007-08-0909 August 2007 8/2/07 Public Meeting Summary on the Kewaunee Appeal of a Frequently Asked Question on the Mitigating Systems Performance Index ML0709504642007-04-0505 April 2007 Summary of Public Meeting with Dominion Energy Kewaunee, Inc. Regarding the Kewaunee End-of-Cycle Plant Performance Assessment ML0703304272007-02-26026 February 2007 Summary of January 25, 2007, Meeting with Dominion Energy Kewaunee Inc., on the Licensee'S Amendment Request Regarding the Use of TORMIS Methodology ML0634605062006-12-12012 December 2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station ML0618405302006-07-0303 July 2006 Public Meeting Summary with Kewaunee to Discuss Improvement Initiatives ML0609005782006-03-30030 March 2006 Public Meeting Summary Kewaunee End-of-Cycle Plant Performance Assessment ML0604000982006-02-24024 February 2006 Summary of Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Applicability of Dominion Safety and Core Design Methods to Kewaunee Power Station ML0532103612005-11-16016 November 2005 Kewaunee Public Meeting Summary, Regulatory Conference for Flooding Issue and Management Meeting ML0527702352005-09-29029 September 2005 Summary of the August 9, 2005, Public Meeting to Discuss the Kewaunee End-of-Cycle Plant Performance Assessment ML0513100572005-05-12012 May 2005 Summary of Meeting with Nuclear Management Company, LLC Regarding the Auxiliary Feedwater Amendment Request Dated May 5, 2005, and the Internal Flooding Design Basis ML0507505452005-03-18018 March 2005 3/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695) ML0435801802004-12-22022 December 2004 Summary of Public Meeting with Nuclear Management Company, Llc. to Discuss Engineering Initiatives ML0418202382004-05-21021 May 2004 Public Meeting Summary with Nuclear Management Company, LLC Re Kewaunee 2003 End-of-Cycle Assessment ML0333709182003-12-15015 December 2003 Summary of Meeting with Nuclear Management Company, LLC, Regarding Amendment Requests to Use Alternate Source Term Methodology at Prairie Island and Kewaunee ML0323103952003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0323101482003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0312504092003-04-21021 April 2003 Public Meeting Summary with Nuclear Management Co. LLC Kewaunee to Discuss Kewaunee Performance Re EOC ML0222502832002-08-20020 August 2002 Summary of Meeting Between the NRC Staff and Nuclear Management Company, LLC Upcoming Power Uprate and Associated Submittals for Kewaunee ML0214900232002-05-31031 May 2002 Meeting with Nuclear Management Company, LLC, to Discuss Their Response to Interim Compensatory Measure B.2.b of the Security Orders 2019-10-24
[Table view] Category:Memoranda
MONTHYEARML19289D4842019-10-24024 October 2019 Summary for NEIMA-Kewaunee Meeting on 9/24/2019 ML19165A0342019-06-14014 June 2019 Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S (Collectively, Dominion) Decommissioning Funding Plans Submi ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17053A5902017-02-24024 February 2017 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML16217A0912016-08-0404 August 2016 Technical Assistance Request for Review of Dominion Energy Kewaunee'S LAR No. 263 Regarding Drop Load Analysis (CAC No. L53143) ML16190A3452016-07-13013 July 2016 Inc. Pre-Submittal Meeting Regarding Load Drop Analysis for Spent Fuel Cask Handling Operations at Kewaunee Power Station (L53130) ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15279A4312015-10-0707 October 2015 Memorandum Request for Technical Assistance on License Amendment 259, ISFSI Only EP (TAC No. L53082) ML14023A6782014-01-27027 January 2014 Staff Review of Revised Responses to EA-07-195 for the Implementation of Additional Security Measures - Kewaunee Power Station Independent Spent Fuel Storage (TAC L24854) ML13143A3682013-05-29029 May 2013 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans for Kewaunee Power Station Regarding Emergency Preparedness ML13116A3262013-04-30030 April 2013 Forthcoming Closed Meeting with Dominion Energy Kewaunee Staff to Discuss Planning for Physical Security at Kewaunee Power Station ML13091A1872013-04-0505 April 2013 MF1045 Kewaunee Decom PSDAR Public Mtg on 24 Apr 13 2013-03-29-1358 ML12319A4022012-11-15015 November 2012 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans by Kewaunee Power Station to Implement Orders from Lessons Learned from Events in Fukushima, Japan ML11271A1782011-10-0303 October 2011 Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, ML1111904522011-04-29029 April 2011 Notice of Meeting with Dominion Energy Kewaunee to Present the Licensee the Results of NRC End-Of-Cycle Assessment of Kewaunee Power Station ML1032104512010-11-17017 November 2010 Certification of Meeting Minutes of the Plant License Renewal Subcommittee on August 18, 2010 (Kewaunee Power Plant).Certification of Meeting Minutes of the Plant License Renewal Subcommittee on August 18, 2010 (Kewaunee Power Plant) ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1011901162010-07-15015 July 2010 Memorandum to ACRS Subcommittee Re Kewaunee SER ML1012601102010-05-18018 May 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplement Environmental Impact Statement Related to the Review of the Kewaunee Power Station License Renewal Application ML1011707792010-04-30030 April 2010 Notice of Meeting with Kewaunee Personnel to Discuss Kewaunee'S Proposed Response to an RAI Regarding Generic Letter 2004-02 ML1007107412010-03-31031 March 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the NRC to Discuss Certain RAI Responses on Two Mechanical Systems ML1003210772010-02-16016 February 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and USNRC to Discuss Certain Request for Additional Information on Structural Items ML0934313392009-12-16016 December 2009 Summary of Telephone Conference Call on December 9, 2009, Between Dominion Energy Kewaunee Inc., and U.S. NRC to Discuss Tables Referenced in the Work Control Process Amendment Letter ML0932302572009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Program for Neutron Absorbing Material ML0923801712009-08-28028 August 2009 Notice of Telephone Conference Meeting with Dominion Energy Kewaunee, to Discuss Licensee'S Proposed Response to Request Regarding Generic Letter 2004-02 ML0918205652009-07-0808 July 2009 Summary of Conference Calls with Dominion Energy Kewaunee, Inc., to Discuss Response to Follow-Up Question Regarding Severe Accident Mitigation Alternatives Request for Additional Information for Kewaunee Power Station ML0835700272008-12-23023 December 2008 Meeting Notice, Meeting with Dominion Energy Kewaunee, Inc., to Discuss a Future Application to Convert the Kewaunee Technical Specifications from the Current Custom Format to the Improved Standard Format ML0830904522008-11-17017 November 2008 10/22/08 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0827501122008-10-0808 October 2008 10/22/2008-Notice of Meeting to Discuss License Renewal Process and Environmental Scoping Kewaunee Power Station ML0820403272008-07-23023 July 2008 Notice of Meeting with Kewaunee Nuclear Plant Regarding Hostile Action Based Emergency Preparedness Drill Scenario Review ML0814300772008-06-0202 June 2008 Conference Call with Dominion Regarding Proposed Changes to the Radiological Emergency Response Plan for Kewaunee Power Station ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0802304472008-01-25025 January 2008 Summary of Meeting with Dominion Energy Kewaunee Inc. Licensee'S Amendment Request on Seismic Methodology for Analysis of Auxiliary Building Crane ML0731801322007-11-15015 November 2007 Notice of Meeting with Dominion Energy Kewaunee, Inc., Concerning the Current License Amendment Application Regarding Internal Flooding at the Kewaunee Power Station ML0730304052007-10-31031 October 2007 E. Marinos Memo Technical Assistance Request-Dominion Resources, Inc.'S December 6, 2006, Request for Exemption from 10 CFR 74.13(a) Requirements Regarding Material Status Report Submittal Time Frame ML0721900152007-08-0909 August 2007 8/2/07 Public Meeting Summary on the Kewaunee Appeal of a Frequently Asked Question on the Mitigating Systems Performance Index ML0717905882007-07-0202 July 2007 Notice of Meeting with Industry to Discuss a Reactor Oversight Process Appeal of a Frequently Asked Question on the Mitigating Systems Performance Index ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0626801062006-09-21021 September 2006 Memo to Dyer from Paul, Kewaunee Nuclear Power Plant: Deliberate Failure by Contractors to Follow Fitness for Duty Regulation ML0612301072006-05-0505 May 2006 Region III Comments on Draft Response to Task Interface Agreement 2005-10 Relating to Impact of Flooding on Residual Heat Removal (RHR) Pumps at Kewaunee Power Station ML0601704112006-01-19019 January 2006 Notice of Meeting with Dominion Energy Kewaunee, Inc. to Discuss Proposed Accident Analysis Methodology for the Kewaunee Nuclear Power Plant ML0527702352005-09-29029 September 2005 Summary of the August 9, 2005, Public Meeting to Discuss the Kewaunee End-of-Cycle Plant Performance Assessment ML0517405322005-08-0303 August 2005 NPP - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reators. ML0511700412005-04-27027 April 2005 Forthcoming Meeting with Nuclear Management Company, LLC to Discuss Auxiliary Feedwater License Amendment Request for the Kewaunee Nuclear Power Plant ML0507505452005-03-18018 March 2005 3/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695) ML0421003322004-06-30030 June 2004 Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0407004402004-04-18018 April 2004 Technical Specification 3.4b, Auxiliary Feedwater System, Interpretation 2019-06-14
[Table view] |
Text
January 25, 2008 LICENSEE: Dominion Energy Kewaunee, Inc.
FACILITY: Kewaunee Power Station
SUBJECT:
SUMMARY
OF JANUARY 7, 2008, MEETING WITH DOMINION ENERGY KEWAUNEE INC., ON THE LICENSE AMENDMENT REQUEST REGARDING SEISMIC METHODOLGY FOR ANALYSIS OF AUXILIARY BUILDING CRANE (TAC NO. MD7301)
On January 7, 2008, the U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public meeting with Dominion Energy Kewaunee, Inc. (the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss issues related to the licensees application dated November 9, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073180499). In this application, the licensee requested NRC approval to use a new methodology to perform the seismic qualification analysis for the auxiliary building crane at Kewaunee Power Station (KPS).
The non-single-failure-proof auxiliary building crane is being upgraded to a single-failure-proof design through replacement of the crane trolley and modification of the existing crane bridge.
The proposed methodology is not currently described in the KPS Updated Safety Analysis Report or the code of reference applicable to the crane. The existing auxiliary building crane, with modifications, will be used to lift NUHOMS dry fuel casks in support of the independent spent fuel storage facility, which is currently being constructed at KPS. As a result of the design of the single-failure proof trolley, the new trolley is about 20 tons heavier in weight. A list of attendees is provided as Enclosure 1.
As delineated in its handout slides (Enclosure 2), the licensee presented information regarding the purpose of the amendment application, which proposes to use rolling of the crane wheels under limited circumstances in the seismic analysis. Without consideration for this rolling, extensive modification of the crane bridge and building would be required. The licensee also noted that the remainder of the crane seismic analysis was performed in accordance with the American Society of Mechanical Engineers Standard NOG-1, "Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)," 2004 Edition. In addition, the licensee described features of the design and configuration of the crane and trolley. In particular, the licensee discussed the performance features of the crane motor brake, which restricts movement of the two drive wheels. There are six idler wheels also associated with the crane. The licensees revised seismic analyses were performed assuming the maximum 125 tons loaded on the main hoist hook.
The licensee further discussed its basis for assuming that rolling in the seismic analysis model would occur after the inertia force overcomes the motor brake torque for the crane and the trolley. The licensee described its use of a technical paper by N. Mostaghel and J. Tanbakuchi to modify the single degree of freedom oscillator in the traditional response spectrum.
Regarding the seismic analysis method, the licensee also discussed acceleration response spectrum and stated that for low frictional coefficients, the response spectra in the frequency
region of interest was not very sensitive to the input time-history. The licensee also described its three dimensional finite element model for the crane and rail system.
On the basis of the licensees presentation of information, the NRC staff expressed concerns with issues regarding the performance of a dynamic analysis and consideration of elasticity in the girders, kinetic energy of translation of the crane and rotation of the drive assembly components, and other factors. The staff also asked questions regarding the application of the technical paper to the KPS crane system such that it could be shown that it was a conservation technology. The specific questions from the staff are detailed in Enclosure 3 and will require further information from the licensee. The licensee will provide its responses to the NRC staff questions in a separate correspondence, which will be submitted formally to the NRC as part of the license amendment review.
No members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1457.
/RA/
Patrick D. Milano, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout
- 3. Staff Questions cc w/encls: See next page
ML080230447, Package: ML080230489 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/DE/EMCB/BC NRR/LPL3-1/BC(A)
NAME PMilano THarris KManoly JCushing for PMilano DATE 01/18/08 01/23/08 01/22/08 01/25/08 Kewaunee Power Station cc:
Mr. David A. Christian Ms. Lillian M. Cuoco, Esq.
President and Chief Nuclear Officer Senior Counsel Virginia Electric and Power Company Dominion Resources Services, Inc.
Innsbrook Technical Center 120 Tredegar Street 5000 Dominion Boulevard Riverside 2 Glen Allen, VA 23060-6711 Richmond, VA 23219 Resident Inspectors Office Mr. Stephen E. Scace U.S. Nuclear Regulatory Commission Site Vice President N490 Hwy 42 Dominion Energy Kewaunee, Inc.
Kewaunee, WI 54216-9510 Kewaunee Power Station N 490 Highway 42 Mr. Chris L. Funderburk Kewaunee, WI 54216 Director, Nuclear Licensing and Operations Support Mr. Thomas J. Webb, Director Innsbrook Technical Center Nuclear Safety & Licensing 5000 Dominion Boulevard Dominion Energy Kewaunee, Inc.
Glen Allen, VA 23060-6711 Kewaunee Power Station N 490 Highway 42 Mr. Thomas L. Breene Kewaunee, WI 54216 Dominon Energy Kewaunee, Inc.
Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216
Dominion Energy Kewaunee, Inc.
Meeting Regarding License Amendment Request Licensing Basis for Internal Flooding Events Monday January 7, 2008 List of Attendees Nuclear Regulatory Commission Name Position/Title Organization Patrick D. Milano Project Manager NRR/Division of Operating Reactor Licensing (DORL)/Plant Licensing Branch 3-1 (LPL3-1)
Kamal Manoly Branch Chief NRR/Division of Engineering (DE)/Mechanical and Civil Engineering Branch (EMCB)
Mark Hartzman Sr. Mechanical Engineer NRR/DE/EMCB Steven Jones Sr. Systems Engineer NRR/Division of Safety Systems (DSS)/Balance-of-Plant Branch (SBPB)
Sarah Bakhsh Health Physicist Region III/Division of Nuclear Materials and Safety (DNMS)/Decommissioning Branch Dominion Energy Kewaunee, Inc.
Name Position/Title Lori Armstrong Director, Nuclear Engineering David Lohman Project Manager, Design Engineering Thomas Webb Director, Safety and Licensing Gerald Riste Supervisor, Licensing Dominion Resources Services Name Position/Title Craig Sly Engineer, Nuclear Licensing and Operations Support Divakar Bhargava Consulting Engineer, Engineering Mechanics, Nuclear Engineering Charles Zalesiak Civil Engineer Contractors/Vendors Name Company Jami Rubendall American Crane & Equipment Corp.
Chang Chen American Crane & Equipment Corp Brian Gutherman ACI Nuclear Energy Solutions Public: None present ENCLOSURE 1
NRC Staff Questions Asked During Public Meeting Regarding Seismic Analysis Methods for Auxiliary Building Crane
- 1. For the East-West Mid-span Case, the calculation of the equivalent coefficient of friction of 0.061 appears to be based on the assumption that the friction force acts on all eight wheels simultaneously. However, the friction (traction) force acts only on the two drive wheels, while the weight of the crane is distributed among the eight wheels. We request that you provide:
A. The equivalent coefficient of friction based on the normal reactions acting on the two drive wheels, not on the total crane weight, and show all free- body diagrams used in the Mid-span Case analysis.
B. Provide justification for the assumption of a rigid crane used in determining the equivalent coefficient of friction of 0.061.
- 2. The attached paper in LAR 234, Response of Sliding Structures to Earthquake Support Motion, forms the basis for the analysis of the crane for both the Mid-span and End-span cases. This paper is applicable to sliding of a single degree of freedom elastic mass between a flat base structure and a flat ground.
A. Show that the methodology of this paper is applicable to a structure on wheels rolling on a flat ground under seismic movement, where the friction is provided by torque on the driver wheel.
B. The analysis in the paper are based on the El Centro N-S ground time history.
Show that the acceleration and displacement spectra based on the Housner-based acceleration time-history at the elevation of the crane envelop the acceleration and displacement spectra of the paper.
C. Provide a discussion of the damping used to develop the Housner-based acceleration time-history at the elevation of the crane D. Since the paper does not include the vertical seismic acceleration in the sliding analysis of the paper, provide a discussion of the effect of this acceleration on the crane analysis.
- 3. For the East-West End-span Case, the crane is an un-symmetric structure.
A. State the basis for assuming that the center of mass is in the middle of the crane.
B. Provide justification why the equivalent coefficient of friction of the Mid-Span case is applicable to this case.
ENCLOSURE 3
C. Provide a detailed discussion of the 3-D analysis of the crane and show how the results from the paper were applied. Show all free-body diagrams used in the analysis.
D. Show that the unsymmetrical motion of the crane has no effect on the rails.
- 4. Kewaunee Power Station updated safety analysis report Section B.8 states that the stability of the crane is assured by fixed, fitted rail yokes that allow free rolling movement but prevent the wheels from being lifted or derailed. The bridge and trolley wheels are equipped with electrically activated, spring set brakes. Upon loss of power or when the crane or trolley is not under operator control, the springs activate the brake, locking the wheels firmly into place to prevent rolling out of position.
A. Provide a diagram of the rail yokes and their location on the bridge.
B. Provide a description of the brakes, including the applicable coefficient of friction.
C. Provide justification for assuming that the drive wheels will not slip before the disc brake slips.
D. Provide an evaluation demonstrating that as a result of the heavier trolley, the wheels will not lift or derail under the seismic loading.
- 5. In the section titled Member Stress and Connection Checks, provide a description and detailed discussion of the method for calculating the stresses due to the dead weight and seismic loading.