ML20052D276

From kanterella
Revision as of 18:57, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discusses Electrical Transmitter Replacement & Calibr Per IE Bulletin 79-01B.Several Transmitters Will Be Replaced W/Environmentally Qualified Models & Calibr in Accordance W/Std Procedures & Tech Specs
ML20052D276
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/28/1982
From: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-82-70, REF-SSINS-6820 IEB-79-01B, IEB-79-1B, NUDOCS 8205060429
Download: ML20052D276 (1)


Text

-

NRC-82-70 WISCONSIN P U B LIC S E RVICE CO RPORATIO N P.O. Box 1200, Green Bay, Wisconsin 54305 April 28, 1982 h O

&g Mr. J. G. Keppler, Regional Administrator 9 Office of Inspection & Enforcement g'y Region III 51992*'$

U. S. Muclear Regulatory Commission -

799 Roosevelt Road b , , - ', , %Es a

_ , .3 yQ Glen Ellyn, IL 60137  % ",

" '///

> i:;

Dc:r Mr. Keppler: >g gd)

Docket 50-305 Operating License DPR-43 Kewaunce Nuclear Power Plant Electrical Transmi tter Replacement and Calibration (IE Bulletin 79-OlB)

During the current refueling outage we are planning on replacing several transmitters with models that are environmentally qualified to recently issued requirements. The currently installed transmitters will not be calibrated prior to removal, however, the new transmitters will be calibrated in accordance with our standard procedures and technical specifications. This work is being performed as part of our equipment qualification program as noted in our docket.

This has been discussed with the Resident Inspector and this letter is being sent at his request.

Very truly yours,

&& - bd E. R. Mathews, Seni r Vice President Power Supply & Engineering snf cc - Mr. Robert Nelson, US NRC 82050SO429 820428 T2)

/#

PDR ADOCK 05000305 i G PDR APR 3 01

-