ML050130192

From kanterella
Revision as of 00:01, 24 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Telephone Conference Held on January 5, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, U
ML050130192
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/10/2005
From: Veronica Rodriguez
NRC/NRR/DRIP/RLEP
To:
Nuclear Management Co
Rodriguez V, RLEP/DRIP/NRR, 415-2232
References
Download: ML050130192 (6)


Text

January 10, 2005 LICENSEE: Nuclear Management Company, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE HELD ON JANUARY 5, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NUCLEAR MANAGEMENT COMPANY, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Nuclear Management Company, LLC (NMC) held a telephone conference on January 5, 2005, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Point Beach Nuclear Plant, Units 1 and 2, license renewal application. The conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the meeting participants. Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Verónica M. Rodríguez, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosures:

As stated cc w/encls: See next page

ML050130192 DOCUMENT NAME: E:\Filenet\ML050130192.wpd OFFICE PM:RLEP SC:RLEP NAME VRodriguez SLee DATE 01 /10 /05 01 /10 /05

Point Beach Nuclear Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esq. Mr. Jeffrey Kitsembel Vice President, Counsel & Secretary Electric Division Nuclear Management Company, LLC Public Service Commission of Wisconsin 700 First Street P.O. Box 7854 Hudson, WI 54016 Madison, WI 53707-7854 Mr. Frederick D. Kuester David Weaver President and Chief Executive Officer Nuclear Asset Manager We Generation Wisconsin Electric Power Company 231 West Michigan Street 231 West Michigan Street Milwaukee, WI 53201 Milwaukee, WI 53201 James Connolly John Paul Cowan Manager, Regulatory Affairs Executive Vice President & Chief Nuclear Point Beach Nuclear Plant Officer Nuclear Management Company, LLC Nuclear Management Company, LLC 6610 Nuclear Road 700 First Street Two Rivers, WI 54241 Hudson, WI 54016 Mr. Ken Duveneck Douglas E. Cooper Town Chairman Senior Vice President - Group Operations Town of Two Creeks Palisades Nuclear Plant 13017 State Highway 42 Nuclear Management Company, LLC Mishicot, WI 54228 27780 Blue Star Memorial Highway Covert, MI 49043 Chairman Public Service Commission Fred Emerson of Wisconsin Nuclear Energy Institute P.O. Box 7854 1776 I Street, NW., Suite 400 Madison, WI 53707-7854 Washington, DC 20006-3708 Regional Administrator, Region III Roger A. Newton U.S. Nuclear Regulatory Commission 3623 Nagawicka Shores Drive 801 Warrenville Road Hartland, WI 53029 Lisle, IL 60532-4351 James E. Knorr Resident Inspector's Office License Renewal Project U.S. Nuclear Regulatory Commission Nuclear Management Company, LLC 6612 Nuclear Road 6610 Nuclear Road Two Rivers, WI 54241 Point Beach Nuclear Plant Two Rivers, WI 54241

DISTRIBUTION: Ltr. to: Nuclear Management Company, LLC, Re: Telephone conference call concerning D-RAIs pertaining to Pt. Beach Nuclear Plant, Date: January 10, 2005 Adams accession no.: ML050130192 HARD COPY RLEP RF Project Manager E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff


P. Lougheed, RIII J. Strasma, RIII A. Stone, RIII H. Chernoff W. Ruland C. Marco L. Raghavan T. Mensah OPA

LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION JANUARY 5, 2005 Participants Affiliations J.Knorr Nuclear Management Company, LLC (NMC)

J.Thorgersen NMC T.Mielke NMC D.Reddy Nuclear Regulatory Commission (NRC)

M.Morgan NRC V.Rodriguez NRC G. Suber NRC Enclosure 1

DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAI)

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION January 5, 2005 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Nuclear Management Company, LLC (NMC) held a telephone conference call on January 5, 2005, to discuss and clarify the staffs draft request for additional information (D-RAI) concerning the Point Beach Nuclear Plant, Units 1 and 2, license renewal application (LRA). The following D-RAI was discussed during the telephone conference call.

Section 2.3.4 Steam and Power Conversion Systems 2.3.4.2 Feedwater and Condensate System D-RAI 2.3.4.2-4 In a letter dated November 16, 2004, the Nuclear Regulatory Commission (NRC) requested additional information regarding the Auxiliary Systems (LRA Section 2.3.3) and Steam and other Balance of Plant (BOP) Systems in LRA Sections 2.3.3 and 2.3.4 respectively. PBNP response to this request was submitted to the NRC in Nuclear Management Company, LLC letter dated December 22, 2004. The NRC review of the PBNP response to RAI 2.3.4.2-1 identified two follow-up questions regarding the scoping for the small bore branch piping from the NSR portion of the 16" main feed water header (FW) between the feed regulating valve and the downstream steam generator FW inlet check valve:

1. Recognizing the NRC would not require a formal HELB evaluation be performed on piping 1-inch and less, did PBNP perform any evaluation (i.e., walkdown, etc.) to confirm that a break in the branch piping would not impact any safety related equipment in the immediate vicinity of the possible break location?
2. Please discuss flooding associated with a failure in the branch piping and its impact on safety related equipment.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Enclosure 2