SUBJECT:
POINT BEACH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000266/2023402 AND 05000301/2023402
Dear Michael Durbin:
On October 12, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mark Fencl, Security Director, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2023402 and 05000301/2023402
Enterprise Identifier:
I-2023-402-0050
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant
Location:
Two Rivers, WI
Inspection Dates:
September 18, 2023 to October 12, 2023
Inspectors:
M. Ziolkowski, Sr. Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Security, Emergency Preparedness, and Incident
Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.07 - Security Training
The inspector evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: All Requirements
- Tier II: 02.05 a-c; 02.06 a-b; 02.08 a
- Tier III: 02.12 a-b; 02.13 a-c
71130.09 - Security Plan Changes
The inspector evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC inspection of this program area, Security Plan Revision 18 was implemented based on your determination, in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of Title 10 of the Code of Federal Regulations, Part 73.55(b). The inspector conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
71130.14 - Review of Power Reactor Target Sets
The inspector evaluated the Security Target Set Program through the completion of the following procedure elements:
Review of Power Reactor Target Sets (1 Sample)
(1)02.01; 02.02 a-d; 02.03; 02.04 a-b;
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) July 1, 2022 through June 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 12, 2023, the inspectors presented the security baseline inspection results to Mark Fencl, Security Director, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
National Rifle Association, Night Fire Course of Fire
Certification
03/13/2023
National Rifle Association, Day Fire Course of Fire
Certification
09/02/2021
Point Beach Physical Fitness Test
2/15/2021
PBNP Security Exam
01/05/2023
10-015
PBNP Tactical Qualification Course Justification
Miscellaneous
CS-429
Point Beach Physical Fitness Test Basis
2/15/2021
STIP 201
Security Instructor Qualification
STIP 220
Medical and Physical Fitness Requirements
STIP 411
Table Top Drills
Procedures
Use of Force
Self-Assessments
Complete Training Inspection L1A IP 7130.07
04/16/2023
NextEra Energy Point Beach LLC, Point Beach Nuclear Plant
Unit 1 and Unit 2 Physical Security Plan
17, 18
Miscellaneous
50.54(p) Effectiveness Review for Physical Security Plan
PBNP Unit 1 and Unit 2 Target Set Background Information
09/03/2019
Target Set Basis Information Document
2/01/2017
Miscellaneous
Critical Digital Asset Target Set Reference
08/23/2023
71151
Procedures
NP 5.2.16
NRC Performance Indicators
19