Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402
ML23312A112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/14/2023
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Durbin M
Point Beach
References
IR 2023402
Download: ML23312A112 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000266/2023402 AND 05000301/2023402

Dear Michael Durbin:

On October 12, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mark Fencl, Security Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2023402 and 05000301/2023402

Enterprise Identifier:

I-2023-402-0050

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

September 18, 2023 to October 12, 2023

Inspectors:

M. Ziolkowski, Sr. Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.07 - Security Training

The inspector evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 a-c; 02.06 a-b; 02.08 a
  • Tier III: 02.12 a-b; 02.13 a-c

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 18 was implemented based on your determination, in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of Title 10 of the Code of Federal Regulations, Part 73.55(b). The inspector conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

71130.14 - Review of Power Reactor Target Sets

The inspector evaluated the Security Target Set Program through the completion of the following procedure elements:

Review of Power Reactor Target Sets (1 Sample)

(1)02.01; 02.02 a-d; 02.03; 02.04 a-b;

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) July 1, 2022 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 12, 2023, the inspectors presented the security baseline inspection results to Mark Fencl, Security Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

National Rifle Association, Night Fire Course of Fire

Certification

03/13/2023

National Rifle Association, Day Fire Course of Fire

Certification

09/02/2021

Point Beach Physical Fitness Test

2/15/2021

PBNP Security Exam

01/05/2023

10-015

PBNP Tactical Qualification Course Justification

Miscellaneous

CS-429

Point Beach Physical Fitness Test Basis

2/15/2021

STIP 201

Security Instructor Qualification

STIP 220

Medical and Physical Fitness Requirements

STIP 411

Table Top Drills

Procedures

SY-AA-102-1032

Use of Force

71130.07

Self-Assessments

AR 02455136

Complete Training Inspection L1A IP 7130.07

04/16/2023

NextEra Energy Point Beach LLC, Point Beach Nuclear Plant

Unit 1 and Unit 2 Physical Security Plan

17, 18

71130.09

Miscellaneous

50.54(p) Effectiveness Review for Physical Security Plan

PBNP Unit 1 and Unit 2 Target Set Background Information

09/03/2019

Target Set Basis Information Document

2/01/2017

71130.14

Miscellaneous

Critical Digital Asset Target Set Reference

08/23/2023

71151

Procedures

NP 5.2.16

NRC Performance Indicators

19