Summary of Public Meeting with NextEra Energy Point Beach, LLC, to Discuss Proposed Changes to Containment Dome Truss Design Bases Code for Point Beach Nuclear Plant, Units 1 and 2
ML15215A050
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/05/2015
From: Mahesh Chawla
Plant Licensing Branch III
To:
Chawla M
References
TAC MF6426, TAC MF6427
Download: ML15215A050 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 5, 2015 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF JULY 28, 2015, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS PROPOSED CHANGES TO THE CONTAINMENT DOME TRUSS LICENSING BASIS SEISMIC SPECTRA FOR THE POINT BEACH NUCLEAR PLANT, UNITS 1AND2 (TAC NOS. MF6426 AND MF6427)

On July 28, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Point Beach, LLC {NextEra, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of this meeting was for NextEra to discuss with the NRC staff a proposed license amendment amendment request (LAR) to change the Point Beach Nuclear Plant, Units 1 and 2, containment dome truss structure licensing basis seismic spectra to a new set of spectra developed using the Fukushima ground motion response spectra (GMRS). The licensee believes that using this GMRS as input motion for the containment structure seismic re-analysis would result in a lower seismic force on the containment dome truss structure. This GMRS was submitted in response to the NRC's March 12, 2012, Title 10 of the Code of Federal Regulations 50.54(f) letter requesting licensee re-evaluation of seismic hazards. This is significant because it would be the first LAR using the reevaluated hazards associated with lessons-learned from the Fukushima Daiichi accident. The licensee proposed to sue this GMRS instead of the existing design basis GMRS to establish maximum resulting seismic forces on the containment dome truss structure using damping values from Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," Revision 1, instead of the current license design basis for the containment.

The licensee further proposed to use American Society of Mechanical Engineers (ASME)

Section Ill, Appendix F, provisions in conjunction with the provisions of the licensing basis code of record, American Institute of Structural Construction (AISC) Steel Construction Manual, for structural evaluation of the containment dome truss, a methodology which is unprecedented.

The NRC staff expressed concern with application of the new re-evaluated seismic hazard GMRS spectra for the containment dome truss structure without also re-evaluating the containment structure. The staff also expressed concern with the application of ASME Section Ill, Appendix F, beyond the intent established by the ASME Code.

The meeting notice and agenda, dated July 7, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15204A204. A list of attendees is enclosed.

The licensee provided slides for the presentation (ADAMS Accession No. ML15203A498) prior to the meeting. During the meeting, the licensee discussed each of the slides. The NRC staff asked numerous clarification questions during the presentation. After the presentation, NextEra staff indicated that they would consider the standard methodology and approach that has been previously approved by the NRC.

No regulatory decisions or commitments were made during the meeting. No members of the public were in attendance, physically or by telephone. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-8371 or Mahesh.Chawla@nrc.gov.

Mahes L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES JULY 28. 2015. MEETING WITH NEXTERA ENERGY POINT BEACH. LLC REGARDING POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 PROPOSED CONTAINMENT DOME TRUSS STRUCTURE BASES CHANGES U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager (PM)

Reactor Licensing (DORL)

Jay Schafler Student Engineer David Pelton Branch Chief (BC)

Division of Engineering (DE) Timothy Lupold BC, Mechanical & Civil Engineering Branch (EMCB)

Dan Hoang Structural Enoineer (EMCB)

Yong Li Sr. Geophysicist, Seismology (EMCB)

Michael Breach Mechanical Engineer (EMCB)

Kamal Manoly Senior Technical Advisor Japan Lessons Learned Mohamed Shams BC Directorate (JLD) Michael Marshall Senior PM Nuclear Regulatory Commission, Office of New Reactors Division of Site Safety and Nilesh Chokshi Consultant Environmental Analysis NextEra Energy Point Beach, LLC Point Beach Nuclear Plant William A Cross Fleet Regulatory Programs Manager Mike Millen Regulatory Projects Manaoer Brvan Wovak Licensing Manager Rich LaPlante Design Engineer Anil Julka Fleet Risk and Reliability Manager Phone Participants NRCDE Farhad Farzam Senior Structural Enoineer (EMCB)

NRC Region 3 David Oliver Senior Resident Inspector NRC Region 3 James Neurauter Senior Reactor Inspector NRC Region 3 John Bozga Reactor Inspector Enclosure

ML15203A498) prior to the meeting. During the meeting, the licensee discussed each of the slides. The NRC staff asked numerous clarification questions during the presentation. After the presentation, NextEra staff indicated that they would consider the standard methodology and approach that has been previously approved by the NRC.

No regulatory decisions or commitments were made during the meeting. No members of the public were in attendance, physically or by telephone. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-8371 or Mahesh.Chawla@nrc.gov.

IRA TBeltz for/

Mahesh L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorl Resource RidsNrrDorllpl3-1 Resource RidsNrrPMPointBeach Resource RidsNrrLALRonewicz Resource RidsRgn3MailCenter Resource RidsACRS_MailCTR Resource TWertz, NRR KMorganButler, OEDO MBreach, NRR Yli, NRR RidsNRRJLD Resource KManoly, NRR DHoang, NRR FFarzam, NRR DOliver, Riii JCameron, Rill JNeurauter, Rill JBozga, Rill KBarclay, Rill LPL3-1 R/F NChokshi, NRO JSchafler, NRR AD AMSAccess1on N o.: ML15215A050

  • concurrence prov1"d e d via

. e-ma1 OFFICE DORL/LPL3-1/PM DORL/LPL3-1 /LA DE/EMCB/BC

  • NAME ( TBeltz for) MChawla (LRonewicz for) MHenderson Tlupold DATE 8/05/2015 8/04/2015 8/04/2015 OFFICE NRR/JLD/BC
  • DORL/LPL3-1 /BC DORL/LPL3-1 /PM NAME MShams DPelton ( TBeltz for) MChawla DATE 8/03/2015 08/05/2015 8/05/2015