ML15113B386

From kanterella
Jump to navigation Jump to search
April 20, 2015 Summary of Public Outreach/Open House to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant
ML15113B386
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/23/2015
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To:
References
Download: ML15113B386 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 23, 2015 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 20, 2015, PUBLIC OUTREACH/OPEN HOUSE TO DISCUSS THE NRC 2014 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT On April 20, 2015, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2014 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML15089A021.

The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 4, 2015, End-of-Cycle Assessment letter, ML15062A585. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2014 performance can be found in ADAMS under ML15112A067. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML13064A291, the August 2014 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML13064A480 and a copy of Point Beach Supplemental Inspection report 05000266/2015-009, ML15077A007.

Throughout the open house, members of the public were given the opportunity to ask questions of NRC and NextEra officials.

/RA/_______________________

Jamnes Cameron, Branch Chief Branch 4 Division of Reactor Projects Docket No. 50-266; 50-301 License No. DPR-24; DPR-27

Enclosure:

List of Meeting Attendees cc w/encl: Distribution via LISTSERV

POINT BEACH 2014 PERFORMANCE ASSESSMENT MEETING April 20, 2015 MEETING ATTENDANCE LIST NRC Attendees K. Barclay, Resident Inspector, Point Beach Nuclear Plant J. Boettcher, Reactor Engineer, Region III Office K. OBrien, Director, Division of Reactor Safety, Region III Office J. Cameron, Chief, Branch 4, Division of Reactor Projects, Region III Office Members of the Public J. Garner, Staff Member for U.S. Senator Tammy Baldwin J. Bollier, Green Bay Press-Gazette NextEra Attendees E. McCartney D. DeBoer R. Webber J. Strharsky D. Forter R. Seizert C. Wienecke L. Hawk G. LeClair M. Millen L. Christensen Enclosure

LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 20, 2015, PUBLIC OUTREACH/OPEN HOUSE TO DISCUSS THE NRC 2014 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT On April 20, 2015, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2014 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML15089A021.

The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 4, 2015, End-of-Cycle Assessment letter, ML15062A585. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2014 performance can be found in ADAMS under ML15112A067. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML13064A291, the August 2014 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML13064A480 and a copy of Point Beach Supplemental Inspection report 05000266/2015-009, ML15077A007.

Throughout the open house, members of the public were given the opportunity to ask questions of NRC and NextEra officials.

/RA/_______________________

Jamnes Cameron, Branch Chief Branch 4 Division of Reactor Projects Docket No. 50-266; 50-301 License No. DPR-24; DPR-27

Enclosure:

List of Meeting Attendees cc w/encl: Distribution via LISTSERV DISTRIBUTION:

See next page ADAMS Accession Number: ML15113B386 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME BBartlett:mt JCameron DATE 04/22/15 04/23/15 OFFICIAL RECORD COPY

Memorandum from Jamnes Cameron dated April 23, 2015

SUBJECT:

SUMMARY

OF THE APRIL 20, 2015, PUBLIC OUTREACH/OPEN HOUSE TO DISCUSS THE NRC 2014 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT DISTRIBUTION w/encl:

Kimyata MorganButler RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ROPassessment.Resource@nrc.gov