Michael Durbin
Site Vice President
NextEra Energy Point Beach, LLC
6610 Nuclear Road
Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT - NOTICE OF INSPECTION AND
REQUEST FOR INFORMATION FOR THE NRC AGE-RELATED
DEGRADATION INSPECTION: INSPECTION REPORT 05000266/2024010
AND 05000301/2024010
Dear Michael Durbin:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct IP 71111.21N.04, Age-Related Degradation baseline inspection at Point
Beach Nuclear Plant, Units 1 and 2, in April 2024. The inspection team will be led by Thomas
Hartman from the NRC Region 3 Office. The team will be composed of personnel from the
NRC Region 3 Office. The inspection will be conducted in accordance with IP 71111.21N.04.
The schedule for the inspection is as follows:
Information gathering visit - week of March 4, 2024
On-site inspection - weeks of April 29, 2024, and May 13, 2024
The purpose of the information gathering visit is to become familiar with the station
maintenance, surveillance, testing, inspection, and condition monitoring programs, become
familiar with plant layout, support identification of structures, systems, and components (SSCs)
that will be reviewed during the inspection, and, as necessary, obtain plant-specific site access
training and badging for unescorted site access. An initial list of documents that the team will
review during the information gathering visit are listed in enclosure 1, section III.A.
During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access (including
radiation protection training, security, or safety); and the availability of knowledgeable plant staff
and licensing organization personnel to serve as points of contact during the inspection.
For SSCs that the inspection will review, an initial list of the documents the team will review
during the conduct of the inspection are listed in enclosure 1, section III.B. The team leader will
contact you with identified SSCs. Also, personnel should be available at the site during the
inspection who are knowledgeable regarding maintenance, surveillance, testing, inspection, and
condition monitoring programs.
February 5, 2024
M. Durbin
2
This letter contains voluntary information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). The burden to the public
for these information collections is estimated to average 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> per response. Send
comments regarding this information collection to the FOIA, Library and Information Collection
Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and
to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)
OMB, Washington, DC 20503.
In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC public document
room or from the publicly available records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Website.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection teams information or logistical needs, please
contact Thomas Hartman, the team leader, in the Region 3 Office at 630-829-9884.
Sincerely,
Thomas Hartman
Senior Project Engineer
Engineering & Reactor Projects Branch
Division of Operating Reactor Safety
Docket Nos. 05000266 and 05000301
License Nos. DPR-24 and DPR-27
Enclosure:
Age-Related Degradation Inspection
Request for Information
cc w/ encl: Distribution via LISTSERV
Signed by Hartman, Thomas
on 02/05/24
M. Durbin
3
Letter to Michael Durbin from Thomas Hartman dated February 5, 2024.
SUBJECT:
POINT BEACH NUCLEAR PLANT - NOTICE OF INSPECTION AND REQUEST
FOR INFORMATION FOR THE NRC AGE-RELATED DEGRADATION
INSPECTION: INSPECTION REPORT 05000266/2024010 AND
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMPointBeach
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML24036A265
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
THartman:sw
DATE
02/05/2024
OFFICIAL RECORD COPY
Enclosure
AGE-RELATED DEGRADATION INSPECTION
REQUEST FOR INFORMATION
I.
ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
05000266/2024010 and 05000301/2024010
Onsite Inspection Dates:
April 29-May 3, 2024, and May 13-17, 2024
Inspection Procedure:
IP 71111.21N04, Age-Related Degradation
Lead Inspector:
Thomas Hartman, Senior Project Engineer, RIII/DORS
630-829-9884
Thomas.Hartman@nrc.gov
Teammates:
Joon Park, Reactor Inspector, RIII/DORS
Kevin Fay, Reactor Inspector, RIII/DORS
II.
LOGISTICS
Email the following inspection logistics to the lead inspector by April 15, 2024, or sooner:
1.
Entrance meeting time and location;
2.
Room number/name and location of the room to be used by the inspection team
while onsite;
3.
Current management and engineering organizational chart;
4.
Response team contact information (names and phone numbers) and team roles
(e.g., management sponsor, lead, inspector counterpart);
5.
Any potential resource conflicts during the inspection (e.g., emergency drills and
all-staff meetings).
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in PDF files, Excel, or other
searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile, Box,
etc.). Specific Excel formats for various enclosure items may be requested to assist in
inspection sample selection. If you do not have access to any of these services or similar,
we can provide you access to Box, which can be used to upload/download and share
documents. The files should contain descriptive names and be indexed and hyperlinked to
facilitate ease of use. Information in lists should contain enough information to be easily
understood by someone who has knowledge of light-water reactor technology.
2
A. Information Requested to Support Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the teams use both on-site and off-site during the information gathering
visit. Electronic format is the preferred media. If electronic media is made available via an
internet based remote document management system, then the remote document access
should allow inspectors to download, save, and print the documents in the NRCs regional
office. Electronic media on compact disc or paper records (hard copy) are acceptable. At the
end of the inspection, the documents in the teams possession will not be retained.
This document request is based on typical documents that a generic plant might have. As
such, this document request is not meant to imply that any specific plant is required to have
all of the listed documents. In addition, your plant-specific document titles may vary from the
document titles listed below.
The following information is requested by February 26, 2024, or sooner, to facilitate the
sample selections.
Documents requested, if available:
1.
List of 50.65 (a)(1) SSCs from the past 5 years;
2.
List of maintenance rule functional failures (including preventable failures) from the
past 5 years;
3.
Most recent evaluation of maintenance effectiveness required per 10 CFR 50.65(a)(3);
4.
Maintenance rule scoping and performance criteria document;
5.
List of preventative maintenance deferrals and preventative maintenance change
requests in the last 5 years;
6.
Equipment reliability characterization and preventative maintenance program
procedures
7.
List of Title 10 CFR 21 Reports applicable to the site from the past 5 years;
8.
Site-specific corrective actions associated with component failures, or tagged with
aging, age-related, wear, accelerated wear, abnormal wear, accelerated
degradation, abnormal degradation, corrosion, degradation, etc.;
9.
List of technical specification operability determinations from the past 5 years;
10.
List of risk-significant long-lived passive SSCs (for licensees in the period of extended
operation (PEO));
11.
Aging management programs (AMPs) and any plant-specific or industry operating
experience reviews that have been used to update aging management activities
(for licensees in the period of extended operation);
3
12.
List of top 100 most risk-significant structures and components. If possible, designate
the component as active or passive in the risk ranking;
13.
Site-specific probabilistic risk assessment (PRA) identifying risk-significant functions;
14.
Technical specifications and technical requirements manual, including applicable
bases documents;
15.
List of systems (system numbers/designators and corresponding names).
B. Information Requested for Selected Samples:
The team lead will identify samples (i.e., structures and components) after the information
gathering visit. The documents and information requested below should generally be
made available to the inspection team for the teams use both onsite and offsite during the
inspection. Electronic format is the preferred media. If electronic media is made available
via an internet based remote document management system, then the remote document
access should allow inspectors to download, save, and print the documents in the NRCs
regional office. Electronic media on compact disc or paper records (hardcopy) are
acceptable. At the end of the inspection, the documents in the teams possession will not
be retained.
This document request is based on typical documents that a generic plant might have. As
such, this document request is not meant to imply that any specific plant is required to
have all the listed documents. In addition, your plant-specific document titles may vary
from the document titles listed below. We also request that the information provided be
sorted by the list below for each sample.
The following information is requested by April 22, 2024, or sooner, to facilitate the
inspection.
1.
List of corrective action documents for the last 10 years;
2.
Maintenance, surveillance, testing, inspection, and condition monitoring testing
requirements, acceptance criteria, and periodicities;
3.
Bases documents associated with maintenance, surveillance, testing, inspection, and
condition monitoring testing requirements, acceptance criteria, and periodicities;
4.
Last 2 years of maintenance, surveillance, testing, inspection, and condition monitoring
testing results; for periodicities greater than 2 years, the last two test results;
5.
Self-imposed and vendor recommendations;
6.
If available,
a)
Equipment reliability category/characterization (e.g., non-critical,
run-to-maintenance, etc.);
b)
Preventative maintenance templates for the maintenance strategy;
4
c)
System design-basis documents and the specific updated final safety analysis
report section that describes the function;
d)
P&IDs and electrical one-line drawings;
e)
Control circuit drawings;
f)
Design/procurement specifications;
g)
List of applicable modifications for the component.