July 28, 2015, Summary of Ublic Meeting with NextEra Energy Point Beach, LLC, to Discuss a Proposed Licensing Basis Change for the Turbine-Driven Auxiliary Feedwater Pumps at the Point Beach Nuclear Plant, Units 1 and 2
ML15217A331
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/26/2015
From: Mahesh Chawla
Plant Licensing Branch III
To:
Chawla M
References
TAC MF6428, TAC MF6429
Download: ML15217A331 (4)


Text

LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF JULY 28, 2015, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS PROPOSED CHANGES TO THE LICENSING BASIS FOR THE TURBINE-DRIVEN AUXILIARY FEEDWATER PUMPS AT THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MF6428 AND MF6429)

On July 28, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of this meeting was for NextEra to discuss with the NRC staff a proposed license amendment request to cross-tie the turbine-driven auxiliary feedwater (TDAFW) pumps between Units 1 and 2 at the Point Beach Nuclear Plant. Prior to the meeting, the licensee submitted slides that would outline their presentation. The slides are available on the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15203A507, and were also provided with the meeting notice.

The meeting notice and agenda, dated July 8, 2015, are available at ADAMS Accession No. ML15190A280. A list of the meeting attendees is enclosed.

During the meeting, the licensee discussed each of the slides in its presentation. The NRC staff asked numerous clarification questions during the presentation. After the presentation, NextEra staff indicated that the TDAFW cross-tie, if approved by the NRC, would be used with the current licensing basis. The ability to cross-tie would also provide an added risk benefit and improve redundancy in decay heat removal.

No regulatory decisions or commitments were made during the meeting. There were no members of the public in attendance, physically or via the bridgeline. The NRC staff received no meeting feedback forms.

Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.Chawla@nrc.gov.

?lvJh~

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES JULY 28, 2015, PUBLIC MEETING NEXTERA ENERGY POINT BEACH, LLC REGARDING POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST ASSOCIATED WITH THE CROSS-TIE OF TURBINE-DRIVEN AUXILIARY FEEDWATER PUMPS Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Reactor Mahesh Chawla Project Manager (PM)

Licensing (DORL)

Jay Schafler Student Engineer (SE)

David Pelton Branch Chief (BC)

Ed Miller PM Division of Safety Systems (DSS) Greg Casto BC, Balance of Plant Branch (SBPB)

Rob Elliot BC, Tech Spec Branch (STSB)

Matthew Hamm Reactor Systems Engineer (STSB)

Larry Wheeler Tech. Reviewer (SBPB)

Khaleel Muhammed SE NextEra Energy Point Beach, LLC Point Beach Nuclear Plant William A. Cross Fleet Regulatory Programs Manager Mike Millen Regulatory Projects Manaaer Bryan Woyak Licensing Manager Anil Julka Fleet Risk and Reliability Manager Phone Participants NRC Region 3 Dave Oliver Senior Resident Inspector NRC Region 3 John Rutkowski Project Engineer DORL Joel Wiebe Senior PM Engineering Planning & Paul Colman Technical Manager Management, Inc. (EPM)

EPM Rocky Kreider Senior Technical Manager Enclosure

ML15217A331 *concurrence provided via e-mail OFFICE NRR/DORL/LPL3-1 /PM N RR/DORL/LPL3-1 /LA NRR/DSS/SBPB/BC NAME MChawla MHenderson GCasto DATE 8/20/2015 8/25/2015 8/20/2015 OFFICE NRR/DSS/STSB/BC N RR/DORL/LPL3-1 /BC N RR/DORL/LPL3-1 /PM NAME RElliott DPelton MChawla DATE 8/03/2015 8/26/2015 8/26/2015