IR 05000266/2023003

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000266/2023003 and 05000301/2023003
ML23286A283
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/16/2023
From: Karla Stoedter
NRC/RGN-III/DORS/RPB2
To: Durbin M
Point Beach
References
IR 2023003
Download: ML23286A283 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT-INTEGRATED INSPECTION REPORT 05000266/2023003 AND 05000301/2023003

Dear Michael Durbin:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On October 11, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Karla K. Stoedter, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000266 and 05000301

License Numbers: DPR-24 and DPR-27

Report Numbers: 05000266/2023003 and 05000301/2023003

Enterprise Identifier: I-2023-003-0056

Licensee: NextEra Energy Point Beach, LLC

Facility: Point Beach Nuclear Plant

Location: Two Rivers, WI

Inspection Dates: July 01, 2023 to September 30, 2023

Inspectors: J. Cassidy, Senior Health Physicist J. Masse, Project Engineer V. Petrella, Senior Resident Inspector M. Stafford, Senior Resident Inspector

Approved By: Karla K. Stoedter, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On September 19, 2023, the unit began coastdown for the upcoming refueling outage. At the end of the inspection period, Unit 1 was operating at 93 percent power

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather with scattered thunderstorms moving through the area on September 6, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire zones 300, 316, and 317 on July 28, 2023
(2) Fire zones 320, 321, 323, and 324 on July 28, 2023
(3) Fire zone 322 on July 28, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the TS 83, Emergency Diesel Generator G-03 Monthly, on August 27, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated training in the simulator on July 26, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 elevated risk due to 2ICP 02.001BL, Reactor Protection and Engineered Safety Features Blue Channel Analog Surveillance Test, on June 26, 2023.
(2) Unit 2 elevated risk due to 2ICP 13.016G, Reactor Protection and Safeguards Analog Racks Feedwater Flow 18 Month Calibration, on July 24, 2023.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Functionality assessment for an unexplained loss of waste gas
(2) Operability of diesel generator G-04 with cycling fuel oil pump
(3) Operability of diesel generator G-02 following failure of fuel oil pump relay
(4) Operability determination of the entry into AOP-12A, Oil, Hazardous Material and Radioactive Materials Spill
(5) Operability determination of a podium in the control room on August 18, 2023
(6) Operability determination of a rod drop alarm on August 22, 2023
(7) Operability determination for the spiking low of the white pressurizer pressure channel on August 27, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (2 Samples)

(1) 0-PT-FP-002, "Diesel Engine-Driven Fire Pump Functional Test," after maintenance on the system on July 27, 2023.
(2) 0-SOP-SW-107, "Service Water Pump Operation," after maintenance on the control switch on July 17, 2023.

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) Quarterly and annual surveillance of Z-2001B portable 480VAC generator, on July 7, 2023.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) NRC pre-exercise emergency preparedness drill conducted on July 11,

RADIATION SAFETY

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage,

& Transportation

Radioactive Material Storage (IP Section 03.01)

The inspectors evaluated the licensees performance in controlling, labeling and securing the following radioactive materials:

(1) Sea-van containers in Warehouse 7
(2) Sea-van containers in the RCA Yard
(3) Contaminated components in the Mausoleum

Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:

(1) ALPS unit
(2) Resin processing equipment

Waste Characterization and Classification (IP Section 03.03) (3 Samples)

The inspectors evaluated the following characterization and classification of radioactive waste:

(1) 2022 Primary Resin
(2) 2023 Class A Resin
(3) 2022 Spent Fuel Pool

Shipping Records (IP Section 03.05) (3 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1) Shipment 23-024; UN3321; Low Specific Activity LSA-II
(2) Shipment 22-047; UN2913; Surface Contaminated Objects SCO-II and UN2915; Type A package
(3) Shipment 22-017; UN2916; Type B(U) package

OTHER ACTIVITIES-BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2022 through June 30, 2023)
(2) Unit 2 (July 1, 2022 through June 30, 2023)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2022 through June 30, 2023)
(2) Unit 2 (July 1, 2022 through June 30, 2023)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (October 1, 2022 through June 30, 2023)
(2) Unit 2 (October 1, 2022 through June 30, 2023)

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)

(1) Unit 1 (July 1, 2022 through June 30, 2023)
(2) Unit 2 (July 1, 2022 through June 30, 2023)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) April 1, 2022 through June 30, 2023

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) July 1, 2022 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 11, 2023, the inspectors presented the integrated inspection results to Michael Durbin, Site Vice President, and other members of the licensee staff.
  • On August 11, 2023, the inspectors presented the radiation protection inspection results to Michael Durbin, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Corrective Action 02466347 Housekeeping in Plant Yard 09/06/2023

Documents

Resulting from

Inspection

Procedures AOP-13C Severe Weather Conditions 53

71111.05 Corrective Action 02463399 NRC Identified Ladder Not in Proper Storage Area 07/28/2023

Documents 02463684 PFP-1-TB 26 - Pre-Fire Plan Unit 1 Turbine Hall Building Ele08/02/2023

Resulting from 02463686 PFP-1-TB 44 - Pre-Fire Plan Unit 1 Turbine Hall Building Ele08/02/2023

Inspection 02463800 NRC Walkdown of PFP-1-TB 26 and 44 08/03/2023

Procedures PFP-1-TB 26 Pre-Fire Plan Unit 1 Turbine Hall Building Elev 26 ft 2

PFP-1-TB 44 Pre-Fire Plan Unit 1 Turbine Hall Building Elev 44 ft 1

71111.11Q Corrective Action 02465633 NRC Resident Observation of TS-83, G03 Monthly 08/27/2023

Documents

Resulting from

Inspection

71111.13 Corrective Action 02461397 Risk Mitigating Plans 06/30/2023

Documents

Resulting from

Inspection

Miscellaneous Work Activity Risk Management Plan for 2ICP 13.016G,

Reactor Protection & Safeguards Analog Racks Feedwater

Flow 18-Month Calibration

Work Activity Risk Management Plan for the 2ICP 02.001BL,

Reactor Protection and Engineered Safety Features Blue

Channel Analog Surveillance Test

71111.15 Corrective Action 02462027 Unexplained Loss of Waste Gas 07/10/2023

Documents 02463453 G-04 EDG Fuel Oil Pump 07/30/2023

2463454 C-82 G-04 EDG Control Panel Relay Cycling 07/30/2023

2463455 P-209B G-04 EDG DC Fuel Oil Pump Cycling Affect 07/30/2023

2463456 Common Cause Evaluation 07/30/2023

2463926 Received 2C04 2A 4-7 Power Range Rod Drop Alarm 08/05/2023

2464975 1PT-430 Pressurizer Pressure Channel Failure 08/19/2023

Inspection Type Designation Description or Title Revision or

Procedure Date

2465629 5 Quart Oil Spill Outside Protected Area 08/27/2023

2466593 G-02-42/FTC2 G-02 FO Pump #2 Relay Failed 09/10/2023

2466594 G-02 EDG OM 3.27 Comp Actions 09/10/2023

Corrective Action 02462807 NRC Question 07/20/2023

Documents 02465484 U1 PZR Pressure Troubleshooting Recorder Installation 08/24/2023

Resulting from

Inspection

Procedures OI 168 Emergency Diesel Generator Operability 31

TS 82 Emergency Diesel Generator G-02 Monthly 98

71111.24 Corrective Action 02464359 0-PT-FP-002 - Diesel Engine-Driven Fire Pump Functional 08/11/2023

Documents Test

Corrective Action 02464286 RMP Cover Sheet Missing Signature 08/10/2023

Documents 02464318 NRC Identified Issue 08/10/2023

Resulting from

Inspection

Procedures 0-SOP-FLEX-002 FLEX Portable 480 VAC Generator Operation 6

Z-2001A & Z-2001B

Work Orders 40829153-04 P-032A, Operations PMT / RTS 07/25/2023

40829153-05 P-32A-CS, Cycle and Test Control Switch 07/17/2023

40845460 0-SOP-FLEX-002/Z-2001A and B Annual Run 07/07/2023

40846184 0-SOP-FLEX-002/Z-2001A and B Quarterly Run 07/07/2023

40846916-04 1B52-10C; Perform Breaker Swap Using a Prepared Spare 07/17/2023

40846916-05 1B52-10C; OPS PMT / RTS 07/17/2023

40848679-01 P-035B-E 4 Year Maintenance 07/27/2023

40848679-02 P-035B-E Operations PMT/RTS 07/27/2023

40850395-01 FP-00222C: Open and Inspect Check Valve 07/25/2023

40850395-02 FP-00222C: OPS PMT/RTS 07/27/2023

71114.06 Procedures AOP-29 Security Threat 31

EPIP 1.1 Course of Actions 87

EPIP 2.1 Notifications - ERO, State and Counties, and NRC 64

71124.08 Corrective Action A/R 01461409 Fixed Contamination Found in RCA Yard North Side 07/27/2023

Documents A/R 02402072 Receipt New Fuel from Vendor, Contamination Above DOT 09/01/2021

Limit

Inspection Type Designation Description or Title Revision or

Procedure Date

A/R 02408019 Water Found Leaking Out of Westinghouse Sludge Lance 11/04/2021

Sealand

A/R 02461634 Unexpected Alpha Level 3 Conditions 07/19/2023

Corrective Action A/R 02462493 Part 37 Training CBTs Require Updating 08/10/2023

Documents A/R 02464294 NUC RPT 1030 Update Needed 08/10/2023

Resulting from A/R 02464295 NUC SEC 006 Update Needed 08/10/2023

Inspection

Miscellaneous HP-100-022822 2022 Primary Resin 10CFR61 Analysis 03/07/2022

HP-100-060223 2023 Class A Resin 10CFR61 Analysis 06/03/2023

HP-100-062422 2022 SFP 10CFR61 Analysis 06/24/2022

NUC RPT 1030 10CFR37 Cat 1 & 2 Rad Material 1

NUC SEC 006 Annual Part 37 Security Training 2

Procedures RDW 18.1.1 10 CFR 61 Sampling Program 6

RDW 18.2 Radwaste Classification, Shipment Types and Waste Stability 3

Determination

RP-AA-107 Radioactive Material Control Program 4

RP-AA-107-1002 Requirements for Radioactive Material Stored Outdoors 10

RP-AA-107-1004 Procedure for Radioactive Source Controls and Leak 6

Checking

Self-Assessments A/R 02464019 Radioactive Solid Waste Processing and Radioactive 08/01/2023

Handling, Storage, and Transportation (IP71124.08)

Shipping Records Shipment 22-017 Primary Resins; UN2916; Type B(U) Package 03/09/2022

Shipment 22-047 Fuel Cleaning Equipment; UN2913 and UN2915 06/24/2022

Shipment 23-024 Resins, UN3321, LSA-II 06/06/2023

Work Orders 40794916 01 Perform Leak Testing of Radioactive Sealed Sources in 07/27/2022

Accordance with RP-AA-107-1004

40811825 01 Perform an Inventory of Radioactive Sources in Accordance 07/27/2022

with RP-AA-107-1004 (TSR 3.7.4.1)

40823107 01 Perform Leak Testing of Radioactive Sealed Sources in 02/01/2023

Accordance with RP-AA-107-1004

71151 Miscellaneous NP 5.2.16 - Attachment B; PI Data Calculation, Review and Approval 04/01/2022 -

Occupational 06/30/2023

Exposure

Effectiveness

Inspection Type Designation Description or Title Revision or

Procedure Date

NP 5.2.16 - Attachment B; PI Data Calculation, Review and Approval 07/01/2022 -

ODCM 06/30/2023

Radioactive

Effluents

Effectiveness

NP 5.2.16 - RCS NP 5.2.16 - RCS Activity Fuel Performance 07/01/2022 -

Activity Fuel 06/30/2023

Performance

Procedures LI-AA-100-10003 NRC Performance Indicator 4

NP 5.2.16 NRC Performance Indicators 23

PBN-BFJR-18-MSPI Basis Document for PBNP 28

054

11