UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 7, 2016 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 On May 25, 2016, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2015 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML16112A400.
The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 2, 2016, End-of-Cycle Assessment letter, ML16060A482. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2015 performance can be found in ADAMS under ML16154A677. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML16119A045, the August 2015 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML15254A321 and a copy of Point Beach Supplemental Inspection reports 05000266/2015006 and 05000301/2015006, ML16060A482. During the open house, a member of the public, discussed with NRC personnel how Point Beach is responding to the order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
/RA/___________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
List of Attendees cc: Distribution via LISTSERV
LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 On May 25, 2016, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2015 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agency wide Documents Access and Management System (ADAMS) as ML16112A400.
The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 2, 2016, End-of-Cycle Assessment letter, ML16060A482. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2015 performance can be found in ADAMS under ML16154A677. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML16119A045, the August 2015 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML15254A321 and a copy of Point Beach Supplemental Inspection reports 05000266/2015006 and 05000301/2015006, ML16060A482. During the open house, a member of the public, discussed with NRC personnel how Point Beach is responding to the order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
/RA/___________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
List of Attendees cc: Distribution via LISTSERV DISTRIBUTION:
See next page ADAMS Accession Number: ML16160A174 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII NAME LAlvarado:bw JCameron DATE 06/06/16 06/07/16 OFFICIAL RECORD COPY
Memorandum from Jamnes Cameron dated June 7, 2016
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ROPassessment.Resource@nrc.gov
LIST OF ATTENDEES MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 U.S. Nuclear Regulatory Commission, Region III Division of Reactor Projects Division Name Title REGION III Division of Jamnes Cameron Chief, Branch 4 Reactor Projects (DRP) and Division Reactor Safety (DRS)
David Oliver Senior Resident Inspector Kevin Barclay Resident Inspector Kenneth OBrien Director, DRS NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Ron Seizert Emergency Preparedness Manager Mike Millen Regulatory Projects Lori Christensen Acting Licensing Manager Rob Harrsch Engineering Director Robert Coffey Site Vice President Dan Deboer Plant Manager Members of the Public Wisconsin Public Radio Chuck Quirmbach Milwaukee Reporter (WPR)
LICENSEE: NextEra Energy Point Beach, LLC
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 7, 2016 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 On May 25, 2016, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2015 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML16112A400.
The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 2, 2016, End-of-Cycle Assessment letter, ML16060A482. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2015 performance can be found in ADAMS under ML16154A677. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML16119A045, the August 2015 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML15254A321 and a copy of Point Beach Supplemental Inspection reports 05000266/2015006 and 05000301/2015006, ML16060A482. During the open house, a member of the public, discussed with NRC personnel how Point Beach is responding to the order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
/RA/___________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
List of Attendees cc: Distribution via LISTSERV
LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 On May 25, 2016, from 6:00 p.m. to 7:30 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the open house was to provide the public with information on the 2015 End-of-Cycle plant performance assessment of the Point Beach Nuclear Plant and with general information on the NRC. The outreach was held at the Lester Public Library in Two Rivers, WI. The NRC meeting notice for this open house can be found in the Agency wide Documents Access and Management System (ADAMS) as ML16112A400.
The NRC personnel provided discussions related to the NRCs assessment of the Point Beach Nuclear Plant performance, which was documented in the March 2, 2016, End-of-Cycle Assessment letter, ML16060A482. As part of the open house, both NRC and NextEra representatives were available to address questions and concerns. Slides used to describe the NRCs Reactor Oversight Process and Point Beach Nuclear Plant 2015 performance can be found in ADAMS under ML16154A677. In addition to the slides, members of the NRC made available a brochure on the Reactor Oversight Process, NUREG/Br-0508, ML16119A045, the August 2015 edition of the NRC Information Digest, NUREG-1350, Volume 26, ML15254A321 and a copy of Point Beach Supplemental Inspection reports 05000266/2015006 and 05000301/2015006, ML16060A482. During the open house, a member of the public, discussed with NRC personnel how Point Beach is responding to the order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
/RA/___________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
List of Attendees cc: Distribution via LISTSERV DISTRIBUTION:
See next page ADAMS Accession Number: ML16160A174 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII NAME LAlvarado:bw JCameron DATE 06/06/16 06/07/16 OFFICIAL RECORD COPY
Memorandum from Jamnes Cameron dated June 7, 2016
SUBJECT:
SUMMARY
OF MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ROPassessment.Resource@nrc.gov
LIST OF ATTENDEES MAY 25, 2016, PUBLIC MEETING WITH NEXTERA ENERGY POINT BEACH, LLC TO DISCUSS THE 2015 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 U.S. Nuclear Regulatory Commission, Region III Division of Reactor Projects Division Name Title REGION III Division of Jamnes Cameron Chief, Branch 4 Reactor Projects (DRP) and Division Reactor Safety (DRS)
David Oliver Senior Resident Inspector Kevin Barclay Resident Inspector Kenneth OBrien Director, DRS NextEra Energy Point Beach, LLC Point Beach Nuclear Plant Ron Seizert Emergency Preparedness Manager Mike Millen Regulatory Projects Lori Christensen Acting Licensing Manager Rob Harrsch Engineering Director Robert Coffey Site Vice President Dan Deboer Plant Manager Members of the Public Wisconsin Public Radio Chuck Quirmbach Milwaukee Reporter (WPR)