January 2005 Monthly Operating Report for Nine Mile Point Units 1 and 2
ML050610027
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/10/2005
From: O'Connor T
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMPIL 1924
Download: ML050610027 (3)


Text

Constellation Nuclear February 10, 2005 NMPIL 1924 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 Monthly Operating Report for January 2005 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for January 2005 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

TJO/TM/sac Attachments cc: Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

-2,1

U1 OPERATING DATA REPORT DOCKET NO. 50-220 UNIT NAME Nine Mile Point I DATE February 03, 2005 COMPLETED BY Bruce L Eastman TELEPHONE 315 349 2559 REPORTING PERIOD: January 2005

1. Design Electrical Rating 613.00
2. Maximum Dependable Capacity (MWe-Net) 565.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00- 744.00 221,906.92
4. Number of Hours Generator On-line 744.00 744.00 217,241.97
5. Reserve Shutdown Hours 0.00 0.00 20.40
6. Net Electrical Energy Generated (MWHrs) 459,862.00 459,862.00 121,744,827.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of January 2005 with a Net Electrical Design capacity factor of 100.8 percent.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1of 2

A OPERATING DATA REPORT DOCKET NO. 50-410 UNIT NAME Nine Mile Polnt 2 .

DATE February 07, 2005 COMPLETED BY Thomas P. McMahon TELEPHONE 3151349-4045 REPORTING PERIC January 2005

1. Design Electrical Rating 1,143.30
2. Maximum Dependable Capacity (MWe-Net) 1,119.80 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 744.00 119,834.72
4. Number of Hours Generator On-line 744.00 744.00 116,837.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 858,901.00 858,901.00 123,545,083.6 UNIT SHUTDOWNS Type Method of F: Forced Duration s hutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 103.09% and an availability factor of 100% for the month of January 2005. On January 15 2005 at 0801 hours0.00927 days <br />0.223 hours <br />0.00132 weeks <br />3.047805e-4 months <br />, Operations commenced a downpower to approximately 55% power for a feed pump swap. After completion of this feed pump swap, the unit was returned to full power at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br /> the same day. There were no challenges to the safety relief valves during this reporting period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 2 of 2