IR 05000250/2016005

From kanterella
Revision as of 15:38, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005
ML16244A285
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2016
From: Ladonna Suggs
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2016005
Download: ML16244A285 (6)


Text

UNITED STATES August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - NRC INSPECTION REPORT 05000250/2016005 AND 05000251/2016005

Dear Mr. Nazar:

On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Turkey Point Nuclear Generating Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)

safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4539 with any questions you have regarding this letter.

Sincerely,

/RA/

LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure:

Turkey Point Inspection/Activity Plan (09/01/2016 - 06/30/2018)

cc: Distribution via Listserv

__________________ __ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - NRC INSPECTION REPORT 05000250/2016005 AND 05000251/2016005 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Turkey Point 08/31/2016 07:01:43 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL LICENSE EXAM 3 3 08/22/2016 09/02/2016 V23476 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 3, 4 10/31/2016 11/04/2016 IP 7111105T Fire Protection [Triennial]

3, 4 11/28/2016 12/02/2016 IP 7111105T Fire Protection [Triennial]

HS - TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 11/28/2016 12/02/2016 IP 7111107T Heat Sink Performance RP - RP PUBLIC RAD SAFETY BASELINE 2 3, 4 12/12/2016 12/16/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 12/12/2016 12/16/2016 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 12/12/2016 12/16/2016 IP 71151 Performance Indicator Verification EP - EP EXERCISE 6 3, 4 02/20/2017 02/24/2017 IP 7111401 Exercise Evaluation 3, 4 02/20/2017 02/24/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/20/2017 02/24/2017 IP 7111408 Exercise Evaluation - Scenario Review 3, 4 02/20/2017 02/24/2017 IP 71151 Performance Indicator Verification ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 04/03/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 3 SG IN-SERVICE INSPECTION 1 3 04/10/2017 04/14/2017 IP 7111108P Inservice Inspection Activities - PWR CDBI - COMPONENT DESIGN BASIS INSPECTION 7 3, 4 06/26/2017 06/30/2017 IP 7111121 Component Design Bases Inspection 3, 4 07/17/2017 07/21/2017 IP 7111121 Component Design Bases Inspection 3, 4 07/31/2017 08/04/2017 IP 7111121 Component Design Bases Inspection 3, 4 08/14/2017 08/18/2017 IP 7111121 Component Design Bases Inspection OL RQ - REQUAL INSPECTION 2 3, 4 09/18/2017 09/22/2017 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL LICENSE EXAM PREP 3 3 09/25/2017 09/29/2017 V23492 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 4 IN-SERVICE INSPECTION 1 4 10/09/2017 10/13/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Turkey Point 08/31/2016 07:01:43 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 10/16/2017 10/20/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 10/16/2017 10/20/2017 IP 71124.04 Occupational Dose Assessment 3, 4 10/16/2017 10/20/2017 IP 71124.05 Radiation Monitoring Instrumentation 3, 4 10/16/2017 10/20/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 4 SG IN-SERVICE INSPECTION 1 4 10/16/2017 10/20/2017 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL LICENSE EXAM 3 3 10/23/2017 11/10/2017 V23492 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 3, 4 11/13/2017 11/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 11/13/2017 11/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 11/13/2017 11/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 11/13/2017 11/17/2017 IP 71124.04 Occupational Dose Assessment 3, 4 11/13/2017 11/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 3, 4 11/13/2017 11/17/2017 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 3 3, 4 01/22/2018 01/26/2018 IP 7111402 Alert and Notification System Testing 3, 4 01/22/2018 01/26/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3, 4 01/22/2018 01/26/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 01/22/2018 01/26/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 01/22/2018 01/26/2018 IP 71151 Performance Indicator Verification RP - RP PUBLIC INSPECTION 2 3, 4 01/29/2018 02/02/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 01/29/2018 02/02/2018 IP 71124.07 Radiological Environmental Monitoring Program 3, 4 01/29/2018 02/02/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 3, 4 01/29/2018 02/02/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences MODS - PLANT MODIFICATIONS INSPECTION 3 3, 4 01/29/2018 02/02/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 3, 4 02/12/2018 02/16/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure