|
---|
Category:Inspection Plan
MONTHYEARIR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) ML23159A0852023-06-0909 June 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22196A0722022-07-19019 July 2022 Notification of an NRC Fire Protection Team Inspection and Request for Information IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) ML21196A1042021-07-15015 July 2021 Notification of Supplemental Inspection (95001) and Request for Information ML21182A1912021-07-0101 July 2021 Requalification Program Inspection - Turkey Point Nuclear Plant, Units 3 and 4 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19346G7212019-12-12012 December 2019 Radiation Safety Baseline Inspection RFI 2020-001 ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000250/20190052019-08-27027 August 2019 Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2019005 and 05000251/2019005) ML19137A0452019-05-17017 May 2019 Heat Sink RFI 2019003 IR 05000250/20180062019-03-0404 March 2019 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Unit 3 and 4 - Report 05000250/2018006 and 05000251/2018006, Report 05000250/2018402 and 05000251/2018402, Report 05000250/2018501 and 05000251/2018501 ML19057A0932019-02-26026 February 2019 RP RFI Notification ML19030A7652019-01-23023 January 2019 Tp U4 ISI RFI ML18219A6562018-08-0707 August 2018 Baseline Inservice Inspection Initial Information Request ML18059A0282018-02-28028 February 2018 EOC Assessment Letter Final ML17111A7482017-04-18018 April 2017 Requalification Program Inspection - Turkey Points 3 and 4 IR 05000250/20160062017-03-0101 March 2017 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Units 3 and 4 (Report 05000250/2016006 and 05000251/2016006) IR 05000250/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005 ML16064A0632016-03-0303 March 2016 Turkey Point Nuclear Generating Station - Notification of Inspection and Request for Information ML16041A1282016-02-10010 February 2016 U-4 ISI 2016002 RFI as IR 05000250/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Units 3 & 4 (Report 05000250/2015005 and 05000251/2015005) IR 05000051/20140012015-03-0404 March 2015 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4, (Report 05000250/2014001 and 0500051/2014001) ML14245A1862014-09-0202 September 2014 Mid-Cycle Ltr 2014 L-2014-073, Inservice Inspection Plan Relief Request No. 142014-03-14014 March 2014 Inservice Inspection Plan Relief Request No. 14 IR 05000250/20130012014-03-0404 March 2014 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4 (Report 05000250/2013001 and 05000251/2013001) ML13246A1002013-09-0303 September 2013 Mid-Cycle Assessment Letter IR 05000250/20120012013-03-0404 March 2013 Annual Assessment Letter for Turkey Point Nuclear Plant, Units 3 & 4 (IR 05000250-12-001 and 05000251-12-001) ML13022A5712013-01-22022 January 2013 Notification of Inspection and Request for Information ML12248A2022012-09-0404 September 2012 Mid Cycle Assessment Letter Turkey Point 2012 ML1206502742012-03-0505 March 2012 EOC Report 22 ML1124403682011-09-0101 September 2011 Report 22 - Turkey Point ML1106302102011-03-0404 March 2011 Inspection/Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024408162010-09-0101 September 2010 Report 22 - 2010 Mid-Cycle, Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006206272010-03-0303 March 2010 Report 22 - 201001, Inspection/Activity Plan ML0924404362009-09-0101 September 2009 Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010 ML0906306152009-03-0404 March 2009 Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010 ML0824610222008-09-0202 September 2008 Inspection/Activity Plan, 09/01/2008 - 12/31/2009, Report 22 ML0724305032007-08-31031 August 2007 Inspection/Activity Plan 09/01/2007-03/31/2009 ML0706000422007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 ML0624302952006-08-30030 August 2006 Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07 IR 05000250/20060012006-03-0202 March 2006 Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001) 2024-02-28
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company 700 Universe Blvd Mail Stop: EX/JB Juno Beach, FL 33408
SUBJECT:
TURKEY POINT UNITS 3 & 4 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Mr. Coffey:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Turkey Point Units 3 & 4 during the weeks of July 31-August 4, 2023, and August 14-18, 2023.
The inspection team will be led by Mr. Jeff Hamman, a Senior Project Engineer from the NRCs Region II office. This inspection will be conducted in accordance with baseline inspection procedure (IP) 71152, Problem Identification and Resolution, issued December 14, 2021.
The biennial PI&R inspection and assessment of Turkey Points corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
On June 5, 2023, Mr. Hamman confirmed the arrangements for the two-week inspection with Mr. Stoia, Licensing/Emergency Preparedness Engineer at Turkey Point.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than July 14, 2023. Contact Mr. Hamman with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. If additional documents are needed, they will be requested when identified.
Prior to the on-site inspection, Mr. Hamman will discuss with your staff, the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
June 9, 2023 B. Coffey 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Hamman at (404) 997-4573 or the resident inspectors.
Sincerely, David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250 and 05000251 License No.: DPR-31 and DPR-41
Enclosure:
Information Request for the Turkey Point Units 3 & 4 PI&R Inspection cc: Distribution via ListServ PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Hamman, Jeffrey signing on behalf of Dumbacher, David on 06/09/23
ML23159A085 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available
OFFICE RII/DRP RII/DRP NAME J. Hamman D. Dumbacher/J. Hamman for DATE 06/06/23 06/09/23
INFORMATION REQUEST FOR TURKEY POINT UNITS 3 & 4 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JULY 31-AUGUST 4, 2023 AND AUGUST 14-18, 2023)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since March 1, 2021. Please provide the requested documents in electronic format.
If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
- 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the CAP. This should include procedures related to:
a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral process k) Work management (i.e., work orders and requests)
If any of the procedures requested above were revised after March 1, 2021, please provide (or have available) copies of all revisions during the on-site inspection.
- 2. Please provide by July 7, 2023, a list of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
- 3. List of all Condition Reports (CRs) initiated, including the following information for each CR:
a) CR number and initiation date b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) CR status
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.
CR # Initiation Problem Priority System Component Org Status Date CR001 1/1/2021 A RHR Pump 2 RHR 2-RHR-PMP-ENG Open failed flow A
Enclosure
- 4. List of outstanding corrective actions including the following information for each action:
a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)
c) Brief, but complete corrective action description d) Associated CR number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Corrective action status
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.
Corrective Type Description CR System Initiation Extensions Due Status Action # Date Date 001 CAPR Revise CR0058 RHR 01/05/22 2 06/15/23 Awaiting Procedure review NGK-003-4585
- 5. List of control room deficiencies with a brief, but complete description and corresponding CR and/or work order (WO) number
- 6. List of operator workarounds and operator burdens with a brief, but complete description and corresponding CR number
- 7. List of all currently extended or overdue CRs, searchable and filtered by system and sorted by initiation date, with the following information:
a) CR number b) Priority or Significance c) CR title and short description
- 8. List of all CRs that have been voided, canceled, or deleted searchable and filtered by system. Provide the following information for each CR:
a) CR number b) Brief, but complete problem description c) Reason voided, canceled, or deleted
- 9. List of all structures, systems, and components which were classified as (a)(1) in accordance with the maintenance rule since March 1, 2021. Include the following information for each system in (a)(1):
a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Copy of the (a)(1) evaluation d) Planned actions and their status
2
- 10. List of Maintenance Preventable Functional Failures (MPFFs) of risk-significant systems, including actions completed and current status.
- 11. List of corrective and deficient maintenance WOs. Include the following information for each WO:
a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed) f) Associated CR (if applicable)
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.
Work Description System Component Initiation Completion Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/21 03/15/22 Closed 2A-BKR-08-BB4 for BKR-08-BB4 2A SI Pump.
- 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Include a cross-reference linking NRC finding numbers and LIVs to appropriate CR numbers.
- 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) submitted. Include a cross-reference linking LER number to appropriate CR number.
- 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OpE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Include the reference number (e.g., CR number) for the documents that evaluated the aforementioned OpE information.
- 15. The last two audits/assessments of the CAP.
- 16. A list of all quality assurance audits and/or assessments issued. Copies of audits/assessments shall be made available as requested by the inspectors.
- 17. A list of all department self-assessments. Copies of assessments shall be made available as requested by the inspectors.
- 18. Copy of the most recent integrated plant trend report, departmental trend reports, and corrective action trend reports, including any human performance and equipment reliability trends
- 19. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available.
3
- 20. List of routine meetings involving the CAP (including, but not limited to CAP screening, maintenance rule, operating experience, etc.) to be held during the on-site inspection weeks.
- 21. List of CRs related to equipment aging issues in the top ten risk-significant systems since March 1, 2018 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification).
Provide the following information for each CR, in a format compatible with spreadsheet software and ensure the list is sortable and searchable:
a) CR number b) CR initiation date c) Priority d) CR problem description
- 22. If performed, provide all recent self-assessment of the site safety culture completed
- 23. Copies of CAP documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
- 24. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description
- 25. Copy of probabilistic risk assessment importance measures report, if available
- 26. Upon notification of system selections, please provide system health reports, system design basis documents, maintenance rule functions and status, and system description information.
4