ML090630615
| ML090630615 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/04/2009 |
| From: | NRC/RGN-II/DRP/RPB3 |
| To: | |
| Shared Package | |
| ML090630606 | List: |
| References | |
| IR-09-001 | |
| Download: ML090630615 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 03/04/2009 07:17:44 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM
- INITIAL EXAM WEEK 2 5
3 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES V23299 03/02/2009 03/06/2009 EB3ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 03/23/2009 03/27/2009 OL EXAM
- INITIAL EXAM PREP 4
3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 07/27/2009 07/31/2009 OL EXAM
- INITIAL EXAM - WEEK 1 4
3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 08/17/2009 08/21/2009 OL EXAM
- INITIAL EXAM - WEEK 2 5
3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 08/31/2009 09/04/2009 PSB1-RP
- RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 10/26/2009 10/30/2009 3, 4 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 3, 4 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 3, 4 IP Performance Indicator Verification 71151 10/26/2009 10/30/2009 EB3ISI
- UNIT 4 INSERVICE INSPECTION 1
4 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/06/2009 EB3SGISI
- UNIT 4 STEAM GENERATOR ISI 1
4 IP Inservice Inspection Activities - PWR 7111108P 11/09/2009 11/13/2009 PSB1-RP
- RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/09/2009 11/13/2009 3, 4 IP Access Control to Radiologically Significant Areas 7112101 11/09/2009 11/13/2009 3, 4 IP ALARA Planning and Controls 7112102 11/09/2009 11/13/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 11/09/2009 11/13/2009 EB1-MODS
- MODIFICATIONS -10CFR50.59 3
3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/30/2009 12/04/2009 3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 12/14/2009 12/18/2009 TFPI 805
- TFPI 5
3, 4 IP Fire Protection [Triennial]
7111105T 01/25/2010 01/29/2010 3, 4 IP Fire Protection [Triennial]
7111105T 02/08/2010 02/12/2010 OL RQ
- REQUAL INSPECTION 2
3, 4 IP Licensed Operator Requalification Program 7111111B 01/11/2010 01/15/2010 PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
3, 4 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 01/11/2010 01/15/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:17:44 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 01/11/2010 01/15/2010 3, 4 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 01/11/2010 01/15/2010 3, 4 IP Performance Indicator Verification 71151 01/11/2010 01/15/2010 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
3, 4 IP Alert and Notification System Testing 7111402 02/15/2010 02/19/2010 3, 4 IP Emergency Response Organization Augmentation Testing 7111403 02/15/2010 02/19/2010 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/15/2010 02/19/2010 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/15/2010 02/19/2010 3, 4 IP Performance Indicator Verification 71151 02/15/2010 02/19/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure