ML120650274
| ML120650274 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/05/2012 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML120650251 | List: |
| References | |
| Download: ML120650274 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 03/05/2012 07:46:28 Report 22 03/01/2012 - 06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point TP-EPU
- TP-EPU 3
3 IP Power Uprate 71004 01/01/2012 07/09/2012 3, 4 IP Power Uprate 71004 04/09/2012 04/13/2012 EB3 LR
- UNIT 3 POST APPROVAL LR - PHASE 1 1
3 IP Post-Approval Site Inspection for License Renewal 71003 02/27/2012 03/02/2012 EB3 ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 03/05/2012 03/09/2012 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 2
3, 4 IP Alert and Notification System Testing 7111402 04/02/2012 04/06/2012 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/02/2012 04/06/2012 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/02/2012 04/06/2012 3, 4 IP Performance Indicator Verification 71151 04/02/2012 04/06/2012 MODS
- MODIFICATIONS INSPECTION 4
3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/16/2012 04/20/2012 3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/30/2012 05/04/2012 EB3 LR
- POST APPROVAL LR INSPECTION - PHASE 2 6
3, 4 IP Post-Approval Site Inspection for License Renewal 71003 05/21/2012 05/25/2012 3, 4 IP Post-Approval Site Inspection for License Renewal 71003 06/04/2012 06/08/2012 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
3, 4 IP Problem Identification and Resolution 71152B 07/16/2012 07/20/2012 3, 4 IP Problem Identification and Resolution 71152B 07/30/2012 08/03/2012 TI-182
- TI-182 BURIED PIPING/TANK - PHASE 1 1
3, 4 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 10/22/2012 10/26/2012 EB3 ISI
- UNIT 4 INSERVICE INSPECTION 1
3, 4 IP Inservice Inspection Activities - PWR 7111108P 11/26/2012 11/30/2012 EB3 LR
- UNIT 4 POST APPROVAL LR - PHASE 1 2
3, 4 IP Post-Approval Site Inspection for License Renewal 71003 11/26/2012 11/30/2012 PSB1-RP
- RADIOLOGICAL HAZARD ASSESSMENT 3
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/10/2012 12/14/2012 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/10/2012 12/14/2012 3, 4 IP Performance Indicator Verification 71151 12/10/2012 12/14/2012 OL EXAM
- INITIAL EXAM PREP 3
3 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES V23393 02/11/2013 02/15/2013 PSB1-RP
- RP OCCUPATIONAL BASELINE 3
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/11/2013 02/15/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/05/2012 07:46:28 Report 22 03/01/2012 - 06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP
- RP OCCUPATIONAL BASELINE 3
3, 4 IP Occupational ALARA Planning and Controls 71124.02 02/11/2013 02/15/2013 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/11/2013 02/15/2013 3, 4 IP Occupational Dose Assessment 71124.04 02/11/2013 02/15/2013 3, 4 IP Radiation Monitoring Instrumentation 71124.05 02/11/2013 02/15/2013 3, 4 IP Performance Indicator Verification 71151 02/11/2013 02/15/2013 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK2 3
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 03/01/2013 3, 4 IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 03/01/2013 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/25/2013 03/01/2013 3, 4 IP Occupational Dose Assessment 71124.04 02/25/2013 03/01/2013 3, 4 IP Radiation Monitoring Instrumentation 71124.05 02/25/2013 03/01/2013 3, 4 IP Performance Indicator Verification 71151 02/25/2013 03/01/2013 OL EXAM
- INITIAL EXAM - WEEK 1 3
3 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES V23393 03/04/2013 03/08/2013 OL EXAM
- INITIAL EXAM - WEEK 2 3
3 TURKEY POINT/MARCH 2013 INITIAL EXAM AT POWER FACILITIES V23393 03/11/2013 03/15/2013 TP TFPI
- TP - TRIENNIAL FIRE PROTECTION INSP 4
3, 4 IP Fire Protection [Triennial]
7111105T 05/21/2013 05/23/2013 3, 4 IP Fire Protection [Triennial]
7111105T 06/10/2013 06/14/2013 3, 4 IP Fire Protection [Triennial]
7111105T 06/24/2013 06/28/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure