ML092440436

From kanterella
Jump to navigation Jump to search
Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010
ML092440436
Person / Time
Site: Turkey Point  
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440410 List:
References
Download: ML092440436 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 08:14:31 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM

- INITIAL EXAM - WEEK 2 5

3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 08/31/2009 09/04/2009 PSB1-RP

- RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 3, 4 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 3, 4 IP Performance Indicator Verification 71151 10/26/2009 10/30/2009 EB3ISI

- UNIT 4 INSERVICE INSPECTION 1

4 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/06/2009 EB3SGISI

- UNIT 4 SG ISI 1

4 IP Inservice Inspection Activities - PWR 7111108P 11/09/2009 11/13/2009 PSB1-RP

- RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/16/2009 11/20/2009 3, 4 IP Access Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 3, 4 IP ALARA Planning and Controls 7112102 11/16/2009 11/20/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 11/16/2009 11/20/2009 TFPI 805

- TFPI 7

3, 4 IP Fire Protection [Triennial]

7111105T 01/25/2010 01/29/2010 3, 4 IP Fire Protection [Triennial]

7111105T 02/08/2010 02/12/2010 OL RQ

- REQUAL INSPECTION 3

3, 4 IP Licensed Operator Requalification Program 7111111B 01/11/2010 01/15/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

3, 4 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 01/11/2010 01/15/2010 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 01/11/2010 01/15/2010 3, 4 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 01/11/2010 01/15/2010 3, 4 IP Performance Indicator Verification 71151 01/11/2010 01/15/2010 EB1-MODS

- MODIFICATIONS -10CFR50.59 3

3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/19/2010 04/23/2010 3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/03/2010 05/07/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

3, 4 IP Alert and Notification System Testing 7111402 02/15/2010 02/19/2010 3, 4 IP Emergency Response Organization Augmentation Testing 7111403 02/15/2010 02/19/2010 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/15/2010 02/19/2010 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/15/2010 02/19/2010 3, 4 IP Performance Indicator Verification 71151 02/15/2010 02/19/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 08:14:31 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

3 IP Identification and Resolution of Problems 71152B 05/03/2010 05/07/2010 3

IP Identification and Resolution of Problems 71152B 05/17/2010 05/21/2010 EB3 HS

- HEAT SINK INSPECTION 1

3, 4 IP Heat Sink Performance 7111107T 08/09/2010 08/13/2010 OL EXAM

- INITIAL EXAM PREP 3

3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 09/27/2010 10/01/2010 PSB1-RP

- RP ACCESS CONTROLS 1

3, 4 IP Access Control to Radiologically Significant Areas 7112101 09/27/2010 10/01/2010 EB3ISI

- UNIT 3 INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/08/2010 OL EXAM

- INITIAL EXAM PREP 7

3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/04/2010 10/08/2010 EB3SGISI

- UNIT 3 SG INSERVICE INSPECTION 1

3 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 OL EXAM

- INITIAL EXAM WEEK 1 6

3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/18/2010 10/22/2010 OL EXAM

- INITIAL EXAM WEEK 3 3

3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 11/15/2010 11/19/2010 OL EXAM

- INITIAL EXAM WEEK 4 3

3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 11/22/2010 11/26/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure