Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010
ML092440436
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440410 List:
References
Download: ML092440436 (2)


Text

Page 1 of 2 Turkey Point 09/01/2009 08:14:31 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM - WEEK 2 5 3 08/31/2009 09/04/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 3, 4 10/26/2009 10/30/2009 IP 7112202 Radioactive Material Processing and Transportation 3, 4 10/26/2009 10/30/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 4 INSERVICE INSPECTION 1 4 11/02/2009 11/06/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 SG ISI 1 4 11/09/2009 11/13/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 11/16/2009 11/20/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 11/16/2009 11/20/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 11/16/2009 11/20/2009 IP 7112102 ALARA Planning and Controls 3, 4 11/16/2009 11/20/2009 IP 7112202 Radioactive Material Processing and Transportation TFPI 805 - TFPI 7 3, 4 01/25/2010 01/29/2010 IP 7111105T Fire Protection [Triennial]

3, 4 02/08/2010 02/12/2010 IP 7111105T Fire Protection [Triennial]

OL RQ - REQUAL INSPECTION 3 3, 4 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 3, 4 01/11/2010 01/15/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3, 4 01/11/2010 01/15/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3, 4 01/11/2010 01/15/2010 IP 71151 Performance Indicator Verification EB1-MODS - MODIFICATIONS -10CFR50.59 3 3, 4 04/19/2010 04/23/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3, 4 05/03/2010 05/07/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3, 4 02/15/2010 02/19/2010 IP 7111402 Alert and Notification System Testing 3, 4 02/15/2010 02/19/2010 IP 7111403 Emergency Response Organization Augmentation Testing 3, 4 02/15/2010 02/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/15/2010 02/19/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/15/2010 02/19/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Turkey Point 09/01/2009 08:14:31 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 05/03/2010 05/07/2010 IP 71152B Identification and Resolution of Problems 3 05/17/2010 05/21/2010 IP 71152B Identification and Resolution of Problems EB3 HS - HEAT SINK INSPECTION 1 3, 4 08/09/2010 08/13/2010 IP 7111107T Heat Sink Performance OL EXAM - INITIAL EXAM PREP 3 3 09/27/2010 10/01/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 1 3, 4 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 7 3 10/04/2010 10/08/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3SGISI - UNIT 3 SG INSERVICE INSPECTION 1 3 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM WEEK 1 6 3 10/18/2010 10/22/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 3 3 11/15/2010 11/19/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 4 3 3 11/22/2010 11/26/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure