ML052420415

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan - 09/01/05 - 03/31/07
ML052420415
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/30/2005
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML052420403 List:
References
Download: ML052420415 (2)


Text

Page 1 of 2 Turkey Point 08/30/2005 08:07:34 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-HS - HEAT SINK 1 3, 4 IP 7111107B Heat Sink Performance 08/29/2005 09/02/2005 Baseline Inspections PS1-RP - RP PREINSPECTION PUBLIC 1 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 01/09/2006 01/11/2006 Baseline Inspections PS2-EP - EP INSP 1 3, 4 IP 7111402 Alert and Notification System Testing 01/23/2006 01/27/2006 Baseline Inspections 3, 4 IP 7111403 Emergency Response Organization Augmentation Testing 01/23/2006 01/27/2006 Baseline Inspections 3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 01/23/2006 01/27/2006 Baseline Inspections 3, 4 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 01/23/2006 01/27/2006 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 01/23/2006 01/27/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 3, 4 IP 7111112B Maintenance Effectiveness 02/06/2006 02/10/2006 Baseline Inspections DRP - PI&R 4 3, 4 IP 71152B Identification and Resolution of Problems 01/30/2006 02/17/2006 Baseline Inspections PS1-RP - RP PUBLIC BASELINE 4 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 02/06/2006 02/10/2006 Baseline Inspections 3, 4 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/06/2006 02/10/2006 Baseline Inspections 3, 4 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/06/2006 02/10/2006 Baseline Inspections 3, 4 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 02/06/2006 02/10/2006 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 02/06/2006 02/10/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 3, 4 IP 7111111B Licensed Operator Requalification Program 02/27/2006 03/03/2006 Baseline Inspections EB3-ISI - U3 INSERVICE INSPECTION 2 3 IP 7111108P Inservice Inspection Activities - PWR 03/13/2006 03/17/2006 Baseline Inspections EB3SGISI - U3 STEAM GENERATOR ISI 2 3 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 3, 4 IP 7111121 Safety System Design and Performance Capability 08/14/2006 08/18/2006 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 5 3, 4 IP 7111121 Safety System Design and Performance Capability 08/28/2006 09/01/2006 Baseline Inspections 3, 4 IP 7111121 Safety System Design and Performance Capability 09/11/2006 09/15/2006 Baseline Inspections 3, 4 IP 7111121 Safety System Design and Performance Capability 09/25/2006 09/29/2006 Baseline Inspections EB3-ISI - U4 INSERVICE INSPECTION 1 4 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Turkey Point 08/30/2005 08:07:34 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3SGISI - U4 STEAM GENERATOR ISI 1 4 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 3 V23236 TURKEY POINT/EXAM AT POWER FACILITIES 10/30/2006 11/03/2006 Not Applicable OL EXAM - INITIAL EXAM 3 3 V23236 TURKEY POINT/EXAM AT POWER FACILITIES 11/27/2006 12/08/2006 Not Applicable TFP - TFP EB 2 3 3, 4 IP 7111105T Fire Protection [Triennial] 01/03/2007 01/05/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 3, 4 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/08/2007 01/12/2007 Baseline Inspections 3, 4 IP 7111117B Permanent Plant Modifications 01/08/2007 01/12/2007 Baseline Inspections TFP - TFP EB 2 3 3, 4 IP 7111105T Fire Protection [Triennial] 01/22/2007 01/26/2007 Baseline Inspections 3, 4 IP 7111105T Fire Protection [Triennial] 02/05/2007 02/09/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 3, 4 IP 7111401 Exercise Evaluation 02/19/2007 02/23/2007 Baseline Inspections 3, 4 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/19/2007 02/23/2007 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 02/19/2007 02/23/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.