Turkey Point Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 08:07:34 Report 22 1
EB3-HS
- HEAT SINK Baseline Inspections 08/29/2005 09/02/2005 Heat Sink Performance IP 7111107B 3, 4 1
PS1-RP
- RP PREINSPECTION PUBLIC Baseline Inspections 01/09/2006 01/11/2006 Access Control to Radiologically Significant Areas IP 7112101 3, 4 1
PS2-EP
- EP INSP Baseline Inspections 01/23/2006 01/27/2006 Alert and Notification System Testing IP 7111402 3, 4 Baseline Inspections 01/23/2006 01/27/2006 Emergency Response Organization Augmentation Testing IP 7111403 3, 4 Baseline Inspections 01/23/2006 01/27/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 3, 4 Baseline Inspections 01/23/2006 01/27/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3, 4 Baseline Inspections 01/23/2006 01/27/2006 Performance Indicator Verification IP 71151 3, 4 2
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 02/06/2006 02/10/2006 Maintenance Effectiveness IP 7111112B 3, 4 4
- PI&R Baseline Inspections 01/30/2006 02/17/2006 Identification and Resolution of Problems IP 71152B 3, 4 4
PS1-RP
- RP PUBLIC BASELINE Baseline Inspections 02/06/2006 02/10/2006 Access Control to Radiologically Significant Areas IP 7112101 3, 4 Baseline Inspections 02/06/2006 02/10/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 3, 4 Baseline Inspections 02/06/2006 02/10/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 3, 4 Baseline Inspections 02/06/2006 02/10/2006 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 3, 4 Baseline Inspections 02/06/2006 02/10/2006 Performance Indicator Verification IP 71151 3, 4 2
- REQUAL INSPECTION Baseline Inspections 02/27/2006 03/03/2006 Licensed Operator Requalification Program IP 7111111B 3, 4 2
EB3-ISI
- U3 INSERVICE INSPECTION Baseline Inspections 03/13/2006 03/17/2006 Inservice Inspection Activities - PWR IP 7111108P 3
2 EB3SGISI
- U3 STEAM GENERATOR ISI Baseline Inspections 03/20/2006 03/24/2006 Inservice Inspection Activities - PWR IP 7111108P 3
1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 08/14/2006 08/18/2006 Safety System Design and Performance Capability IP 7111121 3, 4 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 08/28/2006 09/01/2006 Safety System Design and Performance Capability IP 7111121 3, 4 Baseline Inspections 09/11/2006 09/15/2006 Safety System Design and Performance Capability IP 7111121 3, 4 Baseline Inspections 09/25/2006 09/29/2006 Safety System Design and Performance Capability IP 7111121 3, 4 1
EB3-ISI
- U4 INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 Inservice Inspection Activities - PWR IP 7111108P 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Turkey Point Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 08:07:34 Report 22 1
EB3SGISI
- U4 STEAM GENERATOR ISI Baseline Inspections 10/23/2006 10/27/2006 Inservice Inspection Activities - PWR IP 7111108P 4
3 OL PREP
- INITIAL EXAM PREP Not Applicable 10/30/2006 11/03/2006 TURKEY POINT/EXAM AT POWER FACILITIES V23236 3
3 OL EXAM
- INITIAL EXAM Not Applicable 11/27/2006 12/08/2006 TURKEY POINT/EXAM AT POWER FACILITIES V23236 3
3 TFP
- TFP EB 2 Baseline Inspections 01/03/2007 01/05/2007 Fire Protection [Triennial]
IP 7111105T 3, 4 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 01/08/2007 01/12/2007 Evaluation of Changes, Tests, or Experiments IP 7111102 3, 4 Baseline Inspections 01/08/2007 01/12/2007 Permanent Plant Modifications IP 7111117B 3, 4 3
TFP
- TFP EB 2 Baseline Inspections 01/22/2007 01/26/2007 Fire Protection [Triennial]
IP 7111105T 3, 4 Baseline Inspections 02/05/2007 02/09/2007 Fire Protection [Triennial]
IP 7111105T 3, 4 3
PS2-EP
- EP EXERCISE Baseline Inspections 02/19/2007 02/23/2007 Exercise Evaluation IP 7111401 3, 4 Baseline Inspections 02/19/2007 02/23/2007 Emergency Action Level and Emergency Plan Changes IP 7111404 3, 4 Baseline Inspections 02/19/2007 02/23/2007 Performance Indicator Verification IP 71151 3, 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.