Turkey Point Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 06:30:50 Report 22 3

DRS/EB1

- SUPPLEMENTAL INSPECTION 95001 Supplemental Program 03/19/2007 03/24/2007 3, 4 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 3

OL PREP

- INITIAL EXAM PREP Not Applicable 04/02/2007 04/06/2007 3

V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK1 Not Applicable 04/23/2007 05/02/2007 3

V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES 5

DRP3/PIR

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 05/21/2007 05/25/2007 3, 4 71152B IP Identification and Resolution of Problems Baseline Inspections 06/04/2007 06/08/2007 3, 4 71152B IP Identification and Resolution of Problems 2

EB3-MR

- MAINTENANCE EFFECTIVENESS Baseline Inspections 06/25/2007 06/29/2007 3, 4 7111112B IP Maintenance Effectiveness 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 08/06/2007 08/09/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas 2

EB3-HS

- HEAT SINK Baseline Inspections 08/27/2007 08/31/2007 3, 4 7111107B IP Heat Sink Performance 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP. WK1 Baseline Inspections 09/10/2007 09/14/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/10/2007 09/14/2007 3, 4 7112102 IP ALARA Planning and Controls Baseline Inspections 09/10/2007 09/14/2007 3, 4 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/10/2007 09/14/2007 3, 4 71151 IP Performance Indicator Verification 2

EB3-ISI

- U3 INSERVICE INSPECTION Baseline Inspections 09/17/2007 09/21/2007 3

7111108P IP Inservice Inspection Activities - PWR 2

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-3)

Safety Issues 09/24/2007 09/28/2007 3

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

2 EB3SGISI

- U3 STEAM GENERATOR ISI Baseline Inspections 09/24/2007 09/28/2007 3

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 09/24/2007 09/28/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/24/2007 09/28/2007 3, 4 7112102 IP ALARA Planning and Controls Baseline Inspections 09/24/2007 09/28/2007 3, 4 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/24/2007 09/28/2007 3, 4 71151 IP Performance Indicator Verification 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 12/03/2007 12/05/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas 2

OL RQ

- REQUALIFICATION INSPECTION Baseline Inspections 01/14/2008 01/18/2008 3, 4 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Turkey Point Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 06:30:50 Report 22 4

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 01/28/2008 02/01/2008 3, 4 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/28/2008 02/01/2008 3, 4 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/28/2008 02/01/2008 3, 4 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/28/2008 02/01/2008 3, 4 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/28/2008 02/01/2008 3, 4 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 01/28/2008 02/01/2008 3, 4 71151-PR01 IP RETS/ODCM Radiological Effluent 1

PSB1-EP

- EP INSP Baseline Inspections 02/25/2008 02/29/2008 3, 4 7111402 IP Alert and Notification System Testing Baseline Inspections 02/25/2008 02/29/2008 3, 4 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/25/2008 02/29/2008 3, 4 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/25/2008 02/29/2008 3, 4 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/25/2008 02/29/2008 3, 4 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/25/2008 02/29/2008 3, 4 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/25/2008 02/29/2008 3, 4 71151-EP03 IP Alert & Notification System 1

EB1-SUMP

- TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues 05/05/2008 05/09/2008 4

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 EB3-ISI

- U4 INSERVICE INSPECTION Baseline Inspections 05/05/2008 05/09/2008 4

7111108P IP Inservice Inspection Activities - PWR 7

EB1-CDBI

- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 08/25/2008 08/29/2008 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/08/2008 09/12/2008 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/22/2008 09/26/2008 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/29/2008 10/03/2008 3, 4 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.