September 1, 2015
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING UNIT 3 AND UNIT 4 (REPORT 05000250/2015005 AND 05000251/2015005)
Dear Mr. Nazar:
On August 12, 2015, the NRC completed its mid-cycle performance review of Turkey Point Nuclear Generating Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Turkey Point Nuclear Generating Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Nuclear Generating Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)
safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (404) 997-4539 with any questions you have regarding this letter.
Sincerely,
/RA/
LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure:
Turkey Point Inspection/Activity Plan (07/01/2015 - 06/30/2017)
cc: Distribution via Listserv
______________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII
SIGNATURE REW1 LJB4
NAME RWilliams LSuggs
DATE 8/24/2015 8/25/2015
E-MAIL COPY?
YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated September 1, 2015.
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING UNIT 3 AND UNIT 4 (REPORT 05000250/2015005 AND 05000251/2015005)
DISTRIBUTION:
G. Gamberoni, RII
L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Page 1 of 2 09/01/2015 10:33:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point Inspection / Activity Plan 09/01/2015 - 06/30/2017 OL RQ
- REQUAL INSP
3,4 IP Licensed Operator Requalification Program 7111111B 08/31/2015 09/04/2015 ISI
- UNIT 3 IN-SERVICE INSPECTION
3 IP Inservice Inspection Activities - PWR 7111108P 10/26/2015 10/30/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 1
3,4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/02/2015 11/06/2015 3,4 IP Occupational ALARA Planning and Controls 71124.02 11/02/2015 11/06/2015 3,4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/02/2015 11/06/2015 3,4 IP Occupational Dose Assessment 71124.04 11/02/2015 11/06/2015 3,4 IP Radiation Monitoring Instrumentation 71124.05 11/02/2015 11/06/2015 3,4 IP Performance Indicator Verification 71151 11/02/2015 11/06/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 2
3,4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/16/2015 11/20/2015 3,4 IP Occupational ALARA Planning and Controls 71124.02 11/16/2015 11/20/2015 3,4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/16/2015 11/20/2015 3,4 IP Occupational Dose Assessment 71124.04 11/16/2015 11/20/2015 3,4 IP Radiation Monitoring Instrumentation 71124.05 11/16/2015 11/20/2015 3,4 IP Performance Indicator Verification 71151 11/16/2015 11/20/2015 EP
- EP PROGRAM INSPECTION
3,4 IP Alert and Notification System Testing 7111402 01/11/2016 01/15/2016 3,4 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 01/11/2016 01/15/2016 3,4 IP Emergency Action Level and Emergency Plan Changes 7111404 01/11/2016 01/15/2016 3,4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 01/11/2016 01/15/2016 3,4 IP Performance Indicator Verification 71151 01/11/2016 01/15/2016 ISI
- UNIT 4 IN-SERVICE INSPECTION
4 IP Inservice Inspection Activities - PWR 7111108P 04/04/2016 04/08/2016 SGISI
- UNIT 4 SG IN-SERVICE INSPECTION
4 IP Inservice Inspection Activities - PWR 7111108P 04/11/2016 04/15/2016 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
3,4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2016 04/22/2016 3,4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/18/2016 04/22/2016 HS
- TRIENNIAL HEAT SINK PERFORMANCE
3,4 IP Heat Sink Performance 7111107T 07/18/2016 07/22/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 09/01/2015 10:33:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point Inspection / Activity Plan 09/01/2015 - 06/30/2017 OL EXAM
- INITIAL LICENSE EXAM PREP
3 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIES V23476 07/25/2016 07/29/2016 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
3,4 IP Problem Identification and Resolution 71152B 08/08/2016 08/12/2016 3,4 IP Problem Identification and Resolution 71152B 08/22/2016 08/26/2016 OL EXAM
- INITIAL LICENSE EXAM
3 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIES V23476 08/22/2016 09/02/2016 TFPI
- TRIENNIAL FIRE PROTECTION INSPECTION
3,4 IP Fire Protection [Triennial]
7111105T 10/31/2016 11/04/2016 3,4 IP Fire Protection [Triennial]
7111105T 11/14/2016 11/18/2016 RP
- RP PUBLIC RAD SAFETY BASELINE
3,4 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/05/2016 12/09/2016 3,4 IP Radiological Environmental Monitoring Program 71124.07 12/05/2016 12/09/2016 3,4 IP Performance Indicator Verification 71151 12/05/2016 12/09/2016 EP
- EP EXERCISE
3,4 IP Exercise Evaluation 7111401 02/20/2017 02/24/2017 3,4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/20/2017 02/24/2017 3,4 IP Exercise Evaluation - Scenario Review 7111408 02/20/2017 02/24/2017 3,4 IP Performance Indicator Verification 71151 02/20/2017 02/24/2017 CDBI
- COMPONENT DESIGN BASIS INSPECTION
3,4 IP Component Design Bases Inspection 7111121 06/26/2017 06/30/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure